Procedure of DC Highpot For Cable Sheath For Upload
Procedure of DC Highpot For Cable Sheath For Upload
1) Ensure that the Cable has been de-energized and the Circuit is dead.
3) Barricade the test area, include the remote end, with 'RED/WHITE' danger tape and
warning signboard.
During High Voltage Test, two watch-men must be provided outside the
Caution ! barricaded area to stop others to enter the test area.
4) Measure the insulation resistance for cable indivisually with other phases ground
5000V DC megger, before the test. Follow by discharge the cable for 22KV
5) Prepare the cable Sheath for both end od the cable for hipot ( Free from Core )
6) Slowly increase the test voltage and notedown the leakage of the cable Sheath
7) After 1 minutes, slowly reduce the test voltage to zero and switch OFF the power supply
Hazardous voltages are still present in this test equipment after switch off.
Warning ! Discharge the test equipment before touching. Non-observance of the rules can
result in severe person injury or equipment damage.
9) Measure the insulation resistance for cable indivisually with other phases ground