Lean manufacturing

LAB- assignment-1

pandiyarajan N

2022HB79036
Tutorial START SCREEN SHORT

MIDDLE SCREEN SHOT

RESULT
OBSERVATION/CONCLUSION

BY USING THIS RATE OF PRODUCTION CAN BE ESTIMATED.


A packaging shop floor consists of three machines and produces three
types of products. There is a dedicated machine to each type of part.
The machine processing time is 10 minutes and parts arrives into the
shop floor based on an exponential distribution exponential (0,10,0)
minutes. Currently an operator is involved in transferring the product
from the initial inventory area to the three machines. The shop floor
manager wants to find the throughput with the time duration of 4320
minutes to understand the rate of production.