Materials
Trade
Description Unit Basic Price
WATER
PROOFING
Sand cube.
WATER
PROOFING
DPC tar ltr
DOORS &
WINDOWS
4" X 3" Class 1 timber L. ft.
DOORS &
WINDOWS
4" X 2" Class 1 timber L. ft.
DOORS &
WINDOWS
11/4 thick plank s. ft.
DOORS &
WINDOWS
Ply wood door sash size 3' 0" x 6' 9" Nr
DOORS &
WINDOWS
1" thick plank 6" wide L. ft.
DOORS &
WINDOWS
5mm.glaze sheet. s. ft.
DOORS &
WINDOWS
4" Brush Nr
DOORS &
WINDOWS
Sand paper Nr
DOORS &
WINDOWS
Wood primer ltr.
DOORS &
WINDOWS
Enamel paint ltr.
DOORS &
WINDOWS
4" x 3" Butt hinges pair.
DOORS &
WINDOWS
4" x 2" Butt hinges pair.
DOORS &
WINDOWS
3/4" brass screws Nr
DOORS &
WINDOWS
1/2" brass screws Nr
DOORS &
WINDOWS
6" long barrel bolt Nr
DOORS &
WINDOWS
12" long barrel bolt Nr
DOORS &
WINDOWS
Mortice lock Nr
DOORS &
WINDOWS
Hold fast Nr
DOORS &
WINDOWS
casement fastner Nr
DOORS &
WINDOWS
casement stay Nr
FLOOR Bricks Nr
Concrete Mixer
day 1,000.00
operator
2 Anti Corrosive Primer M-002 litre 319.00 2 Plumber L-002 Day 1,500.00 2 Hire of Vibrator P-002 Day 3,500.00
3 Asbestos Corrugated Sheet M-003 Sq.ft 55.00 3 SK Labour L-003 Day 1,500.00 3 Vibrating Rammer P-003 Day 1,750.00
4 Barrel Bolt M-004 No 85.00 4 SK Labour (Vibrator) L-004 Day 1,500.00 4 Welding plant P-004 Day 1,500.00
5 Binding Wire - 16 BW M-005 Lbs 160.00 5 Tinker L-005 Day 1,500.00 5 Water Pump P-005 No 20,500.00
152 Tor Steel Rods including transport to site M-152 Kg. 68.00
Qty
5 Concrete Work
Mixing Concrete
Mixing Concrete 1:2 1/2 :5 (1") Grade Cube 40,892.00 41,555.00 0.00
Screed Concrete
2" thick Cement Concrete screed 1:3:6 (1 1/2) in foundatio Sqr 7,412.00 7,410.00 0.00
3" Thick cement concrete 1:3:6(1-1/2") screed in foundati Sqr 10,989.00 10,990.00 0.00
Mass Concrete
6" Thick cement concrete 1:2-1/2:5(1") in floor (Mass co Sqr 23,625.00 23,610.00 0.00
Column Concrete
Cement concrete 1:2:4(3/4") in 6" X 6" columns in groun Cube 79,920.00 79,410.00
Cement concrete 1:2:4(3/4") in 9" X 9" columns in groun Cube 79,556.00 79,140.00
Cement concrete 1:2:4(3/4") in 12" X 12" columns in gro Cube 75,978.00 75,870.00
Cement concrete 1:2:4(3/4") in 13-1/2" X 13-1/2" column Cube 62,087.00 62,800.00
Beam Concrete
Cement concrete 1:2:4(3/4") in 6" X 6" Beams Upto 1st f Cube 83,727.00 82,570.00
Cement concrete 1:2:4(3/4") in 9" X 6" Beams Upto 1st f Cube 83,457.00 82,360.00
Cement concrete 1:2:4(3/4") in 9" X 9" Beams Upto 1st f Cube 83,187.00 82,160.00
Slab Concrete
5" Thick R.C.C 1:2:4(3/4") floor slab in 1st floor Cube 63,815.00 64,290.00
6" Thick R.C.C 1:2:4(3/4") floor slab in 1st floor Cube 63,747.00 64,230.00
Lintol Concrete
6 Formwork
Column
Sawn timber formwork to 9" x 9" cement concrete column Sqr 22,676.00 21,250.00
Sawn timber formwork to 9" x 9" cement concrete colum 1 use 1,137.00 1,060.00
Beam
Sawn timber formwork for concrete beams in ground flo Sqr 29,166.00 26,850.00
Sawn timber formwork for 9" x 12" concrete beams in gr 1 use 4,098.00 3,900.00
Sawn timber formwork for concrete beams in ground floo 1 use 2,117.00 2,120.00
Slab
Sawn timber formwork for underside of first floor slab Sqr 19,764.00 18,640.00
Sawn timber formwork for 20" x 10" concrete slab in gro 1 use 10,458.00 10,130.00
Sawn timber formwork for underside of first floor slab - 1 use 11,038.00 11,040.00
7 Reinforcement
8 Block Work
9 Brick Work
10 Roof
13 Plastering
14 Tiling
15 Ceiling
16 Painting
17 Sanitary fittings
Total
Blasting Fuse Jumper For Fuel Jute Gravel Compacti Vibrating Vibrator
Steel Rammer
BOQ Labour Water Powder Wire Steel &Forge Hesin ng 60Kg
Unit Days Gal Lbs Lft Lbs % Sqft Cube Cube Days Days
SK USK Total
Cube 0.33 2 2.33 150 Nil Nil Nil Nil Nil Nil Nil Nil
Cube 0.33 2 2.33 110 Nil Nil Nil Nil Nil Nil Nil Nil
Cube 0.33 2 2.33 120 Nil Nil Nil Nil Nil Nil Nil Nil
Cube 0.33 2 2.33 200 Nil Nil Nil Nil Nil Nil Nil Nil
Sqr 0 0 0 Nil Nil Nil Nil Nil Nil Nil Nil Nil
Sqr 0 0 0 Nil Nil Nil Nil Nil Nil Nil Nil Nil
Cube
Cube
Cube
Cube
Cube
Lft
Lft
Lft
Lft
Class ii DDT Cement Sand Bitumen Fire 6"x9" Scaffoldi 3/4" Mixer 11/2" 1" Metal
Cuft Lbs Bags Cube Gal Cube % Cube Days Cube Cube %
Nil Nil 23 0.42 Nil Nil Nil Nil 0.82 0.33 Nil Nil 5.83
Nil Nil 13 0.53 Nil Nil Nil Nil Nil 0.3 0.92 Nil 5.83
Nil Nil 18 0.5 Nil Nil Nil Nil 0.88 -0.33 Nil Nil 5.83
Nil Nil 31 0.44 Nil Nil Nil Nil 0.96 0.33 Nil Nil 5.83
Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 0.00
Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 0.00
Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 0.00
4.5936396
6.360424
10.954064
Page 29 Of 97
Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing
01.B.03
excavated material not exceeding 30' 0"
Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing
01.B.04
excavated material to distance not exceeding 30' 0"
Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing
01.B.05
excavated material not exceeding 30' 0"
Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto
01.B.06
depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"
Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0" and
01.B.07
depositing excavated material to a distance not exceeding 30' 0"
SDS 04/30/2024
Page 30 Of 97
SDS 04/30/2024
Page 31 Of 97
Backfilling
SDS 04/30/2024
Page 32 Of 97
03. Anti termite Treatment & DPC
03.A.01 Anti-Termite treatment on excavated foundation and compacted soil under floors.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1 D. D. T. Powder M-038 Lbs 16 35.00 560.00
DPC
03.B.01 3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.
Analysis for 1 Sqr
1,697.00
17.00
183.00
16,915.00
170.00
1,820.00
42,123.00
422.00
14,885.00
45,610.00
457.00
16,117.00
Page 36 Of 97
05. Concrete Work
A. Mixing Concrete
B. Screed
C. Mass Concrete
D. Column
E. Beam
F. Slab
G. Lintol
Mixing Concrete
Screed Concrete
Mass Concrete
Column Concrete
05.D.01 Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" columns in ground floor. Grade 25
Analysis for 0.51 Cube
1.01 Mixed Concrete 1:1 1/2 : 3 (3/4") 05.A.01 Cube 0.51 36,200.00 18,462.00
06.A.01 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
Analysis for 0.15 Sq
No Item Description Item Ref Unit Quantity Rate Amount
Sawn timber formwork to 9" x 9" cement concrete
1.01 06.A.02 1 Use 1 842.00 842.00
column in ground floor - Making Mould
1.02 Bolts 16mm 18" (12 nos 20 uses) M-010 No 0.6 100.00 60.00
1.04 Timber props 4" x 2" M-144 L.ft 3.5 65.00 227.50
1.07 Carpenter - dismantling, cleaning & repairing L-008 Day 0.25 1,500.00 375.00
U / SK Labourer - dismantling, cleaning &
1.08 L-007 Day 0.25 1,200.00 300.00
repairing
Total for 0.15 Sq 2,519.50
06.A.02 Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould
Rate(Say) 1 Use 842.00
Beam
SDS 04/30/2024
Page 40 Of 97
Slab
SDS 04/30/2024
Page 41 Of 97
07. Reinforcement
Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
7.01
with G.I. Wire as directed.
Analysis for 1 Cwt.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 M.S./Tor Steel Rods including transport to site M-152 kg 50 68.00 3,400.00
Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
7.02
with G.I. Wire as directed.
9,317.00
187.00
12,508.00
251.00
Page 43 Of 97
09.01 Brick Work in cement sand 1:5 in walls in ground floor (4-1/2") thick
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Bricks M-019 No 550 20.00 11,000.00
1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 550.00
Rate(Say) 1 Sq 18,567.00
09.02 Brick wall cement sand 1:5 in ground floor (9" thick)
Rate(Say) 1 Sq 35,649.00
Page 46 Of 97
Rate(Say) 1ft2 356.49
09.05 Brick Work in cement sand 1:5 in superstructure in ground floor (13 1/2" thick)
09.06 Brick Walls in cement sand 1:8 in superstructure in ground floor (9" thick)
Rate(Say) 1 Sq 34,459.00
Brick Walls in cement sand 1:5 in superstructure in GF (facing to brickwork measured separately)
09.07
(4 1/2" Thick) (wire cut)
Bricks in Cement and Sand 1:5 with (Facing to brickwork measured separately) ( 9" Thick) (wire
09.08
cut)
Brick wall in cement and sand 1:5 in ground floor (Facing to brickwork measured separately)
09.09
(13 1/2" Thick )(wire cut)
Page 47 Of 97
Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1 mixture in ground
09.10
floor
09.11 Floor paved in lime mortar 2:5 in ground floor( 3" Thick )
Brick Steps in cement and sand 1:5 with 1/2" thick cement and sand 1:2 rendering including
09.12
necessary excavation. (Steps 1' -1 1/2" x 0' 6")
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.13
rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.14
rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.
09.14 Brick Manholes in cement and sand 1:5 cement sand Motar
Rate(Say) 1 ft 621.85
Rate(Say) 1m 2,039.67
Page 48 Of 97
25,066.00
251.00
2,698.00
2,698.00
2,832.00
2,974.00
3,123.00
48,127.00
482.00 Page 49 Of 97
5,179.00
5,179.00
5,438.00
5,710.00
5,995.00
16.26394052
46,520.00
466.00
5,006.00
5,006.00
5,507.00
6,057.00
6,663.00
Page 50 Of 97
840.00
2,754.00
Page 51 Of 97
10. Roof Covering and Ceiling
Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate ,
10.A.01
beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)
Analysis for 6 Sqrs
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber Class I M-136 Cu.ft 34 1,200.00 40,800.00
10.A.02 Roof Covering With calicut pattern clay tiles in single storeyed building
Rate(Say) 3,350.00
10.A.03 Timber framework for corrugated asbestos sheet roof in single storeyed building
Rate(Say) 6,900.00
Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured
10.A.04
separately)
Rate(Say) 7,570.00
10.A.05 One layer half round clay tiles over corrugated asbestos roof covering
10.A.07 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
Rate(Say) 571.00
10.A.08 3/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)
Rate(Say) 141.00
10.A.09 3/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of rafters
Rate(Say) 139.00
Roof Plumbing
18 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps not
10.B.01
less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on timber members.
18 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6",
10.B.02 soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0" wide
Rate(Say) 338.00
6" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets
10.B.03
fixed at 18" centres (other specials paid seperately)
Analysis for 24 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" eave gutter lengths (12' each) M-088 No 2 970.00 1,940.00
3 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other
10.B.07
specials paid seperately)
Rate(Say) 1 L.ft. 58.00
16,751.00
4,523.00
9,315.00
10,220.00
9,383.00
Page 56 Of 97
173.00
771.00
valance board
191.00
barge board
188.00
1,340.00
Page 57 Of 97
457.00
909.00
909.00
304.00
79.00
412.00 Page 58 Of 97
320.00
Page 59 Of 97
Rate(Say) 615.00
Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including 1 1/4" thick sash and 3
11.A.02
1/4 x 2 1/4" frame (Glazing, Ironmongory and painting measured separately)
Rate(Say) 600.00
Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4" thick sash and 3 1/4" x 2 1/4"
11.A.03
frame (Glazing, Ironmongory and painting measured separately)
Rate(Say) 312.00
Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame having 7/8" thick tongued &
11.A.04
Grooved planks and 3-1/4" x 2-3/4"frame (Glazing, Ironmongory and painting measured separately)
1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 20.00 40.00
window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable sashes and 3 1/4" x 2 1/4"
11.A.05
frame and mullions (Glazing, Ironmongory and painting measured separately)
Rate(Say) 673.00
1/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut and fixed with timber
11.A.06
beadings to doors and windows.
Rate(Say) Page 60 191.00
Of 97
Ironmongery
Page 61 Of 97
831.00
810.00
422.00
847.00
909.00
258.00 Page 62 Of 97
Page 63 Of 97
A. Wall Plastering
B. Rendering
C. Sofit Plastering
D. Skirting
Wall Plastering
13.A.01 5/8" thick plastering to wall in Cement and sand 1:3 including Cement floating
13.A.02 5/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.
13.A.03 5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden float.
13.A.04 5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with lime putty floating.
Rendering
13.B.01 3/4" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
13.B.03 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
13.B.04 3/4" thick rendering in cement and sand 1:2 in floors finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
13.B.05 3/4" thick rendering in cement and sand 1:2 in colored cement floors finished smooth
Analysis for 1 Sqr
Sofit Plastering
13.C.01 3/8" thick plastering to Soffit Slab in Cement and sand 1:3 including floating with Lime putty
13.C.02 3/8" thick plastering to sides and softfit of beams in Cement and sand 1:3 including floating with Lime putty
Analysis for 1 Sq
Skirting
1/2" x 6" Skirting in cement and sand 1:3 projected or flush to walls finished with floating including forming
13.D.01
groove
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1m 367.36
7,083.00
71.00
763.00
5,912.00
60.00
637.00
637.00
700.00
770.00
847.00
26,824.00
269.00
2,887.00
2,887.00
3,175.00
3,493.00
3,842.00
21,669.00
217.00
2,332.00
2,332.00
2,565.00
2,822.00
3,104.00
Page 71 Of 97
36,576.00
366.00
3,936.00
9,353.00
94.00
1,007.00
1,007.00
1,107.00
1,218.00
1,340.00
Page 72 Of 97
6,413.00
65.00
690.00
7,358.00
74.00
792.00
6.25 18.75
9,981.00
100.00
1,074.00
Page 73 Of 97
11,669.00
117.00
1,256.00
13,777.00
138.00
1,483.00
1,483.00
1,631.00
1,794.00
1,974.00
11,901.00
120.00
1,281.00
1,281.00 Page 74 Of 97
1,409.00
1,550.00
1,705.00
152.00
496.00
496.00
546.00
601.00
661.00
Page 75 Of 97
14. Tilling
A. Wall Tilling
B. Floor Tilling
Wall Tilling
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.01
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (6''x6") M-155 No 400 75.00 30,000.00
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.02
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (8''x12") M-156 No 150 100.00 15,000.00
Floor Tilling
14.B.01 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Terrazzo Tiles 12" X 12" M-132 No 100 150.00 15,000.00
14.B.02 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing in neat cement in ground floor
Rate(Say) 1Sq 39,341.00
Rate(Say) 1ft2 393.41
64,173.00
642.00
6,905.00
6,905.00
7,596.00
8,355.00
9,191.00
Page 79 Of 97
41,898.00
419.00
4,509.00
4,509.00
4,959.00
5,455.00
6,001.00
38,473.00
385.00
4,140.00
4,140.00
4,554.00
5,009.00
5,510.00
53,111.00
532.00
5,715.00
5,715.00 Page 80 Of 97
6,287.00
6,915.00
7,607.00
15. Ceiling
Timber Framework for 4' 0"x4' 0" flat asbestos ceiling (Sheet Measured separately)
15.01
Comprising of 4"x2" joists and 2"x2" bearers in class 1 timber
Rate(Say) 8,628.00
Horizontal ceiling lining using 4' 0"x4' 0" flat asbestos cement sheets fixed with and including
15.02
beading and cove mouldings on timber framework(Timber, framework, painting m/separately)
3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4"X2" class I
15.03
timber Joists at 2' 0" centres with 1 1/2 " Brass Nails
3/4" X 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of roof
15.04
rafters. (Existing) with 1 1/2" brass nails including levelling with timber strips where necessary
Rate(Say) 10,621.00
10,525.00
21,375.00
14,339.00
Page 85 Of 97
16. Painting
A. Wall
B. Sofit
C. Wood
D. Steel
Wall
16.A.01 Preparing and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.9 180.00 162.00
Rate(Say) 1 Sq 3,302.00
Soffit
Wood
Steel
16.D.01 Prepare surface of steel trusses and apply two coats of anticorrosive primer.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Anti Corrosive Primer M-002 litre 2.25 319.00 717.75
Rate(Say) 1 Sq 4,910.00
4,458.00
45.00
480.00
480.00
528.00
581.00
639.00
3,135.00
32.00
338.00
338.00
372.00
409.00
449.00
215.00
3.00 Page 89 Of 97
24.00
1,224.00
13.00
132.00
839.00
9.00
91.00
91.00
100.00
110.00
121.00
ft2/10.764 = m2
1 0.0929023 sqft
115.76 sqm
6,629.00
67.00
714.00
2,430.00
25.00
262.00
Page 90 Of 97
81.00
81.00
872.00
3,416.00
35.00
368.00
17. Sanitary Fittings
A. Wash Basin
B. Water Closet
C. Urinal
D. Mirrors
E. Kitchen Sink
F. Squating Pan
G. Bidet
H. Accessories
A. Wash Basin
17.A.01 Supply & Fixing of Pedastal Type Wash Basin
17.A.02 Supply & Fixing of Wall Hung Wash Basin
17.A.03 Supply & Fixing of Vanity Type ( Counter top )Wash Basin
17.A.04 Supply & Fixing of Vanity Type ( Under Counter )Wash Basin
17.A.05 Supply & Fixing of Vanity Type ( Semi recessed Counter top )Wash Basin
17.A.06 Supply & Fixing of Corner Wash Basin
17.A.07 Supply & Fixing of Disabled Wash Basin
B. Water Closet
17.B.01 Supply & Fixing of Close Coupled Water Closet
17.B.02 Supply & Fixing of One piece Unit Water Closet
17.B.03 Supply & Fixing of Wall Hung Water Closet
17.B.04 Supply & Fixing of Disabled Water Closet
C. Urinal
17.C.01 Supply & Fixing of Urinal with Sensor Type Flush Valve
17.C.02 Supply & Fixing of Urinal with Manual Type Flush Valve
17.C.03 Supply & Fixing of Urinal with Urinal Division
D. Mirrors
17.D.01 Supply & Fixing of Mirror
E. Kitchen Sink
17.E.01 Supply & Fixing of Single Bowl Kitchen Sink
17.E.02 Supply & Fixing of Double Bowl Kitchen Sink
F. Squatting Pan
17.F.01 Supply & Fixing of Squatting Pan with Low level Cistern
17.F.02 Supply & Fixing of Squatting Pan with High Level Cistern
G. Bidet
17.G.01 Supply & Fixing of Bidet
H. Accessories
17.H.01 Supply & Fixing of Towel Rail
17.H.02 Supply & Fixing of Towel Ring
17.H.03 Supply & Fixing of Robe Hook
17.H.04 Supply & Fixing of Soap Tray
17.H.05 Supply & Fixing of Tooth Brush Holder
17.H.06 Supply & Fixing of Hand Dryer
17.H.07 Supply & Fixing of Bidet Spray
Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate
1.01 Bidet Spray No 1 0.00
1.07 Screws & fixing elements 5% Item 1
Total for 1 No
Rate for 1 No
Rate(Say) 1 No
Amount Sk Usk
- Soap Tray 200 125 75
- 125 75 200
210.00 1/8 0
- 0.13 0.13
210.00
210.00
210.00 284.00
Timber Classifications
Cyprus, Boron
Ceiling Board/Wall Panelling Teak, Panakka, Lunumidella,
treated Pinus,
Albesia
Saligna, Albesia
In addition to the above,Timber for parquets, Stairway steps & Hand railings areavailable
@the STC depots.
Ebony,Klumadiriya,Satin,Nadu
n, and Teak,Suriyamara , Saligna, Cyprus, and
Timber for Furniture
Treated Pinus
Hulanghik, Jak, Kohomba,
Kolonand variety of Sapu
Special Class
Tamarind (Hard Wood),
Kumbuk