MASS HALL

OFFICE BUILDING

Siding Track 1

Siding Track 2

Siding Track 3
Future Track

Future Track

Future Track

Future Track
Mainline
6.50 14.00 6.50 6.50 6.50 5.10 9.50 5.15 6.99 8.00 6.80 1.06 11.34 1.40 6.32
CL

Walkway
WEIGHBRIDGE
Walkway Landscape
Service Road Walkway

0.6
Channel

TRAPEZODIAL TRAPEZODIAL TRAPEZODIAL

STRIPPING
CHANNEL 75 DEGREE WALL ANGLE CHANNEL 75 DEGREE WALL ANGLE CHANNEL 75 DEGREE WALL ANGLE

C2 Type Manhole C2 Type Manhole C2 Type Manhole

KILOMETRE= 388+720
SECTION D-D

Excavation Earthwork Volumes

Stripping Excavation Volume= 85 270


SHELTER

Siding Track 3
Siding Track 4
Future Track
CL

Mainline
28.58 6.50 5.93 0.79 4.70

KILOMETRE= 388+420
SECTION C-C
Siding Track 4

CL

Note(1)only for track side


Mainline

4.11 7.94 4.70


For Cut Sections:
Prepared Subgrade thickness shall be "50cm" for Soil cuts as per UIC719, and

Et h

on
p

ti
"20cm" for Rock cuts in order to regulate the surface.
ia

io
n po

ra
Ra i r
lway s Co

For Fill Sections:


As per UIC719, Prepared Subgrade thickness shall be "35cm" for QS2 type fill material and
"0cm" for QS3 type fill material.
THIS DRAWING MUST NOT BE EITHER LOANED, COPIED OR OTHERWISE REPRODUCED IN WHOLE OR IN PART OR USED FOR ANY PURPOSE

Note(2)

Passenger platform is not include in the scope of work.

KILOMETRE= 388+340
SECTION B-B

merkezi

merkezi

HARA GEBEYA STATION


Siding Track 4
Mainline

3.46 4.70 5.97


CL

3.46 4.70
GRADING SECTIONS

DRAWN BY DESIGNED BY CHECKED BY APPROVED BY APPROVED BY APPROVED BY

ZEYNEP UYGUN

A1 DRAWING NO

KILOMETRE= 388+200 1:200

SECTION A-A
07.11.2017

1/1