BASIC PRICES

Materials
Trade
Description Unit Basic Price

EXCAVATION Dry hard earth with transport cost cube.

EXCAVATION Quarry dust with transport cost cube.

EXCAVATION 1 1/2" thick plank (class 11) S. ft

EXCAVATION 2" x 4" joist (class 11) L. ft

EXCAVATION 2" x 6" joist (class 11) L. ft

EXCAVATION Wire nails kg.

CONCRETE Cement bag 910.00

CONCRETE Sand cube. 11,000.00

CONCRETE Metal 3/4 " cube.

CONCRETE Metal 1 " cube.

CONCRETE Metal 2 " cube.

CONCRETE Water gal.

FORM WORK 1" thick plank class 11 S. ft

FORM WORK 2 " x 4 " class 11 L. ft

FORM WORK 2 " x 2 " class 11 L. ft

FORM WORK 2 " x 1 " class 11 L. ft

FORM WORK Wire nails kg.

FORM WORK Mould oil ltr

FORM WORK 16mm bolt Nr


REINFORCEMEN
T Tor Steel
REINFORCEMEN
T 25mm kg.
REINFORCEMEN
T 20mm kg.
REINFORCEMEN
T 16mm kg.
REINFORCEMEN
T 12mm kg.
REINFORCEMEN
T 10mm kg.
REINFORCEMEN
T binding wire kg.
REINFORCEMEN
T Mild steel
REINFORCEMEN
T 10mm kg.
REINFORCEMEN
T 6mm kg.
RUBBLE &
CEMENT Rubble cube.
BLOCKS
RUBBLE &
CEMENT cement bag
BLOCKS
RUBBLE &
CEMENT sand cube.
BLOCKS
RUBBLE &
CEMENT water gal.
BLOCKS
RUBBLE &
CEMENT 8" thick cement hollow block Nr
BLOCKS
RUBBLE &
CEMENT 6" thick cement hollow block Nr
BLOCKS
RUBBLE &
CEMENT 4" hick cement hollow block Nr
BLOCKS
BRICK WORK Cement bag

BRICK WORK Sand cube.

BRICK WORK Water gal.

BRICK WORK Bricks Nr


WATER
PROOFING
Cement bag

WATER
PROOFING
Sand cube.

WATER
PROOFING
DPC tar ltr

DOORS &
WINDOWS
4" X 3" Class 1 timber L. ft.
DOORS &
WINDOWS
4" X 2" Class 1 timber L. ft.
DOORS &
WINDOWS
11/4 thick plank s. ft.
DOORS &
WINDOWS
Ply wood door sash size 3' 0" x 6' 9" Nr
DOORS &
WINDOWS
1" thick plank 6" wide L. ft.
DOORS &
WINDOWS
5mm.glaze sheet. s. ft.
DOORS &
WINDOWS
4" Brush Nr
DOORS &
WINDOWS
Sand paper Nr
DOORS &
WINDOWS
Wood primer ltr.
DOORS &
WINDOWS
Enamel paint ltr.
DOORS &
WINDOWS
4" x 3" Butt hinges pair.
DOORS &
WINDOWS
4" x 2" Butt hinges pair.
DOORS &
WINDOWS
3/4" brass screws Nr
DOORS &
WINDOWS
1/2" brass screws Nr
DOORS &
WINDOWS
6" long barrel bolt Nr
DOORS &
WINDOWS
12" long barrel bolt Nr
DOORS &
WINDOWS
Mortice lock Nr
DOORS &
WINDOWS
Hold fast Nr
DOORS &
WINDOWS
casement fastner Nr
DOORS &
WINDOWS
casement stay Nr

ROOF 1" thick Ginisapu plank s. ft.


ROOF 3/4" thick Ginisapu plank s. ft.
ROOF Class 1 timber c. ft.
ROOF Calicut tile Nr
ROOF Calicut pattern ridge tile Nr
ROOF Half round tile Nr
ROOF Asbestos roofing sheet s. ft.
ROOF Reepers 2" x 1" l. ft.
ROOF Wire nails kg.
ROOF Colouring powder kg.
ROOF Cement bag
ROOF Sand cube
ROOF Lime kg.
ROOF " J " bolt Nr
ROOF Wood primer ltr
ROOF Enamel paint ltr
ROOF Wood preservative ltr
ROOF 3/4" x 9" timber for valance board S. ft.
ROOF Asbestos close fitting pair
ROOF Roofing screws Nr
ROOF Brass screws 11/2 Nr

FLOOR Lime kg.

FLOOR Cement cube.

FLOOR Sand cube.

FLOOR water gall.

FLOOR Bricks Nr

FLOOR Floor tile 6" x 6" Nr

FLOOR Flor tile 8" x 8" Nr

FLOOR Floor tile 12" x 12" Nr

FLOOR Tile grout kg.

WALL Cement bag

WALL Sand cube

WALL Lime kg.

WALL water gal

WALL Wall tile 6" x 6" Nr

WALL Wall tile 8" x 12" Nr

WALL Wall tile 8" x 8" Nr

WALL Tile grout kg.

CEILING Cement bag

CEILING Sand cube

CEILING Lime kg.

CEILING water gal

CEILING 4" x 2" class 1 timber l. ft.

CEILING 2" x 2" class 1 timber l. ft.

CEILING 2" x 1" class 1 timber l. ft.


CEILING 11/2" x 11/2" cove moulding l. ft.

CEILING 1/2" x 1/2" beading l. ft.

CEILING 3/4 " thick timber ceiling plank (lunumidella ) s. ft.

CEILING Asbestos ceiling sheet s. ft.

CEILING Wire nails kg.

CEILING Emulsion paint ltr

PAINTING Emulsion paint ltr

PAINTING Weathersheild paint ltr

PAINTING Brush 4" Nr

PAINTING Acrylic filler ltr

PAINTING Sand paper Nr

PAINTING Water gal


PVC Pipe Type 400 (12 ft Standard Length
PLUMBING
pipes)
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PVC Pipe Type 600 (12 ft Standard Length
PLUMBING
pipes)
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PVC Pipe Type 1000 (12 ft Standard Length
PLUMBING
pipes)
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Tee
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Bend
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Elbow
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Value socket
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Faucet Socket
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING PVC Pipe fitting - Socket
PLUMBING 20mm dia pipe (1/2 ") Nr
PLUMBING 25mm dia pipe (3/4") Nr
PLUMBING 32mm dia pipe (1") Nr
PLUMBING 40mm dia pipe (11/4") Nr
PLUMBING 50mm dia pipe (11/2") Nr
PLUMBING 63mm dia pipe (2") Nr
PLUMBING 75mm dia pipe (21/2") Nr
PLUMBING 90mm dia pipe (3") Nr
PLUMBING Solvent cement kg.
Labour Plant

Description Unit Basic Price Description Unit Basic Price

Skilled day 1,000.00 Tractor

Un skilled day 600.00

Skilled Labour day 1,000.00 Concrete Mixer

Un Skilled Labour day 600.00 Vibrator

Vibrator Operator day 1,000.00

Concrete Mixer
day 1,000.00
operator

Skilled Labour day 1,000.00

Un Skilled Labour day 600.00

Skilled labour day 700.00

Un skilled labour day 450.00


Skilled labour day 1,500.00

Un skilled labour day 1,200.00

Skilled Labour day 1,500.00

Un Skilled Labour day 1,200.00

Skilled Labour day 1,500.00

Un Skilled Labour day 1,200.00

Painter day 1,500.00

Carpenter day 1,500.00

Skilled labour day 1,500.00

Un skilled labour day 1,200.00


Skilled Labour day 1,500.00
Un Skilled Labour day 1,200.00
Skilled Labour per day 1,500.00

Un Skilled Labour per day 1,200.00

Skilled Labour per day 1,500.00

Un Skilled Labour per day 1,200.00

Skilled Labour per day 1,500.00

Un Skilled Labour per day 1,200.00


Skilled Labour per day 1,500.00

Un Skilled Labour per day 1,200.00

Skilled Labour per day 1,500.00

Un Skilled Labour per day 1,200.00


Basic Prices 2013

MATERIALS LABOUR PLANT

Item Code Price Item Price Item Price


Description Unit Description Code No. Unit Description Code No. Unit
No. No. ( Rs.) No. ( Rs.) No. ( Rs.)
1 Acid M-001 Gal 356.00 1 Painter L-001 Day 1,500.00 1 Hire of Mixer P-001 Day 4,500.00

2 Anti Corrosive Primer M-002 litre 319.00 2 Plumber L-002 Day 1,500.00 2 Hire of Vibrator P-002 Day 3,500.00

3 Asbestos Corrugated Sheet M-003 Sq.ft 55.00 3 SK Labour L-003 Day 1,500.00 3 Vibrating Rammer P-003 Day 1,750.00

4 Barrel Bolt M-004 No 85.00 4 SK Labour (Vibrator) L-004 Day 1,500.00 4 Welding plant P-004 Day 1,500.00

5 Binding Wire - 16 BW M-005 Lbs 160.00 5 Tinker L-005 Day 1,500.00 5 Water Pump P-005 No 20,500.00

6 Bitumen M-006 Gal 135.00 6 Tiler L-006 Day 1,500.00

7 Blasting Powder M-007 Lbs 280.00 7 U / SK Labourer L-007 Day 1,200.00

8 Blue M-008 Ozs 65.00 8 Carpenter L-008 Day 1,500.00

9 Boild Lime M-009 Cwt 420.00 9 Mason L-009 Day 1,500.00

10 Bolts 16mm 18" M-010 No 100.00 10 Glazier L-010 Day 1,500.00

11 Brass Fanlight Chtches M-011 No 63.00

12 Brass Nails - 1 1/2" M-012 Lbs 70.00

13 Brass Pannel Pins M-013 Doz 2.00

14 Brass scews - 1" M-014 No 3.50

15 Brass Screws 1 1/2" M-015 No 5.25

16 Brass Screws - 1/2 " M-016 No 1.82

17 Brass Screws - 3/4" M-017 No 1.75

18 Brass Screws - 4" Long M-018 No 10.50

19 Bricks M-019 No 20.00

20 Brush - 3" M-020 No 550.00

21 Brush - 6" M-021 No 950.00

22 Brush 2" M-022 No 350.00

23 Butt Hinges M-023 No 100.00

24 Casement Fasteners M-024 No 950.00

25 Casement Stays M-025 No 77.00

26 Cement M-026 Bag 930.00

27 Clear Glass panes M-027 Sq.ft 35.00

28 Clips and Nails - 1 " M-028 No 9.80

29 Clips and Nails - 1 1/2 " M-029 No 14.70

30 Clips and Nails - 1 1/4 " M-030 No 12.25

31 Clips and Nails - 2 " M-031 No 15.05

32 Clips and Screws - 3 " M-032 No 47.60

33 Clout Nails - 1/4" M-033 Lbs 35.00

34 Coir Brush - 6" M-034 No 63.00

35 Coloured Pigment M-035 Lbs 250.00

36 Colouring Powder M-036 Lbs 245.00

37 Cotton Waste M-037 Lbs 50.00

38 D. D. T. Powder M-038 Lbs 35.00

39 Diesel Fuel M-039 Ltr 122.00

40 Door Closer M-040 No 2,590.00

41 Draw Rings M-041 No 35.00

42 Earth Delivered at Site M-042 Cube 2,100.00

43 Emulsion Paint M-043 litre 760.00

44 Enamel Paint M-044 litre 850.00

45 Fibre / Plastic Plugs M-045 No 2.10

46 Fire Wood M-046 Lbs 350.00

47 Flannel Cloth M-047 Yards 98.00

48 Flat Asbestos Ceiling Sheets M-048 Sq.ft 30.00

49 Floor Brush M-049 No 210.00

50 Fuel Forge M-050 Ltr 100.00

51 Fuse wire M-051 L.ft 14.00

Galvanised iron sheet(8'X4') - 18 B.W.G


52 M-052 No 3,080.00
(1.2 mm)
53 Gravel delivered to site M-053 Cube 2,000.00

54 Gutter Brackets M-054 No 27.00

55 Gutter joiner M-055 No 105.00

56 Half Round Clay Tiles M-056 No 7.00

57 Hollow Cement Block - 8" thk. M-057 No 75.00


58 Hollow Cement Blocks - 4" thk. M-058 No 40.00

59 Hollow Cement Blocks - 6" thk. M-059 No 73.00

60 Iron Nails - 1 1/2 M-060 Kg. 150.00

61 Iron Screws - 3/4" M-061 No 0.55

62 Jumper Steel M-062 Lbs 65.00

63 Jute Hessian M-063 Sq.ft 5.00

64 Metal - 1 " M-064 Cube 8,250.00

65 Metal - 1 1/2 " M-065 Cube 7,500.00

66 Metal - 3/4 " M-066 Cube 8,000.00

67 Mild Steel Dowels - 5/8" , 4" Long. M-067 No 20.00

68 Mild Steel Rods including transport to site M-068 Kg. 110.00

69 Mineral Turpentine or Thinner M-069 litre 250.00

70 Mortice lock with screws M-070 No 2,650.00

71 Mould Oil M-071 litre 80.00

72 Nails - 2" M-072 Lbs 50.00

73 Nails - 3/4" M-073 Lbs 20.00

74 Plywood Sash - 6' 9" X 2' 9" M-074 No 2,000.00

75 Primer M-075 litre 180.00


76 PVC Elbows / Bent / Socket - 3/4" M-076 No 15.00
77 PVC Sockets - 1" M-077 No 14.00

78 PVC down pipes - 12' length M-078 No

79 PVC elbow - for rainwater down pipes. M-079 No

80 PVC Elbows / Bent / Socket - 1 1/2" M-080 No 69.00

81 PVC Elbows / Bent / Socket - 1 1/4" M-081 No 42.00

82 PVC Elbows / Bent / Socket - 1" M-082 No 21.00

83 PVC Elbows / Bent / Socket - 1/2" M-083 No 10.50

84 PVC Elbows / Bent / Socket - 2 1/2" M-084 No 350.00


85 PVC Elbows / Bent / Socket - 2" M-085 No 110.00

86 PVC Elbows / Bent / Socket - 3" M-086 No 580.00

87 PVC End cap M-087 No

88 PVC gutter - 12' length M-088 No 970.00

89 PVC gutter head - 6" M-089 No

90 PVC joiner - 3 1/2" M-090 No 297.00

91 PVC mitre bend 6" dia M-091 No

92 PVC Pipes - 1 1/2" M-092 L.ft 46.00

93 PVC Pipes - 1 1/4" M-093 L.ft 32.00

94 PVC Pipes - 1" M-094 L.ft 21.00

95 PVC Pipes - 1/2" M-095 L.ft 7.50

96 PVC Pipes - 2" M-096 L.ft 79.00

97 PVC Pipes - 3" M-097 L.ft 185.00

98 PVC Pipes - 3/4" M-098 L.ft 14.00

99 PVC Shoe M-099 No

100 PVC Sockets - 1 1/2" M-100 No 29.50

101 PVC Sockets - 1 1/4" M-101 No 19.50

102 PVC Sockets - 2" M-102 No 48.00

103 PVC Sockets - 3" M-103 No 192.00

104 PVC Straps M-104 No

105 Ridge Tiles (calicut) M-105 No 35.00

106 Ridges 3' 8" Long (Asbestos) M-106 Pair 245.00

107 Rim Lock with Screws M-107 No 500.00

108 Roof tiles - calicut M-108 No 16.00

109 Roofing Screws and Washers M-109 No 3.50

110 Roofing Screws or Bolts M-110 No 3.50

111 Rubble - 6" - 9" M-111 Cube 6,500.00

112 Salt M-112 Lbs 25.00

113 Sand M-113 Cube 9,000.00

114 Sand Papers M-114 No 25.00

115 Slaked Lime M-115 Lbs 350.00

116 Soldering Lead M-116 Lbs 13.75

117 Solvent Cement M-117 Grms 4.00

118 Spur Stone M-118 No 60.00


119 Tarnap M-119 Gal 450.00

120 Tee - 1 " Dia M-120 No 31.25

121 Tee - 1 1/2 " Dia M-121 No 102.00

122 Tee - 1/2 " Dia M-122 No 15.50

123 Tee - 2 " Dia M-123 No 165.50

124 Tee - 2 1/2" Dia M-124 No 526.00

125 Tee - 3 " Dia M-125 No 875.00

126 Tee - 3/4 " Dia M-126 No 21.50

127 Tee - Dia 1 1/4 " M-127 No 63.50

128 Tee Hinges M-128 Pair 165.00

129 Tiles Pressed - 12" X 12" M-129 No 225.00

130 Tiles Pressed - 8" X 8" M-130 No 110.00


131 Tiles Terrazzo - 6" X 6" M-131 No 100.00
132 Tiles Terrazzo - 12" X 12" M-132 No 150.00

133 Timber Beading - 1/2" X 1/2" M-133 L.ft 1.50

134 Timber Beadings - 1 1/2"X1/2" (Halmilla) M-134 L.ft 12.00

Timber Ceiling Plank - 6"x3/4"


135 M-135 Sq.ft 28.00
(Lunumidella)
136 Timber Class I M-136 Cu.ft 1,200.00

137 Timber Class I - 3" x 1'1/2" M-137 L.ft 45.00

138 Timber Class I - 4"X3" M-138 Cu.ft 1,300.00


139 Timber Class I Planks - 1 1/2" M-139 Sq.ft 140.00
139a Timber Class I Planks - 1" M-139a Sq.ft 110.00
140 Timber Class II M-140 Cu.ft 750.00

141 Timber Class II - 1" Thick M-141 Sq.ft 65.00

142 Timber Class II - 2" x 1" M-142 L.ft 12.00

143 Timber Class II - 2" x 2" M-143 L.ft 22.00

144 Timber class II - 4"X 2" M-144 L.ft 65.00

145 Timber Cove Molding - 2"X2" (Halmilla) M-145 Sq.ft 35.00

146 Timber ceiling Joists - 4" x 2" M-146 L.ft 65.00

147 Timber Planks - 1" (Valance board) M-147 Sq.ft 65.00

148 Timber Purlins M-148 L.ft 100.00

149 Timber Reepers - 2"X1" M-149 L.ft 12.00

150 Timber Strips - 2" X 1/4" M-150 L.ft 5.00

151 Timber Wedges M-151 No 5.00

152 Tor Steel Rods including transport to site M-152 Kg. 68.00

153 Tower / Skeleton Brass Bolts M-153 No 145.00

154 Varnish M-154 Ltr 355.00

155 Wall Tiles Glazed 6" x 6" M-155 No 75.00

156 Wall Tiles Glazed 8" x 12" M-156 No 100.00

157 Water M-157 Gal 0.50

158 Wax Polish M-158 Lbs 310.00

159 White Cement/ tile grout M-159 Lbs 120.00

160 Wire Brush M-160 No 65.00

161 Wire Nails 1" M-161 Lbs 180.00

162 Wire Nails 2" Long M-162 Lbs 95.00

163 Wire Nails 6" Long M-163 Lbs 120.00

164 Wirecut Bricks M-164 No 18.00

165 Wood Preservative M-165 Gal 1,750.00

166 Yellow Ochre M-166 Lbs 15.00


167 Pedastal Type Wash basin M-167 Nos -
168 Angle Valves M-168 Nos -

169 Waste outlet M-169 Nos -

170 Flexible Steel Pipe M-170 Nos -


171 Basin Mixer Tap M-171 Nos -
172 Bottle Trap M-172 Nos -
173 Wall Hung wash basin M-173 Nos -
174 Counter top wash basin M-174 Nos -

175 Under Counter wash basin M-175 Nos -

176 Semi recessed Counter top wash basin M-176 Nos -


Activity
Unit Rate Say BOQ

Qty

1 Site Preparation & Excavation

2 Earth work support and Filling

3 Anti Termite Treatment & DPC

4 Random Rubble Masonry Work

5 Concrete Work

Mixing Concrete

Mixing Concrete 1:1-1/2:3(3/4") Grade 25 Cube 48,870.00 50,400.00 1.00

Mixing Concrete 1:3:6(1 1/2") Grade 15 Cube 38,084.00 38,880.00 1.00

Mixing Concrete 1:2 1/2 :5 (1") Grade Cube 40,892.00 41,555.00 0.00

Mixing Concrete 1:2:4(3/4") Grade 20 0.1 Cube 44,199.00 46,050.00 1.00

Mixing Concrete 1:1:2(3/4") Grade 30 Cube 60,710.00 62,400.00 1.00

Screed Concrete

2" thick Cement Concrete screed 1:3:6 (1 1/2) in foundatio Sqr 7,412.00 7,410.00 0.00

3" Thick cement concrete 1:3:6(1-1/2") screed in foundati Sqr 10,989.00 10,990.00 0.00

Mass Concrete

6" Thick cement concrete 1:2-1/2:5(1") in floor (Mass co Sqr 23,625.00 23,610.00 0.00

Column Concrete

Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" co Cube 66,998.00 67,360.00

Cement concrete 1:2:4(3/4") in 4-1/2" X 6" columns in gr Cube 78,908.00 78,710.00

Cement concrete 1:2:4(3/4") in 6" X 6" columns in groun Cube 79,920.00 79,410.00

Cement concrete 1:2:4(3/4") in 9" X 9" columns in groun Cube 79,556.00 79,140.00

Cement concrete 1:2:4(3/4") in 12" X 12" columns in gro Cube 75,978.00 75,870.00
Cement concrete 1:2:4(3/4") in 13-1/2" X 13-1/2" column Cube 62,087.00 62,800.00

Beam Concrete

Cement concrete 1:2:4(3/4") in 6" X 6" Beams Upto 1st f Cube 83,727.00 82,570.00

Cement concrete 1:2:4(3/4") in 9" X 6" Beams Upto 1st f Cube 83,457.00 82,360.00

Cement concrete 1:2:4(3/4") in 9" X 9" Beams Upto 1st f Cube 83,187.00 82,160.00

Slab Concrete

5" Thick R.C.C 1:2:4(3/4") floor slab in 1st floor Cube 63,815.00 64,290.00

6" Thick R.C.C 1:2:4(3/4") floor slab in 1st floor Cube 63,747.00 64,230.00

Lintol Concrete

Cement concrete 1:2:4(3/4") in 4-1/2" X 6" lintels in gro Lft 149.00

Cement concrete 1:2:4(3/4") in 9" X 9" lintels in ground Lft 459.00

Cement concrete 1:2:4(3/4") in 9" X 12" lintels in ground Lft 608.00

Cement concrete 1:2:4(3/4") in 12" X 15" lintels in groun Lft 1,013.00

6 Formwork

Column

Sawn timber formwork to 9" x 9" cement concrete column Sqr 22,676.00 21,250.00

Sawn timber formwork to 9" x 9" cement concrete colum 1 use 1,137.00 1,060.00

Beam

Sawn timber formwork for concrete beams in ground flo Sqr 29,166.00 26,850.00

Sawn timber formwork for 9" x 12" concrete beams in gr 1 use 4,098.00 3,900.00

Sawn timber formwork for concrete beams in ground floo 1 use 2,117.00 2,120.00

Slab

Sawn timber formwork for underside of first floor slab Sqr 19,764.00 18,640.00

Sawn timber formwork for 20" x 10" concrete slab in gro 1 use 10,458.00 10,130.00

Sawn timber formwork for underside of first floor slab - 1 use 11,038.00 11,040.00

7 Reinforcement

8 Block Work

9 Brick Work
10 Roof

11 Doors and Windows

12 Plumbing & Drainage

13 Plastering

14 Tiling

15 Ceiling

16 Painting

17 Sanitary fittings

Total
Blasting Fuse Jumper For Fuel Jute Gravel Compacti Vibrating Vibrator
Steel Rammer
BOQ Labour Water Powder Wire Steel &Forge Hesin ng 60Kg

Unit Days Gal Lbs Lft Lbs % Sqft Cube Cube Days Days

SK USK Total

Cube 0.33 2 2.33 150 Nil Nil Nil Nil Nil Nil Nil Nil

Cube 0.33 2 2.33 110 Nil Nil Nil Nil Nil Nil Nil Nil

Cube 0 0 0 0 Nil Nil Nil Nil Nil Nil Nil Nil

Cube 0.33 2 2.33 120 Nil Nil Nil Nil Nil Nil Nil Nil

Cube 0.33 2 2.33 200 Nil Nil Nil Nil Nil Nil Nil Nil

Sqr 0 0 0 Nil Nil Nil Nil Nil Nil Nil Nil Nil

Sqr 0 0 0 Nil Nil Nil Nil Nil Nil Nil Nil Nil

Sqr 0 0 0 0 Nil Nil Nil Nil Nil Nil Nil Nil

Cube 0 0 0 0 Nil Nil Nil Nil 0 0

Cube Nil Nil Nil Nil

Cube Nil Nil Nil Nil

Cube Nil Nil Nil Nil

Cube Nil Nil Nil Nil


Cube Nil Nil Nil Nil

Cube

Cube

Cube

Cube

Cube

Lft

Lft

Lft

Lft
Class ii DDT Cement Sand Bitumen Fire 6"x9" Scaffoldi 3/4" Mixer 11/2" 1" Metal

Timber Powder Wood Rubble ng Metal Metal Tools

Cuft Lbs Bags Cube Gal Cube % Cube Days Cube Cube %

Nil Nil 23 0.42 Nil Nil Nil Nil 0.82 0.33 Nil Nil 5.83

Nil Nil 13 0.53 Nil Nil Nil Nil Nil 0.3 0.92 Nil 5.83

Nil Nil 0 0 Nil Nil Nil Nil Nil 0 Nil 0 0.00

Nil Nil 18 0.5 Nil Nil Nil Nil 0.88 -0.33 Nil Nil 5.83

Nil Nil 31 0.44 Nil Nil Nil Nil 0.96 0.33 Nil Nil 5.83

Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 0.00

Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 0.00

Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 0.00

Nil Nil 0 0 Nil Nil Nil Nil 0 0 Nil Nil


8.1272085

4.5936396

6.360424

10.954064
Page 29 Of 97

Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing
01.B.03
excavated material not exceeding 30' 0"

Rate(Say) 1Cube 2,767.50

Rate(Say) 1ft3 27.68

Rate(Say) 1m3 978.00

Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing
01.B.04
excavated material to distance not exceeding 30' 0"

Rate(Say) 1Cube 4,305.00

Rate(Say) 1ft3 43.05

Rate(Say) 1m3 1,521.00

Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing
01.B.05
excavated material not exceeding 30' 0"

Rate(Say) 1Cube 3,600.00

Rate(Say) 1ft3 36.00

Rate(Say) 1m3 1,272.00

Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto
01.B.06
depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"

Rate(Say) 1Cube 3,075.00

Rate(Say) 1ft3 30.75

Rate(Say) 1m3 1,086.57

Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0" and
01.B.07
depositing excavated material to a distance not exceeding 30' 0"

Rate(Say) 1Cube 4,398.00

Rate(Say) 1ft3 43.98

Rate(Say) 1m3 1,554.00

01.B.08 Benching rock in foundation in 3"-6" Steps (Blasting Prohibited)

Rate(Say) 1 Sq.ft 341.25

Rate(Say) 1m2 3,671.85

01.B.09 Rock Requiring Blasting


Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Labour Skilled L-003 Day 3 1,500.00 4,500.00

1.03 Allow 2.5% of Items ( 1.01, 1.02 ) for Tools 112.50

SDS 04/30/2024
Page 30 Of 97

1.04 Fuel Forge etc. M-050 Ltr 0.25 100.00 25.00

1.05 Blasting powder M-007 lbs 0.68 280.00 190.40

1.06 Fuse wire M-051 L.ft 3.05 14.00 42.70

1.07 Steel Jumper M-062 lbs 0.45 46.00 20.70

Total for 1 Cube 4,891.30

Rate for 1 Cube 4,891.30

Rate(Say) 1Cube 4,891.30

Rate(Say) 1ft3 48.91

Rate(Say) 1m3 1,728.00

SDS 04/30/2024
Page 31 Of 97

02. Filling and Earth Work Support


A. Filling
B. Earthwork Support

Backfilling

SDS 04/30/2024
Page 32 Of 97
03. Anti termite Treatment & DPC

A. Anti Termite Treatment


B. DPC

Anti Termite Treatment

03.A.01 Anti-Termite treatment on excavated foundation and compacted soil under floors.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1 D. D. T. Powder M-038 Lbs 16 35.00 560.00

1.01 Water M-157 Gal 20 0.50 10.00

1.02 U / SK Labourer L-007 Day 0.5 1,200.00 600.00

Total for 1 Sqr 1,170.00

Rate for 1 Sqr 1,170.00

Rate(Say) 1Sqr 1,170.00

Rate(Say) 1ft2 11.70

Rate(Say) 1m2 125.89

DPC

03.B.01 3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.
Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 2.25 930.00 2,092.50

1.02 Sand M-113 Cube 0.11 9,000.00 990.00

1.03 Bitumen M-006 Gal 1.5 135.00 202.50

1.04 Fire Wood M-046 Lbs 10 350.00 3,500.00

1.05 Water M-157 Gal 10 0.50 5.00

1.06 Mason L-009 Day 1.25 1,500.00 1,875.00

1.07 U / SK Labourer L-007 Day 2.5 1,200.00 3,000.00

Total for 1 Sqr 11,665.00

Rate for 1 Sqr 11,665.00

Rate(Say) 1Sqr 11,665.00

Rate(Say) 1ft2 116.65

Rate(Say) 1m2 1,255.15

Road Development Department - North - East Province


Page 33 Of 97

1,697.00

17.00

183.00

16,915.00

170.00

1,820.00

Road Development Department - North - East Province


Page 34 Of 97
04. Random Rubble Masonry Work

04.01 Random Rubble Masonry in cement mortar 1:5 in foundation

Analysis for 1 Cube


No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" - 9" Rubble M-111 Cube 1.3 6,500.00 8,450.00

1.02 Cement M-026 Bag 5 930.00 4,650.00

1.03 Sand M-113 Cube 0.3 9,000.00 2,700.00

1.04 Water M-157 Gal 100 0.50 50.00

1.05 Mason L-009 Day 4 1,500.00 6,000.00

1.06 U / SK Labourer L-007 Day 6 1,200.00 7,200.00

Total for 1 Cube 29,050.00

Rate for 1 Cube 29,050.00

Rate(Say) 1Cube 29,050.00

Rate(Say) 1ft3 290.50

Rate(Say) 1m3 10,265.02

04.02 Random Rubble Masonry in cement mortar 1:5 in Superstructure


Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" - 9" Rubble M-111 Cu 1.3 6,500.00 8,450.00

1.02 Cement M-026 Bag 5 930.00 4,650.00

1.03 Sand M-113 Cu 0.3 9,000.00 2,700.00

1.04 Water M-157 Gal 100 0.50 50.00

1.05 Mason L-009 Day 4.5 1,500.00 6,750.00

1.06 U / SK Labourer L-007 Day 7 1,200.00 8,400.00


Allow 3% of Items ( 1.05, 1.06 ) for
1.07 - - - - 454.50
Scaffolding
Total for 1 Cube 31,454.50

Rate for 1 Cube 31,454.50

Rate(Say) 1Cube 31,455.00

Rate(Say) 1ft3 314.55

Rate(Say) 1m3 11,114.84


Page 35 Of 97

42,123.00

422.00

14,885.00

45,610.00

457.00

16,117.00
Page 36 Of 97
05. Concrete Work

A. Mixing Concrete

B. Screed

C. Mass Concrete

D. Column

E. Beam

F. Slab

G. Lintol

Mixing Concrete

05.A.01 Mixing Concrete 1:1-1/2:3(3/4") Grade 25


Analysis for 1 Cube
No. Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 23 930.00 21,390.00

1.02 Sand M-113 Cube 0.42 9,000.00 3,780.00

1.03 3/4 " Metal M-066 Cube 0.82 8,000.00 6,560.00

1.04 Hire of Mixer P-001 Day 0.333 4,500.00 1,498.50

1.05 Water M-157 Gal 150 0.50 75.00

1.06 SK Labour L-003 Day 0.333 1,500.00 499.50

1.07 U / SK Labourer L-007 Day 2 1,200.00 2,400.00

Total for 1 Cube 36,203.00

Rate for 1 Cube 36,203.00

Rate(Say) 1Cube 36,200.00

Rate(Say) 1m3 12,791.52

05.A.02 Mixing Concrete 1:3:6(1 1/2") Grade 15

Rate(Say) 1Cube 28,210.00

Rate(Say) 1m3 9,968.20

05.A.03 Mixing Concrete 1:2 1/2 :5 (1") Grade

Rate(Say) 1Cube 30,290.00

Rate(Say) 1m3 10,703.18

05.A.04 Mixing Concrete 1:2:4(3/4") Grade 20


Analysis for 1 Cube

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 18 930.00 16,740.00


Page 37 Of 97
1.02 Sand M-113 Cube 0.5 9,000.00 4,500.00

1.03 3/4 " Metal M-066 Cube 0.88 8,000.00 7,040.00

1.04 Hire of Mixer P-001 Day 0.333 4,500.00 1,498.50

1.05 Water M-157 Gal 120 0.50 60.00

1.06 SK Labour L-003 Day 0.333 1,500.00 499.50

1.07 U / SK Labourer L-007 Day 2 1,200.00 2,400.00

Total for 1 Cube 32,738.00

Rate for 1 Cube 32,738.00

Rate(Say) 1Cube 32,740.00

Rate(Say) 1m3 11,568.90

05.A.05 Mixing Concrete 1:1:2(3/4") Grade 30


Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Cement M-026 Bag 31 930.00 28,830.00

1.02 Sand M-113 Cube 0.44 9,000.00 3,960.00

1.03 3/4 " Metal M-066 Cube 0.96 8,000.00 7,680.00

1.04 Hire of Mixer P-001 Day 0.333 4,500.00 1,498.50

1.05 Water M-157 Gal 200 0.50 100.00

1.06 SK Labour L-003 Day 0.333 1,500.00 499.50

1.07 U / SK Labourer L-007 Day 2 1,200.00 2,400.00

Total for 1 Cube 44,968.00

Rate for 1 Cube 44,968.00

Rate(Say) 1Cube 44,970.00

Rate(Say) 1m3 15,890.46

Screed Concrete
Mass Concrete
Column Concrete

05.D.01 Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" columns in ground floor. Grade 25
Analysis for 0.51 Cube

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Mixed Concrete 1:1 1/2 : 3 (3/4") 05.A.01 Cube 0.51 36,200.00 18,462.00

Allow 5% of Items ( 1.01 ) for Wastage 923.10

1.025 Hire of Vibrator P-002 Day 0.5 3,500.00 1,750.00

1.03 Mason L-009 Day 0.5 1,500.00 750.00

1.04 U / SK Labourer L-007 Day 1.5 1,200.00 1,800.00

1.05 SK Labourer (Vibrator) L-004 Day 0.5 1,500.00 750.00


Page 38 Of 97
1.06 Jute Hessian M-063 Sq.ft 45 5.00 225.00

1.07 Water M-157 Gal 100 0.50 50.00

1.08 U / SK Labourer (curing) L-007 Day 0.5 1,200.00 600.00

Total for 0.51 Cube 25,310.10

Rate for 1 Cube 49,627.65

Rate(Say) 1Cube 49,628.00

Rate(Say) 1m3 17,536.40

Ground floor - First Floor 1m3 17,536.40

First Floor - Second Floor 1m3 19,290.04

Second Floor - Third Floor 1m3 21,219.04

Third Floor - Fourth Floor 1m3 23,340.94


Page 39 Of 97

06.A.01 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
Analysis for 0.15 Sq
No Item Description Item Ref Unit Quantity Rate Amount
Sawn timber formwork to 9" x 9" cement concrete
1.01 06.A.02 1 Use 1 842.00 842.00
column in ground floor - Making Mould
1.02 Bolts 16mm 18" (12 nos 20 uses) M-010 No 0.6 100.00 60.00

1.03 Mould Oil M-071 litre 0.5 80.00 40.00

1.04 Timber props 4" x 2" M-144 L.ft 3.5 65.00 227.50

1.05 Carpenter - assembling L-008 Day 0.25 1,500.00 375.00

1.06 U / SK Labourer - assembling L-007 Day 0.25 1,200.00 300.00

1.07 Carpenter - dismantling, cleaning & repairing L-008 Day 0.25 1,500.00 375.00
U / SK Labourer - dismantling, cleaning &
1.08 L-007 Day 0.25 1,200.00 300.00
repairing
Total for 0.15 Sq 2,519.50

Rate for 1 Sq 16,796.67

Rate(Say) 1Sq 16,797.00

Rate(Say) 1ft2 167.97

Rate(Say) 1m2 1,807.36

Ground floor - First Floor 1m2 1,807.36

First Floor - Second Floor 1m2 1,988.09

Second Floor - Third Floor 1m2 2,186.90

Third Floor - Fourth Floor 1m2 2,405.59

06.A.02 Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould
Rate(Say) 1 Use 842.00

Beam

SDS 04/30/2024
Page 40 Of 97

Slab

SDS 04/30/2024
Page 41 Of 97
07. Reinforcement

Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
7.01
with G.I. Wire as directed.
Analysis for 1 Cwt.
No Item Description Item Ref Unit Quantity Rate Amount

1.01 M.S./Tor Steel Rods including transport to site M-152 kg 50 68.00 3,400.00

1.02 Allow 15% of Items ( 1.01 ) for Wastage - - - - 510.00

1.03 16 BWG Binding Wire M-005 Lbs 1.5 160.00 240.00


Allow 1.5% of Items ( 1.01 ) for spaces or
1.04 - - - - 51.00
chairs
1.05 SK Labour L-003 Day 1 1,500.00 1,500.00

1.06 U / SK Labourer L-007 Day 1 1,200.00 1,200.00

Total for 1 Cwt. 6,901.00

Rate for 1 Cwt. 6,901.00

Rate(Say) 1Cwt 6,901.00

Rate(Say) 1Kg 138.02

Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
7.02
with G.I. Wire as directed.

Rate(Say) 1Cwt 9,265.00

Rate(Say) 1Kg 185.30


Page 42 Of 97

9,317.00

187.00

12,508.00

251.00
Page 43 Of 97

08. Block Work


Page 44 Of 97
Page 45 Of 97
09. Brick Work

09.01 Brick Work in cement sand 1:5 in walls in ground floor (4-1/2") thick
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Bricks M-019 No 550 20.00 11,000.00
1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 550.00

1.03 Cement M-026 Bag 1.3 930.00 1,209.00

1.04 Sand M-113 Cu 0.1 9,000.00 900.00

1.05 Water M-157 Gal 50 0.50 25.00

1.06 Mason L-009 Day 1.5 1,500.00 2,250.00

1.07 U / SK Labourer L-007 Day 2 1,200.00 2,400.00


Allow 5% of Items (1.06, 1.07 ) for
1.08 - - - - 232.50
Scaffolding
Total for 1 Sqr 18,566.50

Rate for 1 Sqr 18,566.50

Rate(Say) 1 Sq 18,567.00

Rate(Say) 1ft2 185.67

Rate(Say) 1m2 1,997.81

Ground floor 1m2 1,997.81

First Floor 1m2 2,097.70

Second Floor 1m2 2,202.58

Third Floor 1m2 2,312.71

09.02 Brick wall cement sand 1:5 in ground floor (9" thick)

Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 1090 20.00 21,800.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 1,090.00

1.03 Cement M-026 Bag 3 930.00 2,790.00

1.04 Sand M-113 Cu 0.2 9,000.00 1,800.00

1.05 Water M-157 Gal 115 0.50 57.50

1.06 Mason L-009 Day 2.25 1,500.00 3,375.00

1.07 U / SK Labour L-007 Day 3.75 1,200.00 4,500.00


Allow 3% of Items (1.06, 1.07 ) for
1.08 - - - - 236.25
Scaffolding
Total for 1 Sqr 35,648.75

Rate for 1 Sqr 35,648.75

Rate(Say) 1 Sq 35,649.00
Page 46 Of 97
Rate(Say) 1ft2 356.49

Rate(Say) 1m2 3,835.83

Ground floor 1m2 3,835.83

First Floor 1m2 4,027.62

Second Floor 1m2 4,229.01

Third Floor 1m2 4,440.46

09.03 Brick work in cement sand 1:5 in foundation upto D. P. C

09.04 Brick Work in cement sand 1:8 in foundation upto D. P. C

09.05 Brick Work in cement sand 1:5 in superstructure in ground floor (13 1/2" thick)

09.06 Brick Walls in cement sand 1:8 in superstructure in ground floor (9" thick)

Analysis for 1 Sqr 100sqft


No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 1090 20.00 21,800.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 1,090.00

1.03 Cement M-026 Bag 1.75 930.00 1,627.50

1.04 Sand M-113 Cu 0.3 9,000.00 2,700.00

1.05 Water M-157 Gal 115 0.50 57.50

1.06 Mason L-009 Day 2.25 1,500.00 3,375.00

1.07 U / SK Labourer L-007 Day 3 1,200.00 3,600.00


Allow 3% of Items ( 1.06, 1.07 ) for
1.08 - - - - 209.25
Scaffolding
Total for 1 Sqr 34,459.25

Rate for 1 Sqr 34,459.25

Rate(Say) 1 Sq 34,459.00

Rate(Say) 1ft2 344.59

Rate(Say) 1m2 3,707.79

Ground floor 1m2 3,707.79

First Floor 1m2 4,078.57

Second Floor 1m2 4,486.42

Third Floor 1m2 4,935.07

Brick Walls in cement sand 1:5 in superstructure in GF (facing to brickwork measured separately)
09.07
(4 1/2" Thick) (wire cut)
Bricks in Cement and Sand 1:5 with (Facing to brickwork measured separately) ( 9" Thick) (wire
09.08
cut)
Brick wall in cement and sand 1:5 in ground floor (Facing to brickwork measured separately)
09.09
(13 1/2" Thick )(wire cut)
Page 47 Of 97
Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1 mixture in ground
09.10
floor

09.11 Floor paved in lime mortar 2:5 in ground floor( 3" Thick )

Brick Steps in cement and sand 1:5 with 1/2" thick cement and sand 1:2 rendering including
09.12
necessary excavation. (Steps 1' -1 1/2" x 0' 6")
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.13
rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.14
rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.

09.14 Brick Manholes in cement and sand 1:5 cement sand Motar

Analysis for 10 L.ft


No Item Description Item Ref Unit Quantity Rate Amount

1.01 Bricks M-019 No 110 20.00 2,200.00

1.02 Cement M-026 Bag 0.7 930.00 651.00

1.03 Sand M-113 Cu 0.04 9,000.00 360.00

1.04 Water M-157 Gal 15 0.50 7.50

1.05 Mason L-009 Day 1 1,500.00 1,500.00

1.06 U / SK Labourer L-007 Day 1.25 1,200.00 1,500.00

Total for 10 L.ft 6,218.50

Rate for 1 L.ft 621.85

Rate(Say) 1 ft 621.85

Rate(Say) 1m 2,039.67
Page 48 Of 97

25,066.00

251.00

2,698.00

2,698.00

2,832.00

2,974.00

3,123.00

48,127.00
482.00 Page 49 Of 97

5,179.00

5,179.00

5,438.00

5,710.00

5,995.00

9.29 sqm 0.0929023

16.26394052

46,520.00

466.00

5,006.00

5,006.00

5,507.00

6,057.00

6,663.00
Page 50 Of 97

840.00

2,754.00
Page 51 Of 97
10. Roof Covering and Ceiling

A. Roof Frame & Roof Covering


B. Roof Plumbing

Roof frame & Roof Covering

Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate ,
10.A.01
beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)
Analysis for 6 Sqrs
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber Class I M-136 Cu.ft 34 1,200.00 40,800.00

1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 4,080.00

1.03 2"X1" Reepers M-149 L.ft 660 12.00 7,920.00

1.04 Allow 5% of Items ( 1.03 ) for Wastage - - - - 396.00

1.05 Wire Nails 6" Long M-163 Lbs 8 120.00 960.00

1.06 Wire Nails 2" Long M-162 Lbs 2 95.00 190.00

1.07 Carpenter L-008 Day 7 1,500.00 10,500.00

1.08 U / SK Labourer L-007 Day 8 1,200.00 9,600.00

Total for 6 Sqrs 74,446.00

Rate for 1 Sqrs 12,407.67


Rate(Say) 12,408.00

10.A.02 Roof Covering With calicut pattern clay tiles in single storeyed building

Rate(Say) 3,350.00

10.A.03 Timber framework for corrugated asbestos sheet roof in single storeyed building

Rate(Say) 6,900.00

Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured
10.A.04
separately)
Rate(Say) 7,570.00

10.A.05 One layer half round clay tiles over corrugated asbestos roof covering

Rate(Say) 1 Sqr 6,950.00


Page 52 Of 97
10.A.06 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)

Rate(Say) 1 L.ft 128.00

10.A.07 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4

Rate(Say) 571.00

10.A.08 3/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)

Rate(Say) 141.00

10.A.09 3/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of rafters

Rate(Say) 139.00

Roof Plumbing

18 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps not
10.B.01
less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on timber members.

Analysis for 15 L.ft.


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Sheet (8'X4') M-052 Sheet 2 3,080.00 6,160.00

1.02 Wood Preservative M-165 Gal 0.25 1,750.00 437.50

1.03 Cement M-026 Bag 0.1 930.00 93.00

1.04 Slaked Lime M-115 Lbs 0.05 350.00 17.50

1.05 Sand M-113 Cu 0.01 9,000.00 90.00

1.06 1" Thick Class II Timber M-141 Sq.ft 50 65.00 3,250.00

1.07 2" Nails M-072 Lbs 2 50.00 100.00

1.08 Carpenter L-008 Day 1 1,500.00 1,500.00

1.09 U / SK Labourer L-007 Day 1 1,200.00 1,200.00

1.10 Tinker L-005 Day 0.5 1,500.00 750.00

1.11 U / SK Labourer L-007 Day 0.5 1,200.00 600.00

1.12 Mason L-009 Day 0.25 1,500.00 375.00

1.13 U / SK Labourer L-007 Day 0.25 1,200.00 300.00

Total for 15 L.ft. 14,873.00

Rate for 1 L.ft. 991.53


Rate(Say) Lft 992.00
Page 53 Of 97

18 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6",
10.B.02 soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0" wide
Rate(Say) 338.00

6" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets
10.B.03
fixed at 18" centres (other specials paid seperately)
Analysis for 24 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" eave gutter lengths (12' each) M-088 No 2 970.00 1,940.00

1.02 Joiner M-055 No 1 105.00 105.00

1.03 gutter brackets M-054 No 17 27.00 459.00

1.04 3/4" brass screws M-017 No 34 2.00 68.00

1.05 Solvent cement M-117 grms 20 4.00 80.00

1.06 Plumber L-002 Day 0.5 1,500.00 750.00

1.07 U / SK Labourer L-007 Day 0.5 1,200.00 600.00


Allow 5% of Items ( 1.06, 1.07) for
1.08 67.50
Scaffolding
Total for 24 L.ft. 4,069.50

Rate for 1 L.ft. 169.56


Rate(Say) 1 L.ft. 170.00

10.B.04 6" dia PVC gutter head

Rate(Say) 1 No. 673.00

10.B.05 6" dia PVC mitres

Rate(Say) 1 No. 673.00

10.B.06 6" dia PVC end caps

Rate(Say) 1 No. 225.00

3 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other
10.B.07
specials paid seperately)
Rate(Say) 1 L.ft. 58.00

10.B.08 3 1/2" dia PVC elbow


Rate(Say) 1 No. Page 54305.00
Of 97

10.B.09 3 1/2" dia PVC Shoe

Rate(Say) 1 No. 237.00


Page 55 Of 97

16,751.00

4,523.00

9,315.00

10,220.00

9,383.00
Page 56 Of 97

173.00

771.00

valance board

191.00

barge board

188.00

1,340.00
Page 57 Of 97

457.00

221.00 724.88 710

909.00

909.00

304.00

79.00
412.00 Page 58 Of 97

320.00
Page 59 Of 97

11. Doors & Windows

A. Doors & Windows


B. Ironmongery

Doors & Windows


Door Single Hung 3' 3" X7' 0" high overall with frame having 1 1/4" thick sash and 3 1/4" X 2 1/4 ft. timber
11.A.01
frame(glazing, ironmongery & painting measured separately)

Rate(Say) 615.00

Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including 1 1/4" thick sash and 3
11.A.02
1/4 x 2 1/4" frame (Glazing, Ironmongory and painting measured separately)

Rate(Say) 600.00

Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4" thick sash and 3 1/4" x 2 1/4"
11.A.03
frame (Glazing, Ironmongory and painting measured separately)

Rate(Say) 312.00

Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame having 7/8" thick tongued &
11.A.04
Grooved planks and 3-1/4" x 2-3/4"frame (Glazing, Ironmongory and painting measured separately)

Analysis for 16.25 Sq.ft

No Item Description Item Ref Unit Quantity Rate Amount

1.01 4"X3" Timber M-138 Cu.ft 1.7 1,300.00 2,210.00

1.02 Spur Stone M-118 No 2 60.00 120.00

1.03 Fibre / Plastic Plugs M-045 No 6 2.10 12.60

1.04 4" Long Brass Screws M-018 No 6 10.50 63.00

1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 20.00 40.00

1.06 1" Planks M-139a Sq.ft 21 110.00 2,310.00

1.07 Brass Screws 1 1/2" M-015 No 36 5.25 189.00

1.08 Carpenter L-008 Day 2.25 1,500.00 3,375.00

1.09 U / SK Labourer L-007 Day 1 1,200.00 1,200.00

1.10 Mason - fixing frame L-009 Day 0.25 1,500.00 375.00

1.11 U / SK Labourer - fixing frame L-007 Day 0.25 1,200.00 300.00

Total for 16.25 Sq.ft 10,194.60

Rate for 1 Sq.ft 627.36


Rate(Say) 627.00

window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable sashes and 3 1/4" x 2 1/4"
11.A.05
frame and mullions (Glazing, Ironmongory and painting measured separately)

Rate(Say) 673.00
1/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut and fixed with timber
11.A.06
beadings to doors and windows.
Rate(Say) Page 60 191.00
Of 97

Ironmongery
Page 61 Of 97

831.00

810.00

422.00

847.00

909.00
258.00 Page 62 Of 97
Page 63 Of 97

12. Plumbing & Drainage


Page 64 Of 97
Page 65 Of 97
13. Plastering

A. Wall Plastering

B. Rendering

C. Sofit Plastering

D. Skirting

Wall Plastering

13.A.01 5/8" thick plastering to wall in Cement and sand 1:3 including Cement floating

Rate(Say) 1Sq 5,246.00

Rate(Say) 1ft2 52.46

Rate(Say) 1m2 564.47

13.A.02 5/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.

Rate(Say) 1Sq 4,379.00

Rate(Say) 1ft2 43.79

Rate(Say) 1m2 471.18

Ground floor - First Floor 1m2 471.18

First Floor - Second Floor 1m2 518.30

Second Floor - Third Floor 1m2 570.13

Third Floor - Fourth Floor 1m2 627.14

13.A.03 5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden float.

Rate(Say) 1Sq 19,869.00

Rate(Say) 1ft2 198.69

Rate(Say) 1m2 2,137.90

Ground floor - First Floor 1m2 2,137.90

First Floor - Second Floor 1m2 2,351.69

Second Floor - Third Floor 1m2 2,586.86

Third Floor - Fourth Floor 1m2 2,845.55

13.A.04 5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with lime putty floating.

Rate(Say) 1Sq 16,051.00

Rate(Say) 1ft2 160.51

Rate(Say) 1m2 1,727.09

Ground floor - First Floor 1m2 1,727.09

First Floor - Second Floor 1m2 1,899.80

Second Floor - Third Floor 1m2 2,089.78

Third Floor - Fourth Floor 1m2 2,298.75


Page 66 Of 97
13.A.05 5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Slaked Lime M-115 kg 65 350.00 22,750.00

1.02 Sand M-113 Cu 0.07 9,000.00 630.00

1.03 Water M-157 Gal 10 0.50 5.00

1.04 Mason L-009 Day 1 1,500.00 1,500.00

1.05 U / SK Labourer L-007 Day 1.75 1,200.00 2,100.00

1.06 Allow 3% of Items ( 1.04, 1.05 ) for Scaffolding - - - - 108.00

Total for 1 Sqr 27,093.00

Rate for 1 Sqr 27,093.00

Rate(Say) 1Sq 27,093.00

Rate(Say) 1ft2 270.93

Rate(Say) 1m2 2,915.21

Rendering

13.B.01 3/4" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 1.75 930.00 1,627.50

1.02 Sand M-113 Cu 0.08 9,000.00 720.00

1.03 Water M-157 Gal 10 0.50 5.00

1.04 Mason L-009 Day 1.25 1,500.00 1,875.00

1.05 U / SK Labourer L-007 Day 2 1,200.00 2,400.00

1.06 U / SK Labourer - curing L-007 Day 0.25 1,200.00 300.00

Total for 1 Sqr 6,927.50

Rate for 1 Sqr 6,927.50

Rate(Say) 1Sq 6,928.00

Rate(Say) 1ft2 69.28

Rate(Say) 1m2 745.45

Ground floor 1m2 745.45

First Floor 1m2 820.00

Second Floor 1m2 902.00

Third Floor 1m2 992.20


13.B.02 1/2" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 1.07 930.00 995.10

1.02 Sand M-113 Cu 0.05 9,000.00 450.00


Page 67 Of 97
1.03 Water M-157 Gal 10 0.50 5.00

1.04 Mason L-009 Day 1 1,500.00 1,500.00

1.05 U / SK Labourer L-007 Day 1.5 1,200.00 1,800.00

Total for 1 Sqr 4,750.10

Rate for 1 Sqr 4,750.10

Rate(Say) 1Sq 4,750.00

Rate(Say) 1ft2 47.50

Rate(Say) 1m2 511.10

13.B.03 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount

` 1.01 Cement M-026 Bag 1.5 930.00 1,395.00

1.02 Sand M-113 Cu 0.05 9,000.00 450.00

1.03 Water M-157 Gal 10 0.50 5.00

1.04 Mason L-009 Day 1 1,500.00 1,500.00

1.05 U / SK Labourer L-007 Day 1.5 1,200.00 1,800.00

1.06 U / SK Labourer - curing L-007 Day 0.25 1,200.00 300.00

Total for 1 Sq 5,450.00

Rate for 1 Sq 5,450.00

Rate(Say) 1Sq 5,450.00

Rate(Say) 1ft2 54.50

Rate(Say) 1m2 586.42

13.B.04 3/4" thick rendering in cement and sand 1:2 in floors finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 2.25 930.00 2,092.50

1.02 Sand M-113 Cu 0.08 9,000.00 720.00

1.03 Water M-157 Gal 10 0.50 5.00

1.04 Mason L-009 Day 1.25 1,500.00 1,875.00

1.05 U / SK Labourer L-007 Day 2 1,200.00 2,400.00

1.06 U / SK Labourer - curing L-007 Day 0.25 1,200.00 300.00

Total for 1 Sqr 7,392.50

Rate for 1 Sqr 7,392.50

Rate(Say) 1Sq 7,393.00

Rate(Say) 1ft2 73.93

Rate(Say) 1m2 795.49

13.B.05 3/4" thick rendering in cement and sand 1:2 in colored cement floors finished smooth
Analysis for 1 Sqr

No Item Description Item Ref Unit Quantity Rate Amount


Page 68 Of 97
1.01 Cement M-026 Bag 2.25 930.00 2,092.50

1.02 Sand M-113 Cu 0.08 9,000.00 720.00

1.03 Coloured Pigment M-035 Lbs 5 250.00 1,250.00

1.04 Water M-157 Gal 10 0.50 5.00

1.05 Mason L-009 Day 1.25 1,500.00 1,875.00

1.06 U / SK Labourer L-007 Day 2 1,200.00 2,400.00

1.07 U / SK Labourer - curing L-007 Day 0.25 1,200.00 300.00

Total for 1 Sqr 8,642.50

Rate for 1 Sqr 8,642.50

Rate(Say) 1Sq 8,643.00

Rate(Say) 1ft2 86.43

Rate(Say) 1m2 929.99

Sofit Plastering

13.C.01 3/8" thick plastering to Soffit Slab in Cement and sand 1:3 including floating with Lime putty

Rate(Say) 1Sq 10,205.00

Rate(Say) 1ft2 102.05

Rate(Say) 1m2 1,098.06

Ground floor 1m2 1,098.06

First Floor 1m2 1,207.86

Second Floor 1m2 1,328.65

Third Floor 1m2 1,461.52

13.C.02 3/8" thick plastering to sides and softfit of beams in Cement and sand 1:3 including floating with Lime putty

Analysis for 1 Sq

No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.8 930.00 744.00

1.02 Slaked Lime M-115 kg 8 350.00 2,800.00

1.03 Sand M-113 Cu 0.05 9,000.00 450.00

1.04 Water M-157 Gal 5 0.50 2.50

1.05 Mason L-009 Day 2 1,500.00 3,000.00

1.06 U / SK Labourer L-007 Day 2 1,200.00 2,400.00

1.07 Allow 3% of Items ( 1.05, 1.06 ) for Scaffolding - - - - 162.00

Total for 1 Sqr 8,814.50

Rate for 1 Sqr 8,814.50

Rate(Say) 1Sq 8,815.00

Rate(Say) 1ft2 88.15

Rate(Say) 1m2 948.49


Page 69 Of 97
Ground floor 1m2 948.49

First Floor 1m2 1,043.34

Second Floor 1m2 1,147.68

Third Floor 1m2 1,262.45

Skirting

1/2" x 6" Skirting in cement and sand 1:3 projected or flush to walls finished with floating including forming
13.D.01
groove
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount

1.01 Cement M-026 Bag 0.1 930.00 93.00

1.02 Sand M-113 Cu 0.003 9,000.00 27.00

1.03 Coloured Pigment M-035 Lbs 0.25 250.00 62.50

1.04 Mason L-009 Day 0.375 1,500.00 562.50

1.05 U / SK Labourer L-007 Day 0.312 1,200.00 374.40

Total for 10 L.ft 1,119.40

Rate for 1 L.ft 111.94

Rate(Say) 1ft 112.00

Rate(Say) 1m 367.36

Ground floor 1m 367.36

First Floor 1m 404.10

Second Floor 1m 444.51

3rd floor 1m 488.96


Page 70 Of 97

7,083.00

71.00

763.00

5,912.00

60.00

637.00

637.00

700.00

770.00

847.00

26,824.00

269.00

2,887.00

2,887.00

3,175.00

3,493.00

3,842.00

21,669.00

217.00

2,332.00

2,332.00

2,565.00

2,822.00

3,104.00
Page 71 Of 97

36,576.00

366.00

3,936.00

9,353.00

94.00

1,007.00

1,007.00

1,107.00

1,218.00

1,340.00
Page 72 Of 97

6,413.00

65.00

690.00

7,358.00

74.00

792.00

6.25 18.75

9,981.00

100.00

1,074.00
Page 73 Of 97

11,669.00

117.00

1,256.00

13,777.00

138.00

1,483.00

1,483.00

1,631.00

1,794.00

1,974.00

11,901.00

120.00

1,281.00
1,281.00 Page 74 Of 97

1,409.00

1,550.00

1,705.00

152.00

496.00

496.00

546.00

601.00

661.00
Page 75 Of 97
14. Tilling

A. Wall Tilling

B. Floor Tilling

Wall Tilling

Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.01
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (6''x6") M-155 No 400 75.00 30,000.00

1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 3,000.00

1.03 Cement M-026 Bag 2.5 930.00 2,325.00

1.04 Sand M-113 Cu 0.11 9,000.00 990.00

1.05 White Cement M-159 Lbs 1 120.00 120.00

1.06 Mason L-009 Day 4 1,500.00 6,000.00

1.07 U / SK Labourer L-007 Day 4 1,200.00 4,800.00

1.08 U / SK Labourer L-007 Day 0.25 1,200.00 300.00

Total for 1 Sqr 47,535.00

Rate for 1 Sqr 47,535.00

Rate(Say) 1Sq 47,535.00

Rate(Say) 1ft2 475.35

Rate(Say) 1m2 5,114.77

Ground floor 1m2 5,114.77

First Floor 1m2 5,626.24

Second Floor 1m2 6,188.87

Third Floor 1m2 6,807.75

Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.02
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (8''x12") M-156 No 150 100.00 15,000.00

1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 1,500.00

1.03 Cement M-026 Bag 2.5 930.00 2,325.00

1.04 Sand M-113 Cu 0.11 9,000.00 990.00

1.05 White Cement M-159 Lbs 1 120.00 120.00

1.06 Mason L-009 Day 4 1,500.00 6,000.00

1.07 U / SK Labourer L-007 Day 4 1,200.00 4,800.00

1.08 U / SK Labourer L-007 Day 0.25 1,200.00 300.00


Page 76 Of 97
Total for 1 Sqr 31,035.00

Rate for 1 Sqr 31,035.00

Rate(Say) 1Sq 31,035.00

Rate(Say) 1ft2 310.35

Rate(Say) 1m2 3,339.37

Ground floor 1m2 3,339.37

First Floor 1m2 3,673.30

Second Floor 1m2 4,040.63

Third Floor 1m2 4,444.70

Floor Tilling

14.B.01 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Terrazzo Tiles 12" X 12" M-132 No 100 150.00 15,000.00

1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 750.00

1.03 Cement M-026 Bag 1.25 930.00 1,162.50

1.04 Sand M-113 Cu 0.07 9,000.00 630.00

1.05 Coloured Pigment M-035 Lbs 2 250.00 500.00

1.06 Wax Polish M-158 Lbs 0.5 310.00 155.00

1.07 Cotton Waste M-037 Lbs 2 50.00 100.00

1.08 Mason L-009 Day 4 1,500.00 6,000.00

1.09 U / SK Labourer L-007 Day 3 1,200.00 3,600.00

1.10 U / SK Labourer L-007 Day 0.5 1,200.00 600.00

Total for 1 Sqr 28,497.50

Rate for 1 Sqr 28,497.50

Rate(Say) 1Sq 28,498.00

Rate(Say) 1ft2 284.98

Rate(Say) 1m2 3,066.38

Ground floor 1m2 3,066.38

First Floor 1m2 3,373.02

Second Floor 1m2 3,710.33

Third Floor 1m2 4,081.36

14.B.02 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing in neat cement in ground floor
Rate(Say) 1Sq 39,341.00
Rate(Say) 1ft2 393.41

Rate(Say) 1m2 4,233.09


Page 77 Of 97
Ground floor 1m2 4,233.09

First Floor 1m2 4,656.40

Second Floor 1m2 5,122.04

Third Floor 1m2 5,634.24


Page 78 Of 97

64,173.00

642.00

6,905.00

6,905.00

7,596.00

8,355.00

9,191.00
Page 79 Of 97

41,898.00

419.00

4,509.00

4,509.00

4,959.00

5,455.00

6,001.00

38,473.00

385.00

4,140.00

4,140.00

4,554.00

5,009.00

5,510.00

53,111.00
532.00

5,715.00
5,715.00 Page 80 Of 97

6,287.00

6,915.00

7,607.00
15. Ceiling

Timber Framework for 4' 0"x4' 0" flat asbestos ceiling (Sheet Measured separately)
15.01
Comprising of 4"x2" joists and 2"x2" bearers in class 1 timber

Rate(Say) 8,628.00

Horizontal ceiling lining using 4' 0"x4' 0" flat asbestos cement sheets fixed with and including
15.02
beading and cove mouldings on timber framework(Timber, framework, painting m/separately)

Analysis for 1.95 Sqrs


No Item Description Item Ref Unit Quantity Rate Amount
1.01 Flat Asbestos Sheets M-048 Sq.ft 210 30.00 6,300.00

1.02 2"X2" halmilla Cove Moulding M-145 Sq.ft 60 35.00 2,100.00

1.03 1 1/2"X1/2" Halmilla Beadings M-134 L.ft 125 12.00 1,500.00

1.04 1/4" clout Nails M-033 lbs 0.25 35.00 8.75

1.05 Brass Screws 1 1/2" M-015 No 96 5.25 504.00

1.06 Carpenter L-008 Day 1.5 1,500.00 2,250.00

1.07 U / SK Labourer L-007 Day 2 1,200.00 2,400.00


Allow 3% of Items ( 1.06, 1.07 ) for
1.08 - - - - 139.50
Scaffolding
Total for 1.95 Sqrs 15,202.25

Rate for 1 Sqrs 7,796.03


Rate(Say) 7,796.00

3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4"X2" class I
15.03
timber Joists at 2' 0" centres with 1 1/2 " Brass Nails

Analysis for 1.95 Sqrs


No Item Description Item Ref Unit Quantity Rate Amount
1.01 4" x 2" Timber Joists M-146 L.ft 115 65.00 7,475.00
6" x 3/4" Lunumidella Ceiling
1.02 M-135 Sq.ft 215 28.00 6,020.00
Planks.
1.03 Cement M-026 Bag 0.027 930.00 25.11

1.04 Sand M-113 Cu 0.04 9,000.00 360.00

1.05 1 1/2 brass Nails M-012 lbs 9 70.00 616.74


Mason - making holes, fixing joists
1.06 L-009 Day 1 1,500.00 1,500.00
& making goods
Carpenter - making holes, fixing
1.07 L-008 Day 1 1,500.00 1,500.00
joists & making goods
U / SK Labourer - making holes,
1.08 L-007 Day 3 1,200.00 3,600.00
fixing joists & making goods
1.09 Carpenter - Fixing ceiling boards L-008 Day 3 1,500.00 4,500.00
U / SK Labourer - Fixing ceiling
1.10 L-007 Day 4 1,200.00 4,800.00
boards
Allow 3% of Items (1.06, 1.07, 1.08,
1.11 - - - - 477.00
1.09, 1.10) for Scaffolding
Total for 1.95 Sqrs 30,873.85

Rate for 1 Sqrs 15,832.74


Rate(Say) 15,833.00

3/4" X 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of roof
15.04
rafters. (Existing) with 1 1/2" brass nails including levelling with timber strips where necessary

Rate(Say) 10,621.00

Ceilings With Aluminium Frame


11,648.00

10,525.00
21,375.00

14,339.00
Page 85 Of 97

16. Painting

A. Wall

B. Sofit

C. Wood

D. Steel

Wall

16.A.01 Preparing and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.9 180.00 162.00

1.02 Emulsion Paint M-043 litre 1.4 760.00 1,064.00

1.03 Water M-157 Gal 0.1 0.50 0.05

1.04 6" Brush M-021 No 0.1 950.00 95.00

1.05 Sand Papers M-114 Sheet 2 25.00 50.00

1.06 Painter L-001 Day 1.25 1,500.00 1,875.00

1.07 Allow 3% of Items (1.06) for Scaffolding - - - - 56.25

Total for 1 Sqr 3,302.30

Rate for 1 Sqr 3,302.30

Rate(Say) 1 Sq 3,302.00

Rate(Say) 1ft2 33.02

Rate(Say) 1m2 355.30

Ground floor 1m2 355.30

First Floor 1m2 390.82

Second Floor 1m2 429.91

Third Floor 1m2 472.90

16.A.02 Painting walls with emulsion paint (2 Coats)


Rate(Say) 1 Sq 2,322.00

Rate(Say) 1ft2 23.22

Rate(Say) 1m2 249.85

Ground floor 1m2 249.85

First Floor 1m2 274.83

Second Floor 1m2 302.32

Third Floor 1m2 332.55

16.A.03 White or colourwashing two coats in single storey


Rate(Say) 1 Sq 159.00
Page 86 Of 97
Rate(Say) 1ft2 1.59

Rate(Say) 1m2 17.11

16.A.04 White or colourwashing two coats in two storeyed building


Rate(Say) 1 Sqr 906.00

Rate(Say) 1ft2 9.06

Rate(Say) 1m2 97.49

16.A.05 Cement washing to walls of single storyed building 2 coats


Rate(Say) 1 Sq 621.00

Rate(Say) 1ft2 6.21

Rate(Say) 1m2 66.82

Ground floor 1m2 66.82

First Floor 1m2 73.50

Second Floor 1m2 80.85

Third Floor 1m2 88.94

Soffit
Wood
Steel

16.D.01 Prepare surface of steel trusses and apply two coats of anticorrosive primer.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Anti Corrosive Primer M-002 litre 2.25 319.00 717.75

1.02 Mineral Turpentine or Thinner M-069 litre 0.15 250.00 37.50

1.03 Wire Brush M-160 No 1 65.00 65.00

1.04 Brush 2" M-022 No 0.125 350.00 43.75

1.05 Painter L-001 Day 1.5 1,500.00 2,250.00

1.06 U / SK Labourer L-007 Day 1.5 1,200.00 1,800.00

Total for 1 Sqr 4,914.00

Rate for 1 Sqr 4,914.00

Rate(Say) 1 Sq 4,910.00

Rate(Say) 1ft2 49.10

Rate(Say) 1m2 528.32


Apply one coat of anti-Corrosive primer and two coat enamel paint on already shop primed and
16.D.02
erected steel roof truss.
Rate(Say) 1 Sq 1,800.00

Rate(Say) 1ft2 18.00

Rate(Say) 1m2 193.68


Page 87 Of 97
16.D.03 Prepare and apply two coats primer and finishing soat of enamel paint to mild steel (angle/flat) gate.

Rate(Say) 1 Sq. ft 60.00

Rate(Say) 1ft2 60.00

Rate(Say) 1m2 645.60

16.D.04 Painting steel in new work with 2 coats of anti-corrosive paint

Rate(Say) 1 Sqr 2,530.00

Rate(Say) 1ft2 25.30

Rate(Say) 1m2 272.23


Page 88 Of 97

4,458.00

45.00

480.00

480.00

528.00

581.00

639.00

3,135.00

32.00

338.00

338.00

372.00

409.00

449.00

215.00
3.00 Page 89 Of 97

24.00

1,224.00

13.00

132.00

839.00

9.00

91.00

91.00

100.00

110.00

121.00

ft2/10.764 = m2

1 0.0929023 sqft

115.76 sqm

6,629.00

67.00

714.00

2,430.00

25.00

262.00
Page 90 Of 97

81.00

81.00

872.00

3,416.00

35.00

368.00
17. Sanitary Fittings

A. Wash Basin
B. Water Closet
C. Urinal
D. Mirrors
E. Kitchen Sink
F. Squating Pan
G. Bidet
H. Accessories

A. Wash Basin
17.A.01 Supply & Fixing of Pedastal Type Wash Basin
17.A.02 Supply & Fixing of Wall Hung Wash Basin
17.A.03 Supply & Fixing of Vanity Type ( Counter top )Wash Basin
17.A.04 Supply & Fixing of Vanity Type ( Under Counter )Wash Basin
17.A.05 Supply & Fixing of Vanity Type ( Semi recessed Counter top )Wash Basin
17.A.06 Supply & Fixing of Corner Wash Basin
17.A.07 Supply & Fixing of Disabled Wash Basin

B. Water Closet
17.B.01 Supply & Fixing of Close Coupled Water Closet
17.B.02 Supply & Fixing of One piece Unit Water Closet
17.B.03 Supply & Fixing of Wall Hung Water Closet
17.B.04 Supply & Fixing of Disabled Water Closet

C. Urinal
17.C.01 Supply & Fixing of Urinal with Sensor Type Flush Valve
17.C.02 Supply & Fixing of Urinal with Manual Type Flush Valve
17.C.03 Supply & Fixing of Urinal with Urinal Division

D. Mirrors
17.D.01 Supply & Fixing of Mirror

E. Kitchen Sink
17.E.01 Supply & Fixing of Single Bowl Kitchen Sink
17.E.02 Supply & Fixing of Double Bowl Kitchen Sink

F. Squatting Pan
17.F.01 Supply & Fixing of Squatting Pan with Low level Cistern
17.F.02 Supply & Fixing of Squatting Pan with High Level Cistern

G. Bidet
17.G.01 Supply & Fixing of Bidet

H. Accessories
17.H.01 Supply & Fixing of Towel Rail
17.H.02 Supply & Fixing of Towel Ring
17.H.03 Supply & Fixing of Robe Hook
17.H.04 Supply & Fixing of Soap Tray
17.H.05 Supply & Fixing of Tooth Brush Holder
17.H.06 Supply & Fixing of Hand Dryer
17.H.07 Supply & Fixing of Bidet Spray
Analysis for 1 No
No Item Description Item Ref Unit Quantity Rate
1.01 Bidet Spray No 1 0.00
1.07 Screws & fixing elements 5% Item 1

1.08 Plumber L-002 Day 0.14 1,500.00

1.09 U / SK Labourer L-007 Day 1,200.00

Total for 1 No

Rate for 1 No

Rate(Say) 1 No
Amount Sk Usk
- Soap Tray 200 125 75

- 125 75 200

210.00 1/8 0

- 0.13 0.13

210.00

210.00

210.00 284.00
Timber Classifications

Supper Luxury Class Botanical


Luxury Class Special Class Upper
Name
Satin Gammalu
Teak Halmilla Hulanhik
Ebony Milla Margosa
Nedun Mahogany (narrow leaves) Suriyamara,
Calamander Mahogany (broad leaved) Wewarana
Jak Kolon
Velang
Palu

Class I Class II Class III


Tawwanna Alubo Aridda
Uva Mandora Dawata Malaboda
Munamal Dawul-Kurundu Diyathaliya
Ubberiya Godapara Pinus
Eucalyptus Pilularis Halmandora Lunumedella
Eucalyptus Pilularis, Panamora Kalu-Sudu Thalambu
Aceasia Melanoxylon Wa Atamba
Panakka Wellpenna Bulu
Hora Toona Kahata
Kirihambiliya Mihiriya Rubber
Urukanu or Uruhonda Damba Rata-amba (Mango)
Mandora Karaw Ratadel
Pihimbiya Panu-Dan Godakaduru
Ginikulu Rathatiya Gokalu
Halamba Thimbiri Sabbukku(Gravilliya)
Del Dorana Accacia Decaran
Liyan Na-Imbul Athdemata
Neralu Gonapana Godakirilla
Madan Kosganna Mara
Koon Kiripedda Kataboda
Na Talang Goraka
Pathkela & Keeriya Eucalyptus Grandis Tammarin(Sapwood)
Paramara Cypress Ethdemata Bakme
Hedawaka Ginisapu Kakuna
Treated Grandis Ehela Casurina(Kasa Kasa)
Kirikoon & Dunumandala Beth-hik
Boron Treated Sawn Rubberwood, Davu.
Alastonia (Havari Nuga)
Boron Treated Sawn Pinus
Eucalyptus Robusta (Red Gum)
Blue Gum,
Comporta
Redness Coconut
Thiththeta.
How To Select Timber for your Requirements
Type of Usage Conventional Timber Substitute Timber

Beams, Rafters, Ridge Plates,


Purling, Wall Plates Jak,Palu,Eta Thimbiri,Dun Saligna
Jak,Wal Del, Gini Sapu,
Reepers (2" X 2" & 2" X 1") Alastonia Saligna
Wewarana, Panakka, WalDel,
Valence Board Jak, Gini Sapu Grandis

Cyprus, Boron
Ceiling Board/Wall Panelling Teak, Panakka, Lunumidella,
treated Pinus,
Albesia
Saligna, Albesia

Jak, Teak, Milla, Keta Kela,


Door/Window Frames Microcoris Grandis
Path Kela, Koon

Skirting Kolon, Teak, Mahogany, Saligna


Panakka, Coconut

Kolon, Mahogany, Satin,


Beeralu Saligna
Sooriyamara

In addition to the above,Timber for parquets, Stairway steps & Hand railings areavailable
@the STC depots.

Ebony,Klumadiriya,Satin,Nadu
n, and Teak,Suriyamara , Saligna, Cyprus, and
Timber for Furniture
Treated Pinus
Hulanghik, Jak, Kohomba,
Kolonand variety of Sapu
Special Class
Tamarind (Hard Wood),
Kumbuk