Professional Documents
Culture Documents
Secondary Substation Earthing Design Example
Secondary Substation Earthing Design Example
Version: 5.0
Date: 20/03/2023
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE
Earthing Design Report – Newtown 11kV Substation
Contents
1 Introduction ............................................................................................................. 1
2 Data .......................................................................................................................... 1
3 Soil Resistivity ......................................................................................................... 2
4 Ground Return Current ........................................................................................... 2
5 Earth Potential Rise (EPR) and HV Earth Resistance ........................................... 2
6 Earthing Arrangement ............................................................................................. 3
7 Network Contribution .............................................................................................. 3
8 EPR ........................................................................................................................... 3
9 Safety Voltages........................................................................................................ 3
10 Transfer Voltage ...................................................................................................... 4
11 Surface Current Density.......................................................................................... 4
12 LV Earth ................................................................................................................... 5
13 Site Classification.................................................................................................... 5
14 Earthing Installation ................................................................................................ 5
15 References ............................................................................................................... 5
Appendix A – Drawings ...................................................................................................... 6
1 Introduction
The project is to install a new 11kV substation to supply a new housing estate on the outskirts
of Newtown. The proposed substation is a standard GRP and uses the earthing arrangement
detailed in drawing EDS 07-3102-01 (Appendix A). The new substation will become the first
substation on circuit 07 of New Town Primary substation.
2 Data
The following data has been provided by UK Power Networks for the point of connection.
3 Soil Resistivity
The soil resistivity for the proposed location is estimated at 100Ωm from the earthing resistivity
maps.
𝐶𝐶
(𝑎𝑎 + 9𝐸𝐸)
𝐼𝐼gr =
��� 𝐶𝐶 𝑅𝑅 2 𝜌𝜌 0.1
+ AB � + 0.6 � � �
𝑎𝑎 + 9𝐸𝐸 l 𝑎𝑎𝑎𝑎
Circuit Type 1
Cable Type 3c 185mm2 XLPE
C Factor C 92
Cable Size a 185mm2
Cable Length l 1.4km
Voltage E 11kV
Source Earth Resistance RA 0.1Ω
End Earth Resistance RB 0.26Ω
Resistivity ρ 100Ω.m
Ground Return Current Igr 37%
6 Earthing Arrangement
The substation uses the earthing arrangement detailed in EDS 07-3102-01.
This arrangement will have a resistance of 10Ω in 100Ωm soil (source: EDS 06-0012 v5 Table
A-2).
To supplement the substation earth 100m of bare conductor should be installed underneath
the HV cables which will provide a resistance of 3Ω in 100Ωm soil.
7 Network Contribution
The substation is being installed in an urban area with a significant HV and LV cable
distribution network. A conservative estimate of the combined contribution of the existing
interconnected network substations and PILC cable is 0.25Ω (Urban PILC cable network with
200m radius from EDS 06-0012 Table G-1).
8 EPR
The overall earth resistance and the associated EPR values are shown in Table 8-1.
9 Safety Voltages
The touch and step voltages are shown in Table 9-1. All are within the permissible limits for a
concrete surface.
10 Transfer Voltage
The source substation has a maximum EPR of 999V. As the new substation is the first on the
circuit, a conservative estimate of the transfer voltage has been calculated in accordance with
EDS 06-0012 Appendix I.
The transfer voltage is below the calculated EPR for the new substation hence the transfer
voltage will not affect the new substation.
12 LV Earth
The HV and LV earths can be combined as the EPR of 416V is less than twice the touch
voltage limit (233V for a fault clearance time of 1s on soil).
13 Site Classification
The site can be classified as a COLD site as the EPR is less than 430V once connected to
the network. No further mitigation is required.
14 Earthing Installation
The earthing shall be installed in accordance with UK Power Networks drawing
EDS 07-3102-01 and shall include:
Refer to the Secondary Substation Earthing Construction Standard ECS 06-0023 for all other
requirements.
15 References
EDS 06-0014 Secondary Substation Earthing Design
ECS 06-0023 Secondary Substation Earthing Construction
Appendix A – Drawings