PROJECT TITLE : CADANGAN MEMBINA RUMAH BERKEMBAR

FASA 6: 14 UNIT RUMAH BERKEMBAR DUA TINGKAT (JENIS 4SD1A) DI


ATAS PT 20047, BLOK 4, BANDAR TASIK PUTERI, MUKIM RAWANG,
DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR

TAKING-OFF LIST
ELEMENT NO.6 : EXTERNAL WALL
ITEM DESCRIPTION UNIT

BRICKLAYER
Cement and sand brick as described in high quality
cement mortar (1:3) with plasticiser reinforced with and
including a layer of ' Exmet ' at every fourth course:-
1 Half brickwall.

2 One brickwall.

Bituminous felt damp - proof course as described well -


lapped at joints on and including 19mm bed of cement
and sand (1:3) coated with hot bitumen ( measured nett -
No allowance made for laps ):-
3 horizontal damp - proof course 110mm wide laid on brickwall.

4 horizontal damp - proof course 230mm wide laid on brickwall.


PROJECT TITLE : CADANGAN MEMBINA RUMAH BERKEMBAR
FASA 6: 14 UNIT RUMAH BERKEMBAR DUA TINGKAT (JENIS 4SD1A) DI
ATAS PT 20047, BLOK 4, BANDAR TASIK PUTERI, MUKIM RAWANG,
DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR

TAKING-OFF LIST
ELEMENT NO.4 : WINDOW
ITEM DESCRIPTION UNIT

CONCRETOR

1 125mm x 225mm Lintol reinforced with and including


2 Nos. 12mm diameter high tensile steel bar hooked at m
both ends and 6mm diameter mild steel links at 200mm
centres including all necessary formwork

2 125mm x 225mm Lintol reinforced with and including


2 Nos. 10mm diameter high tensile steel bar hooked at m
both ends and 6mm diameter mild steel links at 200mm
centres including all necessary formwork

ALUMINIUM WORK

Supply, deliver to site and fix the following 1.1mm thick


powder coated aluminium window infilled with 6mm thick
obsecured glass complete with all necessary frames,
sub-frame, mullion and transome; glazing material,
glazing gasket, fixing screws, ironmongery and other
accessories all in accordance to the manufacturer's
instruction and specifications and Architect's Approval:-

3 Composite unit overall size 750mm wide x 1200mm high


comprising 750mm x 600mm high top hung casement No
window and 750mm x 600mm high fixed glass panel
below (Type W10)

4 Top hung casement window overall size 800mm x No


600mm high (Type W11)

5 Composite unit overall size 600mm wide x 900mm high


comprising 600mm x 450mm high top hung casement No
window and 600mm x 450mm high fixed glass panel
below (Type W12)
Supply, deliver to site and fix the following 1.1mm thick
powder coated aluminium window infilled with 6mm thick
clear float glass complete with all necessary frames,
sub-frame, mullion and transome; glazing material,
glazing gasket, fixing screws, ironmongery and other
accessories all in accordance to the manufacturer's
instruction and specifications and Architect's Approval:-

6 Top hung casement window overall size 1800mm x No


750mm high in 3 Nos. panels (Type W13)

ALUMINIUM WORK

Supply, deliver to site and fix the following 1.1mm thick


powder coated aluminium window infilled with 6mm thick
clear float glass complete with all necessary frames,
mullion and transome; glazing material, glazing gasket,
fixing screws, ironmongery and other accessories all in
accordance to the manufacturer's instruction and
specifications and Architect's Approval:-

7 Composite unit overall size 3400mm wide x 2400mm


high comprising 2 equal top hung casement window each No
size 600mm x 750mm high, 2 equal side hung casement
window each size 600mm x 900mm high and 11 fixed
panel in various size (Type W1)

8 Composite unit overall size 3300mm wide x 1950mm


high comprising 2 equal side hung casement window No
each size 450mm x 1200mm high and 6 fixed panel in
various size (Type W2)

9 Composite unit overall size 450mm wide x 2400mm high


comprising 450mm x 750mm high top hung casement No
window and 450mm x 900mm high side hung casement
window and 450mm x 750mm high fixed panel below
(Type W3)
10 Composite unit overall size 450mm wide x 1950mm high
comprising 450mm x 1200mm high side hung casement No
window and 450mm x 750mm high fixed panel below
(Type W4)

11 Composite unit overall size 3000mm wide x 1200mm


high comprising 2 equal side hung casement window No
each size 600mm x 1200mm high and 2 fixed panel each
size 900mm x 1200mm high (Type W5)

12 Composite unit overall size 2400mm wide x 1650mm


high comprising 3 equal top hung casement window each
size 600mm x 450mm high, 3 equal side hung casement No
window each size 600mm x 1200mm high and 600mm x
1200mm high fixed panel (Type W6)

13 Side hung casement window overall size 1200mm x No


1200mm high in 2 Nos. panels (Type W7)

14 Side hung casement window overall size 600mm x No


1200mm high (Type W8)

15 Side hung casement window overall size 750mm x No


900mm high (Type W9)
PROJECT TITLE : CADANGAN MEMBINA RUMAH BERKEMBAR
FASA 6: 14 UNIT RUMAH BERKEMBAR DUA TINGKAT (JENIS 4SD1A) DI
ATAS PT 20047, BLOK 4, BANDAR TASIK PUTERI, MUKIM RAWANG,
DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR

TAKING-OFF LIST
ELEMENT NO. : INTERNAL WALL
ITEM DESCRIPTION UNIT

BRICKWORK
Cement and sand brick as described in high quality
cement mortar (1:3) with plasticiser reinforced with and
including a layer of ' Exmet ' at every fourth course:-
1 Half brickwall.

2 One brickwall - Partywall.

3 One brickwall - To Staircase.

Bituminous felt damp - proof course as described well -


lapped at joints on and including 19mm bed of cement
and sand (1:3) coated with hot bitumen ( measured nett -
No allowance made for laps ):-
3 horizontal damp - proof course 110mm wide laid on brickwall.

4 horizontal damp - proof course 230mm wide laid on


brickwall - Partywall.

4 horizontal damp - proof course 230mm wide laid on


brickwall - To Staircase.
PROJECT TITLE : CADANGAN MEMBINA RUMAH BERKEMBAR
FASA 6: 14 UNIT RUMAH BERKEMBAR DUA TINGKAT (JENIS 4SD1A) DI
ATAS PT 20047, BLOK 4, BANDAR TASIK PUTERI, MUKIM RAWANG,
DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR

TAKING-OFF LIST
ELEMENT NO.6 : EXTERNAL WALL
ITEM DESCRIPTION UNIT

BRICKLAYER
Cement and sand brick as described in high quality
cement mortar (1:3) with plasticiser reinforced with and
including a layer of ' Exmet ' at every fourth course:-
1 Half brickwall.

2 One brickwall.

Bituminous felt damp - proof course as described well -


lapped at joints on and including 19mm bed of cement
and sand (1:3) coated with hot bitumen ( measured nett -
No allowance made for laps ):-
3 horizontal damp - proof course 110mm wide laid on brickwall.

4 horizontal damp - proof course 230mm wide laid on brickwall.


BILLING PAPER

Index No. 20WVR12838 Page: : 1

Project: 1 Unit Double Storey Banglow Drawing Ref :

ITEM NO. DESCRIPTION QUANTITY UNIT RATE (RM) AMOUNT (RM)

BRICKLAYER

Cement and sand brick as described in high quality


cement mortar (1:3) with plasticiser reinforced with and
including a layer of ' Exmet ' at every fourth course:-

1 Half brickwall. 153

2 One brickwall. 27

Bituminous felt damp - proof course as described well -


lapped at joints on and including 19mm bed of cement
and sand (1:3) coated with hot bitumen ( measured nett -
No allowance made for laps ):-

3 horizontal damp - proof course 110mm wide laid on brick 26

wall

horizontal damp - proof course 230mm wide laid on brick 12


4 wall

TOTAL
H1/1/1
BILLING PAPER

Index No. 20WVR12838 Page: : 2

Project: 1 Unit Double Storey Banglow Drawing Ref :

ITEM NO. DESCRIPTION QUANTITY UNIT RATE (RM) AMOUNT (RM)

TOTAL
H1/1/2
BILLING PAPER

Index No. 20WVR12838 Page: : 3

Project: 1 Unit Double Storey Banglow Drawing Ref :

ITEM NO. DESCRIPTION QUANTITY UNIT RATE (RM) AMOUNT (RM)

TOTAL
H1/1/3
BILLING PAPER

Index No. 20WVR12838 Page: : 4

Project: 1 Unit Double Storey Banglow Drawing Ref :

ITEM NO. DESCRIPTION QUANTITY UNIT RATE (RM) AMOUNT (RM)

TOTAL
H1/1/4
BILLING PAPER

Index No. 19WVR05695 Page: : 1

Project: Double storey Semi-D (Type 4SD1A) Drawing Ref : KCYS123/SD1A/CD/101,102,501,502

ITEM NO. DESCRIPTION QUANTITY UNIT RATE (RM) AMOUNT (RM)

ELEMENT NO.4 : WINDOW

CONCRETOR

A 125mm x 225mm Lintol reinforced with and including 22 M


2 Nos. 12mm diameter high tensile steel bar hooked at
both ends and 6mm diameter mild steel links at 200mm
centres including all necessary formwork

B 125mm x 225mm Lintol reinforced with and including 12 M


2 Nos. 10mm diameter high tensile steel bar hooked at
both ends and 6mm diameter mild steel links at 200mm
centres including all necessary formwork

ALUMINIUM WORK

Supply, deliver to site and fix the following 1.1mm thick


powder coated aluminium window infilled with 6mm thick
obsecured glass complete with all necessary frames,
sub-frame, mullion and transome; glazing material,
glazing gasket, fixing screws, ironmongery and other
accessories all in accordance to the manufacturer's
instruction and specifications and Architect's Approval:-

Composite unit overall size 750mm wide x 1200mm high


C 1 No
comprising 750mm x 600mm high top hung casement
window and 750mm x 600mm high fixed glass panel
below (Type W10)

Top hung casement window overall size 800mm x


D 1 No
600mm high (Type W11)

Composite unit overall size 600mm wide x 900mm high


E 3 No
comprising 600mm x 450mm high top hung casement
window and 600mm x 450mm high fixed glass panel
below (Type W12)

TOTAL
WD/1/1
BILLING PAPER

Index No. 19WVR05695 Page: : 2

Project: Double storey Semi-D (Type 4SD1A) Drawing Ref : KCYS123/SD1A/CD/101,102,501,502

ITEM NO. DESCRIPTION QUANTITY UNIT RATE (RM) AMOUNT (RM)

ELEMENT NO.4 : WINDOW (CON'T)

ALUMINIUM WORK

Supply, deliver to site and fix the following 1.1mm thick


powder coated aluminium window infilled with 6mm thick
clear float glass complete with all necessary frames,
sub-frame, mullion and transome; glazing material,
glazing gasket, fixing screws, ironmongery and other
accessories all in accordance to the manufacturer's
instruction and specifications and Architect's Approval:-

Top hung casement window overall size 1800mm x


A 1 No
750mm high in 3 Nos. panels (Type W13)

Supply, deliver to site and fix the following 1.1mm thick


powder coated aluminium window infilled with 6mm thick
clear float glass complete with all necessary frames,
mullion and transome; glazing material, glazing gasket,
fixing screws, ironmongery and other accessories all in
accordance to the manufacturer's instruction and
specifications and Architect's Approval:-

Composite unit overall size 3400mm wide x 2400mm


B 2 No
high comprising 2 equal top hung casement window each
size 600mm x 750mm high, 2 equal side hung casement
window each size 600mm x 900mm high and 11 fixed
panel in various size (Type W1)

Composite unit overall size 3300mm wide x 1950mm


C 2 No
high comprising 2 equal side hung casement window
each size 450mm x 1200mm high and 6 fixed panel in
various size (Type W2)

Composite unit overall size 450mm wide x 2400mm high


D 1 No
comprising 450mm x 750mm high top hung casement
window and 450mm x 900mm high side hung casement
window and 450mm x 750mm high fixed panel below
(Type W3)

Composite unit overall size 450mm wide x 1950mm high


E 2 No
comprising 450mm x 1200mm high side hung casement
window and 450mm x 750mm high fixed panel below
(Type W4)

Composite unit overall size 3000mm wide x 1200mm


F 1 No
high comprising 2 equal side hung casement window
each size 600mm x 1200mm high and 2 fixed panel each
size 900mm x 1200mm high (Type W5)

TOTAL
WD/1/2
BILLING PAPER

Index No. 19WVR05695 Page: : 3

Project: Double storey Semi-D (Type 4SD1A) Drawing Ref : KCYS123/SD1A/CD/101,102,501,502

ITEM NO. DESCRIPTION QUANTITY UNIT RATE (RM) AMOUNT (RM)

ELEMENT NO.4 : WINDOW (CON'T)

ALUMINIUM WORK

Supply, deliver to site and fix the following 1.1mm thick


powder coated aluminium window infilled with 6mm thick
clear float glass complete with all necessary frames,
mullion and transome; glazing material, glazing gasket,
fixing screws, ironmongery and other accessories all in
accordance to the manufacturer's instruction and
specifications and Architect's Approval:-

Composite unit overall size 2400mm wide x 1650mm


A 1 No
high comprising 3 equal top hung casement window each
size 600mm x 450mm high, 3 equal side hung casement
window each size 600mm x 1200mm high and 600mm x
1200mm high fixed panel (Type W6)

Side hung casement window overall size 1200mm x


B 1 No
1200mm high in 2 Nos. panels (Type W7)

Side hung casement window overall size 600mm x


C 3 No
1200mm high (Type W8)

Side hung casement window overall size 750mm x


D 1 No
900mm high (Type W9)

TOTAL
WD/1/3
Taking-Off Paper
Page : 1
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level Excavate trench for ground beam not
Excavation exceeding 1.50 deep commencing from
formation level, get out, deposit, spread and
Excavate pit for pile caps not exceeding level where directed within site, backfilling
1.50 deep commencing from formation level, and remainder dispose off site to Contractor's
get out, deposit, spread and level where own dump.
directed within site, backfilling and remainder
dispose off site to Contractor's own 7.90 (GF - HB1a
dump. 0.13
0.60 0.59
11/ 1.00 (F1
1.00 1.38 (GF - HB1b
0.25 2.75 0.13
0.45 0.08
8/ 1.30 (F2
1.30 2.33 (GF - HB1c
0.25 3.38 0.13
0.60 0.17
5/ 1.55 (F3
1.55 1.35 (GF - HB1A
0.25 3.00 0.13
0.60 0.10
5/ 1.90 (F4
1.90 2.03 (GF - HB2
0.25 4.51 0.13
0.60 0.15
5/ 2.30 (F5
2.30 9.67 (GF - HB3
0.30 7.93 0.13
0.60 0.73
3/ 2.50 (F6
2.50 13.68 (GF - HB4
0.35 6.56 0.13
0.60 1.03
3/ 2.85 (F7
2.85 5.88 (GF - HB5
0.40 9.75 0.13
37.89 (m3) 0.60 0.44

14.13 (GF - HB6


0.13
0.60 1.06

5.85 (GF - HB7


0.13
0.60 0.44

3/ 4.88 (GF - HB8


0.13
0.60 1.10

5.53 (GF - HB9


0.13
0.60 0.41

4.55 (GF - HB9a


0.13
0.45 0.26

2/ 6.72 (GF - HB8


0.13
0.60 1.01
7.57 (m3) C/F
Taking-Off Paper
Page : 2
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) Excavate trench for ground beam not
Excavation (Cont'd) exceeding 1.50 deep commencing from
formation level, get out, deposit, spread and
Excavate trench for ground beam not level where directed within site, backfilling
exceeding 1.50 deep commencing from and remainder dispose off site to Contractor's
formation level, get out, deposit, spread and own dump.
level where directed within site, backfilling
and remainder dispose off site to Contractor's 12.96 B/F
own dump.
5.88 (GF - VB5e
7.57 B/F 0.13
0.60 0.44
6.43 (GF - VB1
0.13 6.48 (GF - VB5f
0.60 0.48 0.13
0.60 0.49
14.66 (GF - VB2
0.13 3.28 (GF - VB5g
0.60 1.10 0.13
0.60 0.25
2/ 3.70 (GF - VB2A
0.13 4.93 (GF - VB6
0.60 0.56 0.13
0.60 0.37
3.87 (GF - VB3a
0.13 3/ 1.98 (GF - VB7
0.60 0.29 0.13
0.45 0.11
3.70 (GF - VB3b 14.62 (m3)
0.13
0.60 0.28

3.28 (GF - VB3c


0.13
0.60 0.25

3.13 (GF - VB3d


0.13
0.60 0.23

2.88 (GF - VB3e


0.13
0.60 0.22

18.99 (GF - VB4


0.13
0.60 1.42

2.05 (GF - VB5a


0.13
0.45 0.12

2.17 (GF - VB5b


0.13
0.60 0.16

1.38 (GF - VB5c


0.13
0.45 0.08

2.90 (GF - VB5d


0.13
0.60 0.22
12.96 (m3) C/F
Taking-Off Paper
Page : 3
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd)


Excavation (Cont'd) Miniumum 50mm thick sand blinding;
to under ground slab.

Excavate for ground slab not exceeding 1.48 (Gridline 1-2/A-B


125mm high commencing from formation 3.20 4.72
level, get out, deposit, spread and level where
directed within site, backfilling and remainder 9.59 (Gridline 2-4/A-B
dispose off site to Contractor's own dump. 4.00 38.35

1.35 (Gridline 1-2/A-B 2.50 (Gridline 4-5/A-B


3.08 3.53 8.81
0.13 0.52
11.13 (Gridline 1-4/B-C
9.09 (Gridline 2-4/A-B 6.00 66.75
3.88
0.13 4.40 15.13 (Gridline 1-6/E-C
6.00 90.75
2.38 (Gridline 4-5/A-B
3.28 11.66 (Gridline 1-4/E-F
0.13 0.97 3.00 34.99

10.75 (Gridline 1-4/B-C 11.13 (Gridline 1-4/F-H


5.88 7.21 80.24
0.13 7.89
7.60 (External
14.63 (Gridline 1-6/E-C 2.23 16.91
5.88 341.52 (m2)
0.13 10.74

11.16 (Gridline 1-4/E-F


2.88
0.13 4.01

10.75 (Gridline 1-4/F-H


7.03
0.13 9.44

7.23 (External
1.98
0.13 1.78
39.76 (m3)
Taking-Off Paper
Page : 4
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) 0.25mm Thick non degradable
Excavation (Cont'd) "Visqueen PIFA 250" or approved equivalent
polythene sheet (heavy duty) damp proof
membrane; with overlapping at minimum
150mm thick plain well compacted crusher 300mm to manufacturer's specification
run as described spread, levelled, blinded and (measured nett and no allowance made for
well consolidated in ground slab. laps)

1.48 (Gridline 1-2/A-B 1.48 (Gridline 1-2/A-B


3.20 4.72 3.20 4.72

9.59 (Gridline 2-4/A-B 9.59 (Gridline 2-4/A-B


4.00 38.35 4.00 38.35

2.50 (Gridline 4-5/A-B 2.50 (Gridline 4-5/A-B


3.53 8.81 3.53 8.81

11.13 (Gridline 1-4/B-C 11.13 (Gridline 1-4/B-C


6.00 66.75 6.00 66.75

15.13 (Gridline 1-6/E-C 15.13 (Gridline 1-6/E-C


6.00 90.75 6.00 90.75

11.66 (Gridline 1-4/E-F 11.66 (Gridline 1-4/E-F


3.00 34.99 3.00 34.99

11.13 (Gridline 1-4/F-H 11.13 (Gridline 1-4/F-H


7.21 80.24 7.21 80.24

7.60 (External 7.60 (External


2.23 16.91 2.23 16.91
341.52 (m2) 341.52 (m2)
Taking-Off Paper
Page : 5
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level 50mm thick plain concrete (1:3:6- 40mm
Concrete Work aggregates) as described blinding bed,
spread and levelled to receive ground slab.
50mm thick plain concrete (1:3:6- 40mm
aggregates) as described blinding bed, 1.48 (Gridline 1-2/A-B
spread and levelled to receive pile cap. 3.20 4.72

11/ 1.00 (F1 9.59 (Gridline 2-4/A-B


1.00 11.00 4.00 38.35

8/ 1.30 (F2 2.50 (Gridline 4-5/A-B


1.30 13.52 3.53 8.81

5/ 1.55 (F3 11.13 (Gridline 1-4/B-C


1.55 12.01 6.00 66.75

5/ 1.90 (F4 15.13 (Gridline 1-6/E-C


1.90 18.05 6.00 90.75

5/ 2.30 (F5 11.66 (Gridline 1-4/E-F


2.30 26.45 3.00 34.99

3/ 2.50 (F6 11.13 (Gridline 1-4/F-H


2.50 18.75 7.21 80.24

3/ 2.85 (F7 7.60 (External


2.85 24.37 2.23 16.91
124.15 (m2) 341.52 (m2)
Taking-Off Paper
Page : 6
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) Vibrated reinforced concrete Grade 30
Concrete Work (Cont'd) as described in column stumps.

Vibrated reinforced concrete Grade 30 0.13 (C1


as described in pile caps. 0.75
0.80 0.08
11/ 1.00 (F1
1.00 0.60 (C2
0.25 2.75 0.13
0.95 0.07
8/ 1.30 (F2
1.30 0.60 (C3
0.25 3.38 0.13
0.90 0.07
5/ 1.55 (F3
1.55 0.30 (C4
0.25 3.00 0.13
0.95 0.04
5/ 1.90 (F4
1.90 0.13 (C5
0.25 4.51 0.60
0.95 0.07
5/ 2.30 (F5
2.30 0.13 (C6
0.30 7.93 0.63
0.85 0.07
3/ 2.50 (F6
2.50 0.13 (C7
0.35 6.56 0.60
0.80 0.06
3/ 2.85 (F7
2.85 0.13 (C8
0.40 9.75 0.60
37.89 (m3) 0.85 0.06

0.60 (C9
0.13
0.80 0.06

0.60 (C10
0.13
0.90 0.07

0.30 (C11
0.13
0.95 0.04

0.30 (C12
0.13
0.95 0.04

0.13 (C13
0.30
0.95 0.04

0.13 (C14
0.60
0.95 0.07

0.13 (C15
0.60
0.95 0.07
0.89 (m3) C/F
Taking-Off Paper
Page : 7
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) Vibrated reinforced concrete Grade 30
Concrete Work (Cont'd) as described in column stumps.

1.57 B/F
Vibrated reinforced concrete Grade 30
as described in column stumps. 0.13 (C37
0.60
0.89 B/F 0.85 0.06

0.13 (C16 0.13 (C38


0.60 0.60
0.95 0.07 0.90 0.07

0.73 (C17 0.13 (C39


0.18 0.30
0.95 0.12 0.95 0.04

0.60 (C18 0.13 (C40


0.13 0.30
0.95 0.07 0.95 0.04
1.77 (m3)
0.30 (C19
0.13
0.95 0.04

0.30 (C26
0.13
0.95 0.04

0.30 (C27
0.13
0.95 0.04

0.30 (C28
0.13
0.95 0.04

0.30 (C29
0.13
0.95 0.04

0.30 (C30
0.13
0.95 0.04

0.30 (C31
0.13
0.95 0.04

0.60 (C34
0.13
0.90 0.07

0.60 (C35
0.13
0.90 0.07

0.30 (C36
0.13
0.95 0.04
1.57 (m3) C/F
Taking-Off Paper
Page : 8
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) Vibrated reinforced concrete Grade 30
Concrete Work (Cont'd) as described in ground beams.

7.57 B/F
Vibrated reinforced concrete Grade 30
as described in ground beams. 6.43 (GF - VB1
0.13
7.90 (GF - HB1a 0.60 0.48
0.13
0.60 0.59 14.66 (GF - VB2
0.13
1.38 (GF - HB1b 0.60 1.10
0.13
0.45 0.08 2/ 3.70 (GF - VB2A
0.13
2.33 (GF - HB1c 0.60 0.56
0.13
0.60 0.17 3.87 (GF - VB3a
0.13
1.35 (GF - HB1A 0.60 0.29
0.13
0.60 0.10 3.70 (GF - VB3b
0.13
2.03 (GF - HB2 0.60 0.28
0.13
0.60 0.15 3.28 (GF - VB3c
0.13
9.67 (GF - HB3 0.60 0.25
0.13
0.60 0.73 3.13 (GF - VB3d
0.13
13.68 (GF - HB4 0.60 0.23
0.13
0.60 1.03 2.88 (GF - VB3e
0.13
5.88 (GF - HB5 0.60 0.22
0.13
0.60 0.44 18.99 (GF - VB4
0.13
14.13 (GF - HB6 0.60 1.42
0.13
0.60 1.06 2.05 (GF - VB5a
0.13
5.85 (GF - HB7 0.45 0.12
0.13
0.60 0.44 2.17 (GF - VB5b
0.13
3/ 4.88 (GF - HB8 0.60 0.16
0.13
0.60 1.10 1.38 (GF - VB5c
0.13
5.53 (GF - HB9 0.45 0.08
0.13
0.60 0.41 2.90 (GF - VB5d
0.13
4.55 (GF - HB9a 0.60 0.22
0.13 12.96 (m3) C/F
0.45 0.26

2/ 6.72 (GF - HB10


0.13
0.60 1.01
7.57 (m3) C/F
Taking-Off Paper
Page : 9
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) Vibrated reinforced concrete Grade 30
Concrete Work (Cont'd) as described in ground slab.

1.48 (Gridline 1-2/A-B


Vibrated reinforced concrete Grade 30 3.20 4.72
as described in ground beams.
9.59 (Gridline 2-4/A-B
12.96 B/F 4.00 38.35

5.88 (GF - VB5e 2.50 (Gridline 4-5/A-B


0.13 3.53 8.81
0.60 0.44
11.13 (Gridline 1-4/B-C
6.48 (GF - VB5f 6.00 66.75
0.13
0.60 0.49 15.13 (Gridline 1-6/E-C
6.00 90.75
3.28 (GF - VB5g
0.13 11.66 (Gridline 1-4/E-F
0.60 0.25 3.00 34.99

4.93 (GF - VB6 11.13 (Gridline 1-4/F-H


0.13 7.21 80.24
0.60 0.37
7.60 (External
3/ 1.98 (GF - VB7 2.23 16.91
0.13 341.52 (m2)
0.45 0.11
14.62 (m3)
Taking-Off Paper
Page : 10
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) Sawn formwork as decribed to sides of
Concrete Work (Cont'd) column stumps.

Sawn formwork as decribed to sides of pile 13.21 B/F


caps.
0.85 (C12
11/4/ 1.00 (F1 0.95 0.81
0.25 11.00
0.85 (C13
8/4/ 1.30 (F2 0.95 0.81
0.25 10.40
1.45 (C14
5/4/ 1.55 (F3 0.95 1.38
0.25 7.75
1.45 (C15
5/4/ 1.90 (F4 0.95 1.38
0.25 9.50
1.45 (C16
5/4/ 2.30 (F5 0.95 1.38
0.30 13.80
1.80 (C17
3/4/ 2.50 (F6 0.95 1.71
0.35 10.50
1.45 (C18
3/4/ 2.85 (F7 0.95 1.38
0.40 13.68
76.63 (m2) 0.85 (C19
0.95 0.81
Sawn formwork as decribed to sides of
column stumps. 0.85 (C26
0.95 0.81
1.75 (C1
0.80 1.40 0.85 (C27
0.95 0.81
1.45 (C2
0.95 1.38 0.85 (C28
0.95 0.81
1.45 (C3
0.90 1.31 0.85 (C29
0.95 0.81
0.85 (C4
0.95 0.81 0.85 (C30
0.95 0.81
1.45 (C5
0.95 1.38 0.85 (C31
0.95 0.81
1.50 (C6
0.85 1.28 1.45 (C34
0.90 1.31
1.45 (C7
0.80 1.16 1.45 (C35
0.90 1.31
1.45 (C8
0.85 1.23 0.85 (C36
0.95 0.81
1.45 (C9
0.80 1.16 1.45 (C37
0.85 1.23
1.45 (C10
0.90 1.31 1.45 (C38
0.90 1.31
0.85 (C11 33.65 (m2) C/F
0.95 0.81
13.21 (m2) C/F
Taking-Off Paper
Page : 11
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) Sawn formwork as decribed to sides of
Concrete Work (Cont'd) ground beam.

Sawn formwork as decribed to sides of 121.05 B/F


column stumps.
2/ 6.43 (GF - VB1
33.65 B/F 0.60 7.72

0.85 (C39 2/ 14.66 (GF - VB2


0.95 0.81 0.60 17.59

0.85 (C40 2/ 3.70 (GF - VB2A


0.95 0.81 0.60 4.44
35.27 (m2)
2/ 3.87 (GF - VB3a
Sawn formwork as decribed to sides of 0.60 4.64
ground beam.
2/ 3.70 (GF - VB3b
2/ 7.90 (GF - HB1a 0.60 4.44
0.60 9.48
2/ 3.28 (GF - VB3c
2/ 1.38 (GF - HB1b 0.60 3.94
0.45 1.24
2/ 3.13 (GF - VB3d
2/ 2.33 (GF - HB1c 0.60 3.76
0.60 2.80
2/ 2.88 (GF - VB3e
2/ 1.35 (GF - HB1A 0.60 3.46
0.60 1.62
2/ 18.99 (GF - VB4
2/ 2.03 (GF - HB2 0.60 22.79
0.60 2.44
2/ 2.05 (GF - VB5a
2/ 9.67 (GF - HB3 0.45 1.85
0.60 11.60
2/ 2.17 (GF - VB5b
2/ 13.68 (GF - HB4 0.60 2.60
0.60 16.42
2/ 1.38 (GF - VB5c
2/ 5.88 (GF - HB5 0.45 1.24
0.60 7.06
2/ 2.90 (GF - VB5d
2/ 14.13 (GF - HB6 0.60 3.48
0.60 16.96
2/ 5.88 (GF - VB5e
2/ 5.85 (GF - HB7 0.60 7.06
0.60 7.02
2/ 6.48 (GF - VB5f
3/2/ 4.88 (GF - HB8 0.60 7.78
0.60 17.57
2/ 3.28 (GF - VB5g
5.53 (GF - HB9 0.60 3.94
0.60 6.64
2/ 4.93 (GF - VB6
4.55 (GF - HB9a 0.60 5.92
0.45 4.10
3/2/ 1.98 (GF - VB7
2/2/ 6.72 (GF - HB10 0.45 1.78
0.60 16.13 229.46 (m2)
121.05 (m2) C/F
Taking-Off Paper
Page : 12
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd)


Concrete Work (Cont'd)

Sawn formwork as described to edge of


ground slab 125mm high.

109.00 109.00 (m)


REINFORCEMENT SCHEDULE

Index No: 20WVR12838 Page : 1

Project: 1 Unit Double Storey Banglow Location : Pile Cap

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 T6 R8

F1 T12-125 11.00 T12 9 1.35 - - 133.65 - - - - - -


T12-125 11.00 T12 9 1.35 - - 133.65 - - - - - -
T6-100 11.00 T6 3.94 0.25 0.10 4.00 - - - - - - 173.54 -

F2 T12-125 8.00 T12 11 1.65 - - 145.20 - - - - - -


T12-125 8.00 T12 11 1.65 - - 145.20 - - - - - -
T6-100 8.00 T6 5.14 0.25 0.10 4.00 - - - - - - 164.61 -

F3 T12-125 5.00 T12 13 1.90 - - 123.50 - - - - - -


T12-125 5.00 T12 13 1.90 - - 123.50 - - - - - -
T6-100 5.00 T6 6.14 0.25 0.10 4.00 - - - - - - 122.88 -

F4 T12-125 5.00 T12 16 2.25 - - 180.00 - - - - - -


T12-125 5.00 T12 16 2.25 - - 180.00 - - - - - -
T6-100 5.00 T6 7.54 0.25 0.10 4.00 - - - - - - 150.88 -

F5 T12-100 5.00 T12 24 2.75 - - 330.00 - - - - - -


T12-100 5.00 T12 24 2.75 - - 330.00 - - - - - -
T6-100 5.00 T6 9.14 0.30 0.10 4.00 - - - - - - 182.88 -

F6 T12-100 3.00 T12 26 3.05 - - 237.90 - - - - - -


T12-100 3.00 T12 26 3.05 - - 237.90 - - - - - -
T6-100 3.00 T6 9.94 0.35 0.10 4.00 - - - - - - 119.33 -

F7 T16-150 3.00 T16 20 3.50 - - - 210.00 - - - - -


T16-150 3.00 T16 20 3.50 - - - 210.00 - - - - -
T6-100 3.00 T6 11.34 0.40 0.10 5.00 - - - - - - 170.16 -

SUBTOTAL: 0.00 2300.50 420.00 0.00 0.00 0.00 1084.27 0.00


KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.222 0.395
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 2042.84 663.18 0.00 0.00 0.00 240.71 0.00
REINFORCEMENT SCHEDULE
Index No: 20WVR12838 Page : 1

Project: 1 Unit Double Storey Banglow Location : COLUMN STUMP

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 R8 R10

C1 8T12 1.00 T12 8 2.41 - - 19.26 - - - - - -


R10-100 1.00 R10 1.79 1.83 0.10 19.00 - - - - - - - 34.01

C2 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C3 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C4 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C5 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C6 8T12 1.00 T12 8 2.41 - - 19.26 - - - - - -


R10-125 1.00 R10 1.54 1.83 0.13 16.00 - - - - - - - 24.64

C7 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C8 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C9 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C10 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C11 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C12 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C13 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24
SUBTOTAL: 0.00 178.12 0.00 0.00 0.00 0.00 0.00 282.49
KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.395 0.616
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 158.17 0.00 0.00 0.00 0.00 0.00 174.01
REINFORCEMENT SCHEDULE
Index No: 20WVR12838 Page : 2

Project: 1 Unit Double Storey Banglow Location : COLUMN STUMP

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 R8 R10

C14 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C15 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C16 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C17 12T12 1.00 T12 12 2.41 - - 28.88 - - - - - -


R10-125 1.00 R10 1.29 1.83 0.13 16.00 - - - - - - - 20.64
R10-125 1.00 R10 1.29 1.83 0.13 16.00 - - - - - - - 20.64

C18 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C19 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C26 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C27 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C28 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C29 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C30 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C31 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

SUBTOTAL: 0.00 154.05 0.00 0.00 0.00 0.00 0.00 236.32


KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.395 0.616
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 136.79 0.00 0.00 0.00 0.00 0.00 145.57
REINFORCEMENT SCHEDULE
Index No: 20WVR12838 Page : 3

Project: 1 Unit Double Storey Banglow Location : COLUMN STUMP

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 R8 R10

C34 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C35 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C36 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C37 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C38 6T12 1.00 T12 6 2.41 - - 14.44 - - - - - -


R10-125 1.00 R10 1.49 1.83 0.13 16.00 - - - - - - - 23.84

C39 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

C40 4T12 1.00 T12 4 2.41 - - 9.63 - - - - - -


R10-125 1.00 R10 0.89 1.83 0.13 16.00 - - - - - - - 14.24

SUBTOTAL: 0.00 86.65 0.00 0.00 0.00 0.00 0.00 138.08


KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.395 0.616
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 76.95 0.00 0.00 0.00 0.00 0.00 85.06
REINFORCEMENT SCHEDULE
Index No: 20WVR12838 Page : 1

Project: 1 Unit Double Storey Banglow Location : GROUND BEAM

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 R8 R10

Horizontal
HB1 2T12 1.00 T12 2 8.58 - - 17.16 - - - - - -
2T12 1.00 T12 2 2.31 - - 4.62 - - - - - -
2T12 1.00 T12 2 3.05 - - 6.10 - - - - - -
2T12 1.00 T12 2 8.89 - - 17.78 - - - - - -
2T12 1.00 T12 2 8.87 - - 17.74 - - - - - -
2T12 1.00 T12 2 8.84 - - 17.68 - - - - - -
2T12 1.00 T12 2 6.02 - - 12.04 - - - - - -
2T12 1.00 T12 2 6.02 - - 12.04 - - - - - -
R10-250 1.00 R10 1.49 1.30 0.25 6.00 - - - - - - - 8.94
R10-125 1.00 R10 1.49 4.37 0.13 36.00 - - - - - - - 53.64
R10-250 1.00 R10 1.49 1.83 0.25 8.00 - - - - - - - 11.92
R10-250 1.00 R10 1.49 1.21 0.25 6.00 - - - - - - - 8.94
R10-250 1.00 R10 1.49 2.04 0.25 9.00 - - - - - - - 13.41

HB1A 2T12 1.00 T12 2 2.03 - - 4.06 - - - - - -


2T12 1.00 T12 2 1.99 - - 3.98 - - - - - -
R10-250 1.00 R10 1.49 1.25 0.25 6.00 - - - - - - - 8.94

HB2 2T12 1.00 T12 2 3.05 - - 6.10 - - - - - -


2T12 1.00 T12 2 3.02 - - 6.04 - - - - - -
R10-250 1.00 R10 1.49 1.92 0.25 9.00 - - - - - - - 13.41

HB3 2T12 1.00 T12 2 2.31 - - 4.62 - - - - - -


2T12 1.00 T12 2 2.29 - - 4.58 - - - - - -
2T12 1.00 T12 2 11.39 - - 22.78 - - - - - -
2T12 1.00 T12 2 6.81 - - 13.62 - - - - - -
2T12 1.00 T12 2 9.27 - - 18.54 - - - - - -
2T12 1.00 T12 2 6.22 - - 12.44 - - - - - -
2T12 1.00 T12 2 4.36 - - 8.72 - - - - - -
2T12 1.00 T12 2 2.85 - - 5.70 - - - - - -
R10-250 1.00 R10 1.49 0.71 0.25 4.00 - - - - - - - 5.96
R10-250 1.00 R10 1.49 1.17 0.25 6.00 - - - - - - - 8.94
R10-250 1.00 R10 1.49 2.71 0.25 12.00 - - - - - - - 17.88
R10-250 1.00 R10 1.49 2.80 0.25 12.00 - - - - - - - 17.88
R10-250 1.00 R10 1.49 1.35 0.25 6.00 - - - - - - - 8.94

SUBTOTAL: 0.00 216.34 0.00 0.00 0.00 0.00 0.00 178.80


KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.395 0.616
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 192.11 0.00 0.00 0.00 0.00 0.00 110.14
REINFORCEMENT SCHEDULE
Index No: 20WVR12838 Page : 2

Project: 1 Unit Double Storey Banglow Location : GROUND BEAM

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 R8 R10

HB4 2T12 1.00 T12 2 7.84 - - 15.68 - - - - - -


2T12 1.00 T12 2 8.51 - - 17.02 - - - - - -
2T12 1.00 T12 2 6.87 - - 13.74 - - - - - -
2T12 1.00 T12 2 4.36 - - 8.72 - - - - - -
2T12 1.00 T12 2 9.24 - - 18.48 - - - - - -
R10-250 1.00 R10 1.49 5.30 0.25 22.00 - - - - - - - 32.78
R10-250 1.00 R10 1.49 4.77 0.25 20.00 - - - - - - - 29.80
R10-250 1.00 R10 1.49 3.30 0.25 14.00 - - - - - - - 20.86

HB5 2T12 1.00 T12 2 6.55 - - 13.10 - - - - - -


2T12 1.00 T12 2 6.52 - - 13.04 - - - - - -
2T12 1.00 T12 2 5.10 - - 10.20 - - - - - -
R10-250 1.00 R10 1.49 5.77 0.25 24.00 - - - - - - - 35.76

HB6 2T12 1.00 T12 2 8.41 - - 16.82 - - - - - -


2T12 1.00 T12 2 8.51 - - 17.02 - - - - - -
2T12 1.00 T12 2 6.87 - - 13.74 - - - - - -
2T12 1.00 T12 2 4.36 - - 8.72 - - - - - -
2T12 1.00 T12 2 9.24 - - 18.48 - - - - - -
R10-250 1.00 R10 1.49 0.42 0.25 3.00 - - - - - - - 4.47
R10-250 1.00 R10 1.49 2.24 0.25 10.00 - - - - - - - 14.90
R10-250 1.00 R10 1.49 2.71 0.25 12.00 - - - - - - - 17.88
R10-250 1.00 R10 1.49 4.77 0.25 20.00 - - - - - - - 29.80
R10-250 1.00 R10 1.49 3.30 0.25 14.00 - - - - - - - 20.86

HB7 2T12 1.00 T12 2 2.86 - - 5.72 - - - - - -


2T12 1.00 T12 2 7.13 - - 14.26 - - - - - -
2T12 1.00 T12 2 7.09 - - 14.18 - - - - - -
2T12 1.00 T12 2 4.36 - - 8.72 - - - - - -
R10-250 1.00 R10 1.49 0.42 0.25 3.00 - - - - - - - 4.47
R10-250 1.00 R10 1.49 2.24 0.25 10.00 - - - - - - - 14.90
R10-250 1.00 R10 1.49 2.71 0.25 12.00 - - - - - - - 17.88

HB8 2T12 3.00 T12 2 5.55 - - 33.30 - - - - - -


2T12 3.00 T12 2 5.52 - - 33.12 - - - - - -
2T12 3.00 T12 2 4.02 - - 24.12 - - - - - -
R10-250 3.00 R10 1.49 4.77 0.25 20.00 - - - - - - - 89.40

SUBTOTAL: 0.00 318.18 0.00 0.00 0.00 0.00 0.00 333.76


KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.395 0.616
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 282.54 0.00 0.00 0.00 0.00 0.00 205.60
REINFORCEMENT SCHEDULE
Index No: 20WVR12838 Page : 3

Project: 1 Unit Double Storey Banglow Location : GROUND BEAM

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 R8 R10

HB9 2T12 1.00 T12 2 6.55 - - 13.10 - - - - - -


2T12 1.00 T12 2 5.73 - - 11.46 - - - - - -
2T12 1.00 T12 2 6.87 - - 13.74 - - - - - -
2T12 1.00 T12 2 4.42 - - 8.84 - - - - - -
2T12 1.00 T12 2 5.25 - - 10.50 - - - - - -
R10-250 1.00 R10 1.49 5.42 0.25 23.00 - - - - - - - 34.27
R10-250 1.00 R10 1.19 4.45 0.25 19.00 - - - - - - - 22.61

HB10 2T12 2.00 T12 2 8.05 - - 32.20 - - - - - -


2T12 2.00 T12 2 8.01 - - 32.04 - - - - - -
R10-250 2.00 R10 1.49 3.42 0.25 15.00 - - - - - - - 44.70
R10-250 2.00 R10 1.49 3.10 0.25 13.00 - - - - - - - 38.74

Vertical
VB1 2T12 1.00 T12 2 7.70 - - 15.40 - - - - - -
2T12 1.00 T12 2 7.67 - - 15.34 - - - - - -
R10-250 1.00 R10 1.49 0.42 0.25 3.00 - - - - - - - 4.47
R10-250 1.00 R10 1.49 2.24 0.25 10.00 - - - - - - - 14.90

VB2 2T12 1.00 T12 2 7.89 - - 15.78 - - - - - -


2T12 1.00 T12 2 3.22 - - 6.44 - - - - - -
2T12 1.00 T12 2 3.22 - - 6.44 - - - - - -
2T12 1.00 T12 2 8.66 - - 17.32 - - - - - -
2T12 1.00 T12 2 6.22 - - 12.44 - - - - - -
2T12 1.00 T12 2 4.50 - - 9.00 - - - - - -
2T12 1.00 T12 2 6.42 - - 12.84 - - - - - -
2T12 1.00 T12 2 10.07 - - 20.14 - - - - - -
R10-250 1.00 R10 1.49 2.21 0.25 10.00 - - - - - - - 14.90
R10-250 1.00 R10 1.49 3.21 0.25 14.00 - - - - - - - 20.86
R10-250 1.00 R10 1.49 5.77 0.25 24.00 - - - - - - - 35.76
R10-250 1.00 R10 1.49 2.80 0.25 12.00 - - - - - - - 17.88

VB2A 2T12 2.00 T12 2 4.55 - - 18.20 - - - - - -


2T12 2.00 T12 2 4.52 - - 18.08 - - - - - -
R10-250 2.00 R10 1.49 2.91 0.25 13.00 - - - - - - - 38.74
R10-250 2.00 R10 1.49 0.34 0.25 2.00 - - - - - - - 5.96

SUBTOTAL: 0.00 289.30 0.00 0.00 0.00 0.00 0.00 293.79


KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.395 0.616
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 256.90 0.00 0.00 0.00 0.00 0.00 180.97
REINFORCEMENT SCHEDULE
Index No: 20WVR12838 Page : 4

Project: 1 Unit Double Storey Banglow Location : GROUND BEAM

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 R8 R10
VB3 2T12 5.00 T12 2 4.55 - - 45.50 - - - - - -
2T12 5.00 T12 2 4.52 - - 45.20 - - - - - -
R10-250 5.00 R10 1.49 3.77 0.25 16.00 - - - - - - - 119.20

VB4 2T12 1.00 T12 2 9.71 - - 19.42 - - - - - -


2T12 1.00 T12 2 9.17 - - 18.34 - - - - - -
2T12 1.00 T12 2 9.17 - - 18.34 - - - - - -
2T12 1.00 T12 2 5.41 - - 10.82 - - - - - -
2T12 1.00 T12 2 8.02 - - 16.04 - - - - - -
2T12 1.00 T12 2 8.35 - - 16.70 - - - - - -
2T12 1.00 T12 2 4.87 - - 9.74 - - - - - -
2T12 1.00 T12 2 7.49 - - 14.98 - - - - - -
R10-250 1.00 R10 1.49 2.27 0.25 10.00 - - - - - - - 14.90
R10-250 1.00 R10 1.49 1.89 0.25 9.00 - - - - - - - 13.41
R10-250 1.00 R10 1.49 1.21 0.25 6.00 - - - - - - - 8.94
R10-250 1.00 R10 1.49 2.77 0.25 12.00 - - - - - - - 17.88
R10-250 1.00 R10 1.49 1.74 0.25 8.00 - - - - - - - 11.92
R10-250 1.00 R10 1.49 2.59 0.25 11.00 - - - - - - - 16.39
R10-250 1.00 R10 1.49 5.30 0.25 22.00 - - - - - - - 32.78

VB5 2T12 1.00 T12 2 3.53 - - 7.06 - - - - - -


2T12 1.00 T12 2 3.20 - - 6.40 - - - - - -
2T12 1.00 T12 2 2.79 - - 5.58 - - - - - -
2T12 1.00 T12 2 8.81 - - 17.62 - - - - - -
2T12 1.00 T12 2 12.55 - - 25.10 - - - - - -
2T12 1.00 T12 2 12.57 - - 25.14 - - - - - -
2T12 1.00 T12 2 6.90 - - 13.80 - - - - - -
2T12 1.00 T12 2 3.65 - - 7.30 - - - - - -
2T12 1.00 T12 2 2.95 - - 5.90 - - - - - -
2T12 1.00 T12 2 11.26 - - 22.52 - - - - - -
2T12 1.00 T12 2 10.24 - - 20.48 - - - - - -
R10-250 1.00 R10 1.19 1.95 0.25 9.00 - - - - - - - 10.71
R10-250 1.00 R10 1.49 1.89 0.25 9.00 - - - - - - - 13.41
R10-250 1.00 R10 1.49 1.21 0.25 6.00 - - - - - - - 8.94
R10-250 1.00 R10 1.49 2.80 0.25 12.00 - - - - - - - 17.88
R10-250 1.00 R10 1.49 5.77 0.25 24.00 - - - - - - - 35.76
R10-250 1.00 R10 1.49 5.71 0.25 24.00 - - - - - - - 35.76
R10-250 1.00 R10 1.49 0.31 0.25 2.00 - - - - - - - 2.98
R10-250 1.00 R10 1.49 3.25 0.25 14.00 - - - - - - - 20.86
SUBTOTAL: 0.00 371.98 0.00 0.00 0.00 0.00 0.00 381.72
KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.395 0.616
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 330.32 0.00 0.00 0.00 0.00 0.00 235.14
REINFORCEMENT SCHEDULE
Index No: 20WVR12838 Page : 5

Project: 1 Unit Double Storey Banglow Location : GROUND BEAM

Desc DETAIL No TYPE MAIN BARS LINKS MAIN BAR LINKS


QTY LENGTH LENGTH L SPACING QTY T10 T12 T16 T20 T25 T32 R8 R10

VB6 2T12 1.00 T12 2 6.55 - - 13.10 - - - - - -


2T12 1.00 T12 2 6.52 - - 13.04 - - - - - -
2T12 1.00 T12 2 4.72 - - 9.44 - - - - - -
R10-250 1.00 R10 1.49 4.82 0.25 20.00 - - - - - - - 29.80

VB7 2T12 3.00 T12 2 2.65 - - 15.90 - - - - - -


2T12 3.00 T12 2 2.62 - - 15.72 - - - - - -
R10-250 3.00 R10 1.49 1.87 0.25 8.00 - - - - - - - 35.76

SUBTOTAL: 0.00 67.20 0.00 0.00 0.00 0.00 0.00 65.56


KG/M: 0.616 0.888 1.579 2.466 3.850 6.308 0.395 0.616
FACTOR 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
TOTAL: 0.00 59.67 0.00 0.00 0.00 0.00 0.00 40.38
Taking-Off Paper
Page : 13
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd) BRC - Ref. A7 steel fabric reinforcement
Concrete Work (Cont'd) in suspended slab, cut to sizes, well lapped at
joints and intersections (measured nett -
16mm High tensile steel bar reinforcement as no allowance made for laps).
described in pile caps.
1.48 (Gridline 1-2/A-B
663.18 663.18 (kg) 3.20 4.72

12mm High tensile steel bar reinforcement as (Gridline 2-4/A-B


9.59
described in pile caps. 4.00 38.35

2042.84 2042.84 (kg) 2.50 (Gridline 4-5/A-B


3.53 8.81
12mm High tensile steel bar reinforcement as
described in column stumps. 11.13 (Gridline 1-4/B-C
6.00 66.75
371.91 371.91 (kg)
15.13 (Gridline 1-6/E-C
12mm High tensile steel bar reinforcement as
6.00 90.75
described in ground beam.
11.66 (Gridline 1-4/E-F
1121.54 1121.54 (kg) 3.00 34.99

6mm High tensile steel bar reinforcement 11.13 (Gridline 1-4/F-H


as link in pile caps. 7.21 80.24

247.33 247.33 (kg) 7.60 (External


2.23 16.91
10mm Mild steel bar reinforcement 341.52 (m2)
as link in column stumps.

404.64 404.64 (kg)

10mm Mild steel bar reinforcement


as link in ground beam.

772.23 772.23 (kg)


Taking-Off Paper
Page : 14
Index No : 20WVR12838 Job No :
Project : 1 Unit Double Storey Banglow Drawing Ref : 2240/GF/KP/1

Work Below Lowest Floor Level (Cont'd)


Anti-Termite Treatment

Prepare and applying subterranean


anti-termite treatment; to comply to the
specialist's requirement; to all soil in contact
with the substructure