BOQ

BATCHING PLANT
Site : DANKUNI Date :14/06/2021
SL Rate Amount
Description of Work Unit Qnty
No. (Rs.)
Providing Bored Cast-in-situ M25 grade R.C.C. pile in (Rs)
position as per specifications in all kinds of soil including
cost of boring using drilling mud to stabilize the bore and
flushing the bore of excess mud with freshly prepared
drilling fluid by using pumps prior to placing concrete by
tremie pipe in one continuous operation and including the
cost of all materials and labour for placing of concrete and
also including the cost of mobilization and hire charges of
all equipment necessary for boring, welding of
reinforcement cage as necessary and lowering of
reinforcement cage, preparation and placing of concrete,
including the cost of concrete but excluding the cost of
reinforcement and labour for bending binding etc. complete
as per Drawing and Technical Specifications and removal
of excavated earth with all lifts and lead upto 1000 m. and
1 also removal of mud/sludge/slurry/liquid earth obtained
during piling work from the working site and disposal of
the same beyond the KMC/Municipal or any suitable area
with conformity of Municipal Corporation Rules using
tanker including loading and unloading the same with
pump, clearing the site complete in all respect as per
direction of the Engineer-in-charge.Work to be executed as
per IS: 2911 (Part II Sec 2).
(b) Using tripod, winches
i) Pile diameter - 450 mm.
2P Mtr. 210.00 -
3P Mtr. 126.00 -
5P Mtr. 105.00 -
12P Mtr. 252.00 -
15P Mtr. 315.00 -
Earth work in excavation of foundation trenches or
drains, in all sorts of soil (including mixed soilbut
excluding laterite or sandstone) including removing,
spreading or stacking the spoils withina lead of 75 m. as Cum. 100.00 -
2 directed. The item includes necessary trimming the sides of
trenches,levelling, dressing and ramming the
bottom,bailing out water as required complete.

Earth work in filling in foundation trenches orplinth


with good earth, in layers not exceeding150 mm. including
watering and ramming etc.layer by layer complete.
3 (Payment to be made onthe basis of measurement of Cum. 66.00 -
finished quantity ofwork).(a) With earth obtained from
excavation of
foundation.
SL Rate Amount
Description of Work Unit Qnty
No. (Rs.)
Reinforcement for reinforced concrete work in all sorts of (Rs)
structures including distribution bars, stirrups, binders
etc initial straightening and removal of loose rust (if
necessary), cutting to requisite length, hooking and
bending to correct shape, placing in proper position and
binding with 16 gauge black annealed wire at every
intersection, complete as per drawing and direction
4 For All Pile Cap (2p,3p,5p,12p,15p) kg 17400.00 -
For only Pile
2P kg 3365.00 -
3P kg 2104.00 -
5P kg 1755.00 -
12P kg 4210.00 -
15P kg 5260.00 -
Batch Mixed concrete of M 25 Grade with well Graded
stone chips of 20 mm nominal size containing designed
quantity of cement per Cu. M of Wet concrete produced in
computerised batching plant under controlled condition
using approved super plasticizer designing concrete mix
following I.S 10262 and I.S. 456 transporting the mix with
agitation in transit mixer to work site and then placing the
5 mix in its final location and curing the same complete as
per specification and direction of the Engineer-in charge.
2P Cum. 3.48 -
3P Cum. 7.13 -
5P Cum. 13.09 -
12P Cum. 31.86 -
15P Cum. 55.28 -
Hire and labour charges for shuttering with centering and
necessary staging upto 4 mt. using approved stout props
and thick hard wood planks of approved thickness with
required bracing for concrete slabs, beams and columns,
6 lintels curved or straight including fitting, fixing and Sqm. 156.00 -
striking out after completion of works (upto roof of ground
floor) b)Above 30 mm & upto 37 mm thick wooden
shuttering as per decision & direction of Engineer-In-
Charge.
TOTAL COST OF BATCHING PLANT -