CSS NCII-Session Plan

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

SESSION PLAN

Sector : ELECTRONICS SECTOR

Qualification Title : COMPUTER SYSTEMS SERVICING NC II

Unit of Competency : SET-UP COMPUTER NETWORKS

Module Title : SETTING-UP COMPUTER NETWORKS


Learning Outcomes:
Upon completion of this module, students/trainees will be able to:
LO 1. Install network cables
LO 2. Set network configuration
LO 3. Set router/Wi-Fi/ wireless access point/repeater configuration
LO 4. Inspect and test the configured computer networks

A. INTRODUCTION
This unit is designed to equip learners with the necessary skills to set up computer networks tailored for Local Area
Networks (LANs) and Small Office Home Office (SOHO) systems. Learners will delve into a range of competencies,
encompassing the installation of network cables, configuration of network settings, and setup of various network
components such as routers, Wi-Fi access points, and repeaters. Additionally, learners will acquire the proficiency to
inspect and test configured computer networks, ensuring optimal functionality and performance.

B. LEARNING ACTIVITIES

Date Developed: July 2010 Document No.


Date Revised: February Issued by:
2012 Page 1 of 8
Trainers Methodology Level I
Developed by: Mindanao State
PINKY A. GUMOGDA University- Maguindanao
Revision # 01
LO1: INSTALL NETWORK CABLES

Learning
Methods Presentation Practice Feedback Resources Time
Content
 Planning •Lecture  Read • CBLM
 Answer Self  Instructor 7 Hrs.
and Demonstration information  Desktop/Laptop
Method Check 2.1-1 checking
Preparation sheet 2.1-1 on on Planning answers  Projector
for Network Planning and  Projection Screen
and based on
Cable Preparation for  Still Visuals
Preparation answer key
Installation Network Cable  Motion Visuals
for Network 2.1-1 on
Installation  Network topology
Cable Planning
 Multimedia Installation and  Distribution
Presentation Preparation terminals
for Network
Cable
Installation
 Actual  Perform Job  CBLM
 Instructor
demonstration Sheet 2.1-1 evaluate  Cables
on Network on Planning  Fiber optics
performance
Design and  copper
using
Preparation  terminals
performance
for Network  cable raceway/duct
criteria
Cable  clamps
checklist
Installation  fasteners
2.1-1 on
Planning  insulators
and  terminal box
Preparation Protective eyewear
for Network  Digital multi-meter
Date Developed: July 2010 Document No.
Date Revised: February Issued by:
2012 Page 2 of 8
Trainers Methodology Level I
Developed by: Mindanao State
PINKY A. GUMOGDA University- Maguindanao
Revision # 01
Cable  Wire stripper with
Installation bolt cutter
 Pliers (assorted)
 Screw drivers
(assorted)
 LAN Tester
 Crimping tools
 Gloves
 Goggles
 Working clothes

 Safety &  Lecture  Read  Answer  Instructor • CBLM


5 Hrs.
Compliance Demonstration information Self Check checking  Computer Set
for Network Method sheet 2.1-2 on 2.1-2 on answers based  Projector
Cable Safety & Safety & on answer key  Projection Screen
Installation Compliance for Compliance 2.1-2 on Safety  Still Visuals
Network Cable for Network & Compliance  Motion Visuals
Installation Cable for Network
 Work area
Installation Cable • terminals
 Multimedia  Devices) Installation • cable raceway/duct
Presentation • clamps
• fasteners
• insulators
• terminal box Protective
eyewear
• Digital multi-meter
• Wire stripper with bolt
cutter
• Pliers (assorted)

Date Developed: July 2010 Document No.


Date Revised: February Issued by:
2012 Page 3 of 8
Trainers Methodology Level I
Developed by: Mindanao State
PINKY A. GUMOGDA University- Maguindanao
Revision # 01
• Screw drivers
(assorted)
• LAN Tester
• Crimping tools
• Gloves
• Goggles
• Working clothes

 Actual  Perform  Instructor  Work Area


demonstration Task Sheet evaluate  Computer Set
on Safety & 2.1-2 on performance  terminals
Compliance for Safety & using  cable raceway/duct
Network Cable Compliance performance  clamps
Installation for Network Criteria  fasteners
Cable Checklist 2.1-2  insulators
Installation on Safety &  terminal box
Compliance for Protective eyewear
Network Cable  Digital multi-meter
Installation
 Wire stripper with
bolt cutter
 Pliers (assorted)
 Screw drivers
(assorted)
 LAN Tester
 Crimping tools
 Gloves
 Goggles
 Working clothes

Date Developed: July 2010 Document No.


Date Revised: February Issued by:
2012 Page 4 of 8
Trainers Methodology Level I
Developed by: Mindanao State
PINKY A. GUMOGDA University- Maguindanao
Revision # 01
 Read  CBLM
 Answer Self  Compare
information Check 2.1-3 answer to  Desktop/Laptop
sheet 2.1-3 on  Work Area
on answer key
Installation  Projector
Installation 2.1-3 on
Execution of  Projection Screen
Execution of Installation
Network Cable  Still Visuals
Network Execution of
 Multimedia Cable Network  Motion Visuals
Presentation Cable  copper cable
 fiber optic cable
(terminated)
 Protective eyewear
 Installation  Digital multi-meter
Execution  Lecture  Wire stripper with
of Network Demonstration bolt cutter 7 Hrs.
Cable Method  Pliers (assorted)

 Actual  Perform  Evaluate  CBLM


demonstration on Task Sheet 2.1- performance  Desktop/Laptop
Splicing 3 on using  Work Area
Installation performance  copper cable
Execution of checklist 2.1-3  fiber optic cable
Network Cable on Installation (terminated)
Execution of  Protective eyewear
Network Cable  Digital multi-meter
 Wire stripper with
bolt cutter
 Pliers (assorted)
LO2: Set Network Configuration

Date Developed: July 2010 Document No.


Date Revised: February Issued by:
2012 Page 5 of 8
Trainers Methodology Level I
Developed by: Mindanao State
PINKY A. GUMOGDA University- Maguindanao
Revision # 01
1. Check  Lecture  Actual  CBLM
 Perform  Evaluate 5 Hrs.
Network Demonstration demonstration  Work Area
Task Sheet performance
Connectivity of Checking  Desktop Set
2.2-1 on using
Network  Testing device
Check performance
Connectivity Network checklist 2.2-1
Connectivity on Check
Network
Connectivity
2. Standard  Lecture  Actual  CBLM
 Perform  Evaluate 5 Hrs.
Operating Demonstration demonstration  Work Area
Task Sheet performance
Procedures on Standard  Desktop Set
2.2-2 on using
for Network Operating  Testing device
Standard performance
Configuratio Procedures for Operating checklist 2.2-2
n network Procedures on Standard
configuration for network Operating
configuratio Procedures for
n network
configuration

LO3: Set Router/Wi-Fi/ Wireless Access Point/Repeater Configuration


1. Client  Lecture  Actual  CBLM
 Perform  Evaluate 5 Hrs.
Device (LAN, Demonstration demonstration  Work Area
Task Sheet performance
WAN & on Client  Desktop Set
2.3-1 on using
Wireless Device (LAN,  Testing device
Client performance
Setting) WAN &  Cables
Device (LAN, checklist 2.3-1
Configuratio Wireless  Fiber optics
WAN & on Client
n Setting)  copper
Wireless Device (LAN,
Configuration  terminals
Setting) WAN &
Date Developed: July 2010 Document No.
Date Revised: February Issued by:
2012 Page 6 of 8
Trainers Methodology Level I
Developed by: Mindanao State
PINKY A. GUMOGDA University- Maguindanao
Revision # 01
Configuratio Wireless  cable raceway/duct
n Setting)  clamps
Configuration  fasteners
 insulators
 terminal box
 Protective eyewear
 Digital multi-meter
 Wire stripper with
bolt cutter
 Pliers (assorted)
 Screw drivers
(assorted)
 LAN Tester
 Crimping tools
 Gloves
 Goggles
 Working clothes
 Laptop
 Desktop
 Network storage
 Network printer
2. Security/  Lecture  Actual  Desktop
 Perform  Evaluate 3 Hrs.
Firewall/Adv Demonstration demonstration  Network storage
Task Sheet performance
ance settings on  Network printer
2.3-2 using
Configuratio Security/Firew Security/Fir performance
n all/Advance ewall/Advan checklist 2.3-2
settings ce settings on
Configuration Configuratio Security/Firew
n all/Advance
Date Developed: July 2010 Document No.
Date Revised: February Issued by:
2012 Page 7 of 8
Trainers Methodology Level I
Developed by: Mindanao State
PINKY A. GUMOGDA University- Maguindanao
Revision # 01
settings
Configuration
Setting)
Configuration

LO3: Inspect and Test the Configured Computer Networks


1. Computer  Lecture  Actual  Desktop
 Perform  Evaluate 3 Hrs.
Network Demonstration demonstration  Network storage
Task Sheet performance
Inspection on Computer  Network printer
2.4-1 using
Network Computer performance
Inspection Network checklist 2.4-1
Inspection on Computer
Network
Inspection

C. ASSESSMENT PLAN
 Practical Demonstration w/ oral questioning
 Written Test
 Portfolio
D. TEACHER’S SELF-REFLECTION OF THE SESSION

Date Developed: July 2010 Document No.


Date Revised: February Issued by:
2012 Page 8 of 8
Trainers Methodology Level I
Developed by: Mindanao State
PINKY A. GUMOGDA University- Maguindanao
Revision # 01

You might also like