Boq U Mar 001 0

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

JOB NO. DOC. NO. REV.

241007 241007-BOQ-MAR-001 0

PERBAIKAN MOORING DOLPHIN DAN PEKERJAAN CATWALK BARU


DI LUBUK GAUNG, RIAU
BILL OF QUANTITY

BILL OF QUANTITY
241007-BOQ-MAR-001-0

Proj. ID :
241007

Proj. Tittle :
PERBAIKAN MOORING DOLPHIN DAN PEKERJAAN CATWALK BARU
DI LUBUK GAUNG, RIAU
PT. SINAR MAS AGRO RESOURCES AND TECHNOLOGY

Contract No. :
9600172149

Client :
PT. SINAR MAS AGRO RESOURCES AND TECHNOLOGY

Proj. Location :
LUBUK GAUNG - RIAU
INDONESIA
2024

By Date
REV DATE PAGES DESCRIPTION PREP'D CHK'D APP'D
CLIENT
PROCEDURE AUTHORIZATION

PREPARED BY:

NAME SIGNATURE

ENGINEER
POSITION DATE

CHECKED BY:

NAME SIGNATURE

POSITION DATE

APPROVED BY:

NAME SIGNATURE

TEAM LEADER
POSITION DATE
# Put Logo Here # # Put Logo Here #

REKAPITULASI BILL OF QUANTITY


PERBAIKAN MOORING DOLPHIN DAN PEKERJAAN CATWALK BARU
DI LUBUK GAUNG, RIAU
PT. SINAR MAS AGRO RESOURCES AND TECHNOLOGY

TOTAL
No. DESCRIPTION
(IDR)

I. Pekerjaan Persiapan
II. Perbaikan Mooring Dolphin
III. Pekerjaan Catwalk Baru
TOTAL
PROFIT & FEE
TOTAL PROJECT COST
# Put Logo Here # # Put Logo Here #

# Put Logo Here # BILL OF QUANTITY


PERBAIKAN MOORING DOLPHIN DAN PEKERJAAN CATWALK BARU
DI LUBUK GAUNG, RIAU
PT. SINAR MAS AGRO RESOURCES AND TECHNOLOGY

TOTAL TOTAL
No. DESCRIPTION QUANTITY UNIT
(IDR) (IDR)

1. Pekerjaan Persiapan
1.1 Mobilisasi dan Demobilisasi 1.00 ls
1.2 Direksi Keet dan Fasilitas Sementara 1.00 ls
1.3 Administrasi, Dokumentasi, sarana kantor & Komunikasi 1.00 ls
Sub-Total 1 -
2. Perbaikan Mooring Dolphin
2.1 Pekerjaan Temporary Platform
2.1.1 Temporary Platform 104.00 m2
2.2 Perbaikan Beton
2.2.1 Struktur Atas
2.2.1.1 Sisi A
- Pekerjaan Pembersihan 1.50 m2
- Pekerjaan Injection Grouting 25.00 titik
2.2.1.2 Sisi C
- Pekerjaan Pembersihan 1.52 m2
- Pekerjaan Injection Grouting 25.00 titik
2.2.1.3 Upper Deck
- Pekerjaan Chipping 10.69 m2
- Pekerjaan Pembersihan 10.69 m2
- Pekerjaan Grouting (inc bekisting) 0.02 m3
- Pekerjaan Injection Grouting 172.00 titik
2.2.2 Struktur Bawah
1 2.2.2.1 Under Deck
- Pekerjaan Chipping 6.67 m2
- Pekerjaan Pembersihan 6.67 m2
- Pekerjaan Grouting (inc bekisting) 0.63 m3
- Pekerjaan Injection Grouting 26.00 titik
2.3 Penggantian HDPE Jacket
2.3.1 HDPE Jacket Splash Zone 159.59 m2
Sub-Total 2 -
3. Pekerjaan Catwalk Baru
3.1 Anchor
3.1.1 Pekerjaan Pembongkaran 0.16 m3
3.1.2 Base Plate
3.1.2.1 12x300x400 46.00 kg
3.1.3 Leveling Plate
3.1.3.1 12x300x400 46.00 kg
3.1.4 Anchorbolt M32 8.00 nos
3.1.5 Pekerjaan Grouting 0.17 m3
3.2 Beam
3.2.1 WF.500.200.10.16 3,572.00 kg
3.2.2 WF.200.200.8.12 255.00 kg
3.2.3 Joint
3.2.3.1 Splice Plate 280x290 41.00 kg
3.2.3.2 Stiffener Plate 8x95x468@1500 167.00 kg
3.2.3.3 Bolt 8M16 16.00 nos
3.2.3.4 Bolt 2M16 120.00 nos
3.3 Lantai
3.3.1 Grating Plate 2,642.00 kg
3.3.2 Joint
3.3.2.1 Bolt M8-700 58.00 nos
3.4 Railing
3.4.1 GSP ø2" 597.00 kg
3.4.2 Joint
3.4.2.1 Plate 46.00 kg
3.4.2.2 Bolt 4M8 104.00 nos
Sub-Total 3 -
Total 1+2+3 -