Time Sheet 300FT FM Juli 2023 (050224)
Time Sheet 300FT FM Juli 2023 (050224)
1 Jul 2023 06.00 hrs Standby waiting info disch (at Muara Berau)
2 Jul 2023 06.00 hrs Standby waiting info disch, est 17.00 LT sandar di MV (at Muara Berau)
3 Jul 2023 03.20 hrs Sbe Persiapan hibob Jangkar
04.10 hrs jangkar Up conticue mengarah
06.45 hrs In Possy Fc.Green Calipso
07.00 hrs Fwe
07.05 hrs Star Unloading (at Muara Berau)
17.50 hrs Finish Disch
18.00 hrs Sbe persiapan
18.10 hrs Cast Off Mv.Munqidz, Eta Pulau Buaya 04/07/23 06.00 LT
4 Jul 2023 07.00 hrs Passing Pulau Buaya, cont standby waiting pengolongan dibuka 11.00 LT (at Antrian Mahkota Dua)
10.50 hrs Ngolong jemb Mahkota 2
12.50 hrs Ngolong Jemb Mahakam otw Muara Kaman, Eta Muara Kaman 05/07/23 14.00 Lt
5 Jul 2023 06.00 hrs Passing Jetty serbuk, Eta Muara Kaman 05/07/23 10.00 LT
10.10 hrs Arrival Muara Kaman
11.00 hrs Lanjut unk Masuk alur Kedang kepala, Eta Senyiur 06/07/23 09.30 LT
6 Jul 2023 06.10 hrs Tiba Km.99
07.10 hrs Proses lipat bg.PB 3028
07.20 hrs Mengarah ke bawah BL 3 (at Senyiur)
09.10 hrs Sbe unk. Sandar
10.45 hrs In Possy BL 3
10.50 hrs Fwe,/ Star Loading
13.25 hrs Finish Loading
13.30 hrs Sbe
13.35 hrs Cast off jetty Bayan BL 3, Eta Muara kaman 07/07/23 10.30 LT
7 Jul 2023 06.00 hrs passing kp muara siran, eta muara kaman 07/07/23 10.30 LT
09.10 hrs Passing muara kaman
8 Jul 2023 02.00 hrs Tiba harapan baru
02.30 hrs in post tambatan feri2 / FWE
06.00 hrs SBE, persiapan ngolong mahakam (at Harapan Baru)
07.20 hrs Ngolong jemb mahakam
08.40 hrs Ngolong jemb Mahkota ll
11.00 hrs tambat p.Buaya Bg.PB 3028
11.10 hrs Bergerak lenggang to Kutai Lama
12.00 hrs Arrival
12.05 hrs Fwe
13.00 hrs Star Bunker Fw
17.00 hrs Finish Bunker Fw 60 kl
17.05 hrs Sbe Ke p.buaya
18.10 hrs Arrival tender Bg. PB 3028
9 Jul 2023 05.00 hrs Sbe bertolak
05.10 hrs Cast off fm P. Buaya to Muara Berau, Eta Eta Muara berau 10/07/23 18.00
10 Jul 2023 06.00 hrs Passing Tg Bayur, Eta Muara berau 10/07/23 18.00
15.00 hrs Arrival Muara Berau
15.20 hrs Drop anchor
15.30 hrs Fwe
11 Jul 2023 06.00 hrs Standby waiting info disch (at Muara Berau)
14.40 hrs Bg. PB 3028 Larat
14.50 hrs Sbe,hibob jangkar
15.00 hrs jangkar Up cari tempat aman
16.20 hrs Drop jangkar
16.30 hrs Fwe
21.00 hrs Sbe Hibob jangkar per sandar
21.40 hrs jangkar up, mengarah Mv.Aurora Cristine
23.30 hrs In possy Mv.aurora Cristine
23.40 hrs Fwe
12 Jul 2023 06.30 hrs Star Loading
07.00 hrs Disch Progress 5% (at Muara Berau)
13 Jul 2023 02.45 hrs Finish Unloading
02.50 hrs Sbe persiapan
03.00 hrs Cast Off fr Mv.Aurora Cristine to Pulau Buaya, Eta Pulau buaya 13/07/23 15.30 Lt
06.00 hrs Passing Saliki, Eta Pulau buaya 13/07/23 15.30 Lt
14.00 hrs Arrival Sei maryam
14.30 hrs tambatan Pulau Buaya
14.40 hrs Fwe
14 Jul 2023 06.00 hrs Standby waiting repair governour, est 13.00 Finish Repair (at Pulau Buaya)
15.00 hrs Sbe persiapan
15.10 hrs Lepas tambat p. buaya - Mengarah
19.20 hrs Ngolong jemb Mahkota 2
20.30 hrs Ngolong Jem mahakam
21.30 hrs Ngolong Jemb Mahulu
15 Jul 2023 01.30 hrs Ngolong jemb Tenggarong prediksi
06.45 hrs Desa sigihan, Eta Muara kaman 15/07/23 22.00 Lt
16.00 hrs Arrival muara kaman
16.25 hrs Masuk alur kedang kepala, Eta Senyiur 16/07/23 17.00
16 Jul 2023 06.00 hrs passing Kupang Baru, Eta Senyiur 16/07/23 17.00
12.00 hrs Arrival Km.99
12.30 hrs Proses putar bg.PB 3028
12.40 hrs Mengarah to Jetty
14.30 hrs Clear gantung atas BL 1
14.40 hrs Fwe
15.20 hrs Sbe persiapan sandar
15.30 hrs In possy Jetty BL 2
15.40 hrs Fwe
15.50 hrs Star Loading Jetty BL 2
22.20 hrs Sbe persiapan connect 2/nd toing
22.35 hrs Finish Loading, Total Cargo 7.500 MT
22.50 hrs Cast Off fr jet BL 2, Eta Muara kaman 17/07/23 11.00 LT
17 Jul 2023 06.00 hrs passing km 27, Eta Muara kaman 17/07/23 11.00 LT
14.40 hrs Bebas Alur Kedang kepala
15.30 hrs Passing Muara Kaman Otw Harapan Baru, Eta Harapan baru 18/07/23 05.00 Lt
18 Jul 2023 05.20 hrs Tiba harapan baru continue putar tongkang standby pengolongan (at Harapan Baru)
07.40 hrs Ngolong Jemb Mahakam
09.17 hrs Ngolong Jemb Mahkota 2
11.30 hrs Arrival P.Buaya proses tambat
11.50 hrs Tambat p.buaya
12.00 hrs Fwe
19 Jul 2023 05.00 hrs Sbe persiapan
05.10 hrs Bertolak dr Sei maryam to Muara berau, Eta Muara berau 20/07/23 16.00 Lt
20 Jul 2023 06.25 hrs Mendekati muara berau, Eta Muara berau 20/07/23 16.00 Lt
08.20 hrs Arrival Muara berau
08.40 hrs In possy Mv.Mumtaz
09.00 hrs Fwe
16.00 hrs Star UnLoading
21 Jul 2023 06.00 hrs finish discharging, SBE
06.30 hrs cast off dari mv.mumtaz
07.25 hrs passing saliki, ETA pulau buaya 21/07/23 19.00 Lt
16.00 hrs arrival p.buaya
16.50 hrs Clear tambat p.buaya
17.00 hrs continue to galangan meteor
18.30 hrs Tiba di galangan meteor
18.50 hrs inpost galangan meteor,sandar buritan kapal
19.40 hrs menunggu air surut, FWE
22 Jul 2023 01.30 hrs mulai pengerjakan propeller
03.20 hrs clear pengerjakan propeller
07.00 hrs proses air pasang untuk lepas beaching (at Galangan Meteor)
09.00 hrs lepas beaching dari galangan meteor
09.50 hrs tiba Pulau Buaya
10.00 hrs FW, Finish engine
13.15 hrs SPOB BERKAH JAYA II merapat
13.30 hrs Start bunker HSD
15.30 hrs Finish bunker 45.000 Ltr
23 Jul 2023 06.00 hrs Standby waiting antrian pengolongan, Pengolongan dibuka jam 11.00 LT (at Pulau Buaya)
08.50 hrs Sbe persiapan
09.00 hrs bertolak tambat p.Buaya
12.45 hrs Ngolong jemb Mahkota 2
14.35 hrs Ngolong jemb.Mahakam
16.00 hrs Ngolong jemb. Mahulu
22.50 hrs Ngolong jemb.tenggarong otw Muara kaman, Eta Muara kaman 24/07/23 16.30 LT
24 Jul 2023 06.00 hrs Passing Kp Teratak, Eta Muara kaman 24/07/23 16.30 LT
14.00 hrs Arrival Muara Kaman
14.20 hrs Clear tambatan fortune
14.25 hrs Fwe
25 Jul 2023 07.00 hrs Standby waiting info Pos 1 untuk naik Senyiur (at tambatan Fortune)
26 Jul 2023 07.00 hrs Standby waiting info Pos 1 untuk naik Senyiur (at tambatan Fortune)
09.00 hrs Sbe proses lepas tambatan
09.10 hrs lepas tambatan fortune Muara Kaman
10.40 hrs Masuk alur muara Kedang kepala, Eta Senyiur 27/07/23 08.40 Lt
27 Jul 2023 03.00 hrs Arrival km. 99
03.20 hrs Proses putar barge
04.20 hrs In possy Jetty BL 2
04.30 hrs Star Loading /Fwe
06.25 hrs Finish Loading, Total Cargo 5.780 mt
06.30 hrs Sbe persiapan
07.00 hrs Cast off fr jetty BL 2 bayan to CTB muara, Eta Jetty CTB muara kaman 28/07/23 09.00 LT
28 Jul 2023 07.00 hrs Mendekati KM 8 (Kp Muara Siran), Eta Jetty CTB muara kaman 28/07/23 09.00 LT
08.15 hrs Bebas Alur Kedang Kepala
08.30 hrs Putar Bg.PB 3028
09.00 hrs Clear tambat CTB 1
09.10 hrs Fwe
29 Jul 2023 06.00 hrs Standby waiting info penambahan muatan di CTB 1 (at Tambatan CTB 1)
12.00 hrs Sbe persiapan
13.10 hrs In possy Jetty CTB
14.20 hrs Star Loading
13.40 hrs Fwe
14.35 hrs Finish Loading, Total Cargo 7.400 MT
14.40 hrs SBE persiapan
14.45 hrs Cast Off fr jetty CTB 2 to Harapan baru, Eta Harapan Baru 29/07/23 05.00 LT
30 Jul 2023 06.00 hrs Passing Loa Duri, Eta Harapan Baru 09.00 LT
08.30 hrs Ngolong jemb Mahulu
09.00 hrs Arrival Harapan Baru
09.50 hrs Clear Tambat fery2
10.00 hrs Fwe
31 Jul 2023 06.00 hrs Standby waiting Ijin Gerak (at Tambatan Harapan Baru)
1 Aug 2023 06.10 hrs Sbe persiapan
06.20 hrs Lepas tambat HB
07.05 hrs Ngapung2 ikut antri pengelongan Mahakam
08.20 hrs Ngolong jemb Mahakam
10.15 hrs Ngolong jemb Mahkota ll conticue to Muara Berau, Eta Muara berau 02/08/23 19.30 LT
2 Aug 2023 00.50 hrs Bebas Buoy 3
07.00 hrs Passing Bekapai, Eta Muara berau 02/08/23 17.00 LT
17.00 hrs Arrival Muara berau
18.30 hrs Persiapan drop anchor
18.40 hrs Cancel anchor
19.00 hrs Mengarah Mv.Munqidz
23.00 hrs In Possy Mv.Munqidz/fc.Calypso 2
23.05 hrs Star UnLoading
23.40 hrs Fwe
3 Aug 2023 07.00 hrs Disch Progress 65% (at Muara Berau)
08.30 hrs Finish unloading
08.35 hrs Sbe persiapan
08.50 hrs Cast off fr Mv.Munqidz/FC.Califso lanjut p.Buaya, Eta:Pulau Buaya 03/08/23 23.30 LT
22.00 hrs Arrival p.Buaya
23.00 hrs clear tambat p.buaya lanjut
23.50 hrs Arrival Kutai Lama
24.00 hrs Fwe
4 Aug 2023 00.10 hrs Start Bunker
01.30 hrs finish bunker fw 30.000 ltr
01.35 hrs SBE
02.50 hrs tiba di tempat tambatan p.buaya
02.55 hrs FWE
06.45 hrs Standby menunggu pengolongan mahakam (at Pulau Buaya)
14.00 hrs Sbe persiapan
14.20 hrs Lepas tambat P.Buaya
17.20 hrs Ngolong jemb Mahkota ll
18.35 hrs Ngolong jemb Mahakam
19.20 hrs Ngolong Jemb Mahulu
5 Aug 2023 06.00 hrs passing tanjung Harapan, Eta Muara kaman 05/08/23 15.30 Lt
11.00 hrs Tiba Muara kaman
11.20 hrs droup Crew to Barge
12.40 hrs Clear tambat Bg.PB 3028 tambatan Fortune
13.00 hrs Few
6 Aug 2023 07.00 hrs Standby waiting info Pos 1 untuk masuk Senyiur (at Tambatan Fortune)
7 Aug 2023 07.00 hrs Standby waiting info Pos 1 untuk masuk Senyiur (at Tambatan Fortune)
8 Aug 2023 07.00 hrs Standby waiting info Pos 1 untuk masuk Senyiur (at Tambatan Fortune)
9 Aug 2023 07.00 hrs Standby waiting info Pos 1 untuk masuk Senyiur (at Tambatan Fortune)
12.00 hrs Sbe persiapan
12.30 hrs Bg.PB 3028 Lengket kandas di bantu Sb10
13.25 hrs lepas dari kandas tongkang PB 3028,Cast off tambat Furtune
13.30 hrs disconnect TB SB10
14.30 hrs Masuk alur kedang kepala, Eta Senyiur 10/08/23 14.30 Lt
10 Aug 2023 07.00 hrs Posisi Km 75, Eta Senyiur 10/08/23 14.30 Lt
12.30 hrs Arrival area PT. Bayan
13.00 hrs Clear tambat km.99
13.05 hrs Fwe
11 Aug 2023 00.15 hrs SBE persiapan
00.35 hrs Lepas tambat km.99 mengarah jetty
02.00 hrs In Possy jetty BL 3 bayan
02.05 hrs Fwe
02.10 hrs Star Loading
06.25 hrs Finish Loading, Total Cargo 7.400 MT
06.30 hrs SBE persiapan
06.40 hrs Cast Off fr jetty BL 3 to Muara Kaman, Eta Muara kaman 12/08/23 09.30 Lt
16.30 hrs putar Bg.PB 3028
16.50 hrs Tambat km.18
17.00 hrs Fwe
12 Aug 2023 06.00 hrs Sbe persiapan
06.10 hrs Lepas tambat km.18 mengarah otw muara kaman, Eta Muara kaman 12/08/23 09.30 Lt
08.55 hrs Bebas alur kedang kepala
09.40 hrs Passing Muara Kaman Continue to Harapan Baru, Eta Harapan Baru 13/08/2023 02.00 Lt
20.55 hrs Ngolong jemb tenggarong
13 Aug 2023 00.25 hrs Ngolong jemb mahulu
01.45 hrs Arrival Harapan baru
02.00 hrs Clear tambat fery Lama
02.10 hrs Fwe
06.00 hrs Ikut antrian pengolongan Jemb Mahakam
10.40 hrs Arrival P. Buaya
10.50 hrs Conti to bunker Fw
11.30 hrs Arrival Kutai Lama
11.35 hrs Fwe
11.40 hrs Star bunker Fw
13.20 hrs Finish Bunker Fw 30 kl
13.30 hrs Sbe to P.Buaya
14.45 hrs tender buritan Bg.PB 3028 /Few
14 Aug 2023 07.00 hrs standby waiting next info, Eta Vessel 16/08/23 (at Tambatan Pulau Buaya)
15 Aug 2023 04.00 hrs Sbe persiapan
04.10 hrs Lepas tambat pulau buaya Otw muara Berau
07.15 hrs passing tg dewa / bouy12, Eta Muara Berau 16/08/23 16.00 Lt
16 Aug 2023 07.15 hrs passing tg bayur, Eta Muara Berau 16/08/23 16.00 Lt
11.00 hrs Arrival muara berau
13.00 hrs proses drop anchor
13.10 hrs Few
17 Aug 2023 07.00 hrs Standby waiting antrian bongkar (at Muara Berau)
18 Aug 2023 07.00 hrs Standby waiting antrian bongkar (at Muara Berau)
19 Aug 2023 03.00 hrs Sbe persiapan Hibob
03.40 hrs anchor Up Conti Mv.Munqidz
06.40 hrs In possy Fc.Callipso2
06.45 hrs Star Un Loading
07.00 hrs Fwe , Dish Progress 2% (at Muara berau)
20.00 hrs Sbe persiapan
20.20 hrs Finish Un Loading
20.30 hrs Cast off fr fc.GC 2 to Muara berau
20 Aug 2023 07.40 hrs Arrival p.Buaya
07.50 hrs tambat p.Buaya
08.00 hrs Fwe (At Pulau Buaya)
09.00 hrs Sbe persiapan
09.10 hrs Lepas tambat mengarah ke Jemb.Mahkota 2
11.10 hrs Ngolong jemb.Mahkota ll
13.35 hrs Ngolong jemb Mahakam
14.40 hrs Ngolong jemb.Mahulu, Eta Muara kaman 21/08/23 14.00 Lt
21 Aug 2023 07.00 hrs Passing penyebrangan muara kaman, Eta Muara kaman 21/08/23 14.00 Lt
07.30 hrs Arrival M.kaman
07.45 hrs Proses tambat
07.55 hrs Clear tambatan Fortune Muara kaman
08.00 hrs Fwe
22 Aug 2023 07.00 hrs Standby waiting info Pos 1 to Senyiur (At Tambatan Fortune)
08.00 hrs Sbe persiapan
08.30 hrs Lepas tambat Fortune muara kaman
10.40 hrs Masuk alur kedang kepala, Eta Jetty Senyiur 23/08/23 08.00 Lt
23 Aug 2023 04.00 hrs Arrival area jetty Beling-beling
04.10 hrs Proses putar Bg.PB3028 mengarah
04.50 hrs In possy Jetty BL 2 bayan
05.00 hrs Fwe
05.05 hrs Star Loading cargo
07.00 hrs Loading Progress 50% (at Jetty Senyiur, Samarinda)
08.10 hrs Sbe persiapan
08.15 hrs Finish Loading, Total Cargo 5.767 Mt
08.25 hrs Cast Off fr jetty BL 2 to jetty CTB , Eta Jetty CTB 24/08/23 09.00 Lt
20.30 hrs Tiba km 23
20.35 hrs Proses putar tongkang
20.50 hrs Clear tambat di km 23
21.00 hrs FWE
24 Aug 2023 04.00 hrs SBE
04.20 hrs Cast off dari tambatan km23
04.45 hrs Clear putar tongkang
07.30 hrs Passing km 9, Eta CTB 24/08/23 09.00 Lt
08.00 hrs Passing Camp.Muara siran
09.10 hrs Bebas Alur kedang kepala
09.30 hrs Clear tambat Atas jetty CTB
09.40 hrs FWE
25 Aug 2023 04.20 hrs SBE
04.25 hrs cast off dari tambatan
05.30 hrs inpost jetty CTB1
05.40 hrs FWE
07.00 hrs Proses loading 70% (at Muara Kaman)
12.00 hrs Sbe persiapan
12.05 hrs Finish Loading, Total Cargo 7.500 MT
12.20 hrs Cast off fr Ctb 1 to Harapan Baru, Eta Harapan Baru 26/08/23 01.00 Lt
26 Aug 2023 04.15 hrs Ngolong jemb.Mahulu
05.10 hrs Arrival Harapan baru
05.15 hrs Putar Bg.PB 3028 ngapung2
07.15 hrs Ngolong mahakam
08.20 hrs Ngolong jemb.Mahkota ll
10.40 hrs Arrival p.Buaya
10.45 hrs putar Bg.PB 3028
10.55 hrs Clear tambat to P.Buaya
11.00 hrs Few
27 Aug 2023 07.00 hrs Standby waiting info Vessel, Eta Vessel 30/08/23 (at Pulau Buaya)
28 Aug 2023 07.00 hrs Standby waiting info Vessel, Eta Vessel 30/08/23 (at Pulau Buaya)
29 Aug 2023 07.00 hrs Standby waiting info Vessel, Eta Vessel 30/08/23 (at Pulau Buaya)
30 Aug 2023 06.00 hrs SBE
06.10 hrs Cast off dari tambatan pulau buaya, Eta Muara Berau 31/08/23 18.00 Lt
31 Aug 2023 07.00 hrs Passing Tg Bayur, Eta Muara Berau 31/08/23 17.15 Lt
15.00 hrs Arrival Muara Berau
15.30 hrs Proses Drop anchor
15.50 hrs Drop Anchor
16.00 hrs Fwe
1 Sep 2023 07.00 hrs Standby waiting info disch, Eta vessel 02/09/23 (at Muara Berau)
2 Sep 2023 07.00 hrs Standby waiting info disch, Eta vessel 02/09/23 (at Muara Berau)
3 Sep 2023 07.00 hrs Standby waiting info disch, Eta vessel 02/09/23 (at Muara Berau)
4 Sep 2023 07.00 hrs Standby waiting info disch, Eta vessel 02/09/23 (at Muara Berau)
19.00 hrs Sbe persiapan hibob
20.30 hrs anchor up,mengarah ke Mv.Mumtaz
22.30 hrs Arrival Vessel
23.00 hrs in possy Mv.Mumtaz
23.20 hrs Fwe
5 Sep 2023 07.00 hrs Standby waiting info Comm disch (at Muara Berau)
09.00 hrs Commence discharge
6 Sep 2023 02.00 hrs Finish Unloading
02.10 hrs Sbe Persiapan
02.30 hrs Cast off fr Mv.Mumtaz to Pulau Buaya
05.40 hrs Masuk alur saliki
07.05 hrs Passing saliki, ETA pulau buaya 06/09/23 17.20 Lt
13.10 hrs Arrival Sei Mariam
13.20 hrs Proses Tambatan Pulau Buaya
13.30 hrs clear tambat contic to Kutai Lama Bunker Fw
14.05 hrs Arrival Kutai lama
14.15 hrs Fwe
14.20 hrs Star Bunker Fw
17.45 hrs SPOB RIZKI 02 merapat
18.00 hrs START Bunker HSD
21.45 hrs FINISH Bunker 45.000 Ltr
7 Sep 2023 06.50 hrs Sbe persiapan
07.30 hrs lepas tambat Continue
09.40 hrs Ngolong jemb Mahkota
12.50 hrs Ngolong jemb Mahakam
13.50 hrs Ngolong Jemb Mahulu, Eta muara kaman 08/09/23 09.00 Lt
8 Sep 2023 07.30 hrs Arrival Muara Kaman
11.00 hrs Arrival kedang kepala
11.40 hrs Masuk alur kedang kepala, Eta Senyiur 09/09/23 13.00 Lt
9 Sep 2023 07.00 hrs Sailing Empty to Senyiur, Eta Senyiur 09/09/23 13.00 Lt
12.40 hrs Arrival Area Jetty
12.50 hrs Conticue Putar Bg.PB 3028
13.20 hrs In possy Jetty BL 2
13.30 hrs Fwe
13.35 hrs Commance loading
14.30 hrs Sbe Persiapan
14.35 hrs Finish Loading, Total Cargo 3.396 MT
14.45 hrs Cast Off fr jetty Bl2 to Penambahan Ctb, Eta Ctb 10/09/23 09.00 Lt
10 Sep 2023 06.35 hrs passing km 17, Eta Ctb 10/09/23 09.00 Lt
09.50 hrs Bebas alur kedang Kepala
10.50 hrs Clear tambatan atas kedang kepala
11.00 hrs Fwe
11 Sep 2023 07.00 hrs Standby waiting penambahan muatan (at Tambatan Fortune, Muara Kaman)
12 Sep 2023 07.00 hrs Standby waiting penambahan muatan (at Tambatan Fortune, Muara Kaman)
13 Sep 2023 07.00 hrs Standby waiting penambahan muatan (at Tambatan Fortune, Muara Kaman)
15.00 hrs Sbe persiapan
15.10 hrs Lepas tambat conticue
17.00 hrs In Possy CtB 2
17.10 hrs Fwe
17.15 hrs Commance Loading
22.30 hrs Sbe persiapan
22.35 hrs Finish Loading, Total Cargo 7.500 MT
22.45 hrs Cast Off fr Ctb 2 to Harapan Baru, Eta Harapan Baru 14/09/23 13.10 Lt
14 Sep 2023 06.50 hrs Passing Jetty JMB, Eta Harapan Baru 14/09/23 13.10 Lt
12.40 hrs Ngolong jmb.Tenggarong
14.50 hrs Ngolong jmb.Mahulu
15.30 hrs Arrival Harapan Baru
15.50 hrs Clear tambat Fery" HB
16.00 hrs Fwe
15 Sep 2023 06.00 hrs SBE
06.10 hrs Lepas dari tambatan
07.30 hrs Ngapung2 menunggu antrian pengolongan Jemb Mahakam
07.55 hrs Ngolong jemb Mahakam
09.40 hrs Ngolong jemb Mahkota ll, Eta Muara Berau 16/09/23 18.30 Lt
16 Sep 2023 06.55 hrs Passing bekapai, Eta Muara Berau 16/09/23 18.30 Lt
18.30 hrs Arrival Muara Berau
18.50 hrs Clear Drop jangkar
19.00 hrs Fwe
17 Sep 2023 07.00 hrs Standby waiting info disch (at Muara Berau)
18 Sep 2023 05.00 hrs Sbe persiapan
05.10 hrs Proses hibob
06.40 hrs jangkar up Conticue to Mv.Aurora Christine
09.30 hrs Arrival Mv
10.00 hrs In possy Mv.Aurora Christine
10.10 hrs Fwe
20.30 hrs Start Discharging
19 Sep 2023 06.40 hrs Disch Progress 45% (at Muara Berau)
14.20 hrs Finish discharging
14.30 hrs SBE
14.50 hrs Cast off dari mv.aurora christine
20 Sep 2023 02.30 hrs Arrival at pulau buaya
03.00 hrs Clear tambat di pulau buaya, continue kutai lama
03.55 hrs Arrival kutai lama
04.00 hrs FWE
04.30 hrs Start bunker FW
05.40 hrs Clear bunker FW 30 ton
06.00 hrs SBE,kembali ke tongkang di pulau buaya
06.20 hrs passing bouy 16, Cont Antrian Pengolongan Jemb Mahakam
08.00 hrs Sbe persiapan
08.05 hrs Proses lepas tambat p.Buaya
08.10 hrs Conticue to Mahkota ll
10.45 hrs Ngolong Jemb mahkota ll
13.35 hrs Ngolong jemb Mahakam
14.10 hrs Ngolong Mahulu, Eta Muara Kaman 21/09/23 10.00 Lt
21 Sep 2023 07.00 hrs Passing Benua Pohon, Eta Muara Kaman 21/09/23 09.30 Lt
22 Sep 2023 04.45 hrs Arrival Km.99
05.00 hrs Putar bg.PB 3028
06.55 hrs Ikat di bawah BL 3
07.00 hrs Fwe
07.20 hrs Sbe persiapan (at KM 99, Senyiur)
08.25 hrs In possy BL 3
08.30 hrs Fwe
08.35 hrs Commance Loading
11.40 hrs Sbe persiapan
11.50 hrs Finish Loading, Total Cargo 7.500 MT
12.00 hrs Cast off fr Jetty Bayan to Muara kaman, Eta Muara Kaman 23/09/23 10.20 Lt
23 Sep 2023 07.00 hrs Proses antri nunggu buka camp muara siran (at KM 09)
08.30 hrs Bebas Alur kedang kepala
09.30 hrs passing Muara kaman, Eta Harapan Baru 24/09/23 01.30 Lt
18.50 hrs Ngolong jemb tenggarong
22.05 hrs Ngolong jemb Mahulu
24.00 hrs Arrival Harapan Baru
24 Sep 2023 00.20 hrs Clear tambat Feri"
00.30 hrs Fwe
07.00 hrs Standby waiting pengolongan Jemb Mahakam dibuka (at Tambatan Harapan Baru)
13.00 hrs Sbe persiapan
13.20 hrs Lepas tambat Fery" Hb
14.05 hrs Ngolong jemb Mahakam
14.30 hrs Spog OB
15.10 hrs Ngolong Jemb Mahkota 2, Eta Muara berau 26/09/23 02.00 Lt
25 Sep 2023 04.30 hrs Bebas bouy 3
06.24 hrs passing tg ulu, Eta Muara berau 26/09/23 02.00 Lt
26 Sep 2023 01.10 hrs Arrival M.Berau
01.20 hrs Persiapan anchor
01.40 hrs Clear anchor M.Berau
01.50 hrs Fwe
07.00 hrs Standby waiting info disch, Eta Vessel 29/09/23 (at Muara Berau)
27 Sep 2023 07.00 hrs Standby waiting info disch, Eta Vessel 29/09/23 (at Muara Berau)
28 Sep 2023 07.00 hrs Standby waiting info disch, Eta Vessel 29/09/23 (at Muara Berau)
29 Sep 2023 07.00 hrs Standby waiting info disch, Eta Vessel 29/09/23 (at Muara Berau)
30 Sep 2023 07.00 hrs Standby waiting info disch, Eta Vessel 29/09/23 (at Muara Berau)
15.30 hrs Sbe Persiapan hibob
16.20 hrs jangkar up otw to Muharrik
18.00 hrs Arrival Mv.Muhharik
18.30 hrs In possy Mv.Muhharik
18.40 hrs Fwe
20.30 hrs Start discharging
1 Oct 2023 06.25 hrs Disch Progress 35% (at Muara Berau)
2 Oct 2023 01.45 hrs Finish Unloading
01.50 hrs Sbe persiapan
02.00 hrs Cast off fr mv.Muharrik to pulau Buaya, Eta Pulau Buaya 02/10/23 14.00 Lt
07.00 hrs Passing Saliki, Eta Pulau Buaya 02/10/23 14.00 Lt
14.00 hrs Arrival Sei Mariam 14.40 Conti to Mahkota 2
16.55 hrs Ngolong jemb Mahkota ll
18.15 hrs Ngolong jemb Mahakam
19.20 hrs Ngolong jemb Mahulu
23.10 hrs Ngolong jemb tenggarong, Eta Muara kaman 03/10/23 16.30 Lt
3 Oct 2023 07.00 hrs Passing Teratak, Eta Muara kaman 03/10/23 16.30 Lt
10.45 hrs arrival muara kaman
11.30 hrs Masuk alur kedang kepala, Eta Senyiur 04/10/23 10.20 Lt
4 Oct 2023 03.30 hrs Arrival
03.40 hrs continue Putar Bg.PB 3028
04.05 hrs In possy BL 1
04.10 hrs Commance Loading
04.20 hrs Fwe
06.10 hrs Finish loading Cargo 5.699 MT
06.10 hrs Sbe persiapan
06.15 hrs Cast off fr jetty Bayan BL 1 to CTB penambahan
20.10 hrs Arrival Km.18 conticue putar bg.PB 3028
20.30 hrs Clear Tambat km.18
20.30 hrs Fwe
5 Oct 2023 08.20 hrs Bebas alur kedang kepala
08.30 hrs Putar Bg.PB 3028 cont to Ctb 2
09.05 hrs In possy CTB 2
09.10 hrs Commence Loading/ Fwe
10.40 hrs Sbe persiapan
10.50 hrs Finish Loading, Total Cargo 7.500 MT
11.00 hrs Cast Off fr CTB 2 to Harapan baru, Eta Harapan Baru 06/10/23 05.00 Lt
23.30 hrs Ngolong jemb Tenggarong
6 Oct 2023 03.15 hrs Ngolong Jemb.Mahulu
04.30 hrs Arrival Harapan Baru
04.50 hrs Ngapung2 tunggu buka pengolongan
07.25 hrs Ngolong jemb Mahakam
08.10 hrs Ngolong jemb.Mahkota 2
10.50 hrs Arrival P.Buaya
11.10 hrs Clear tambat P.Buaya
11.20 hrs Fwe
16.00 hrs Sbe ke kutai Lama
16.55 hrs Arrival
17.00 hrs Fwe
21.25 hrs Star Bunker Fw
7 Oct 2023 00.45 hrs Finish isi Fw 45 ton
01.00 hrs Sbe fr kutai lama to Pulau Buaya
02.00 hrs Fwe/ tender Bg.PB 3028
07.00 hrs Standby waiting info vessel (at Tambatan Pulau Buaya)
8 Oct 2023 05.00 hrs Sbe persiapan lepas tambat fm Pulau Buaya
05.25 hrs bertolak to Muara Berau, Eta Muara berau 09/10/23 15.00 Lt
9 Oct 2023 07.00 hrs Passing Tg Bayur, Eta Muara berau 09/10/23 15.00 Lt
15.00 hrs Arrival Muara berau
16.20 hrs Clear drop Anchor M.Berau
16.30 hrs Fwe
10 Oct 2023 07.00 hrs Standby waiting info disch (at Muara Berau)
11 Oct 2023 07.00 hrs Standby waiting info disch (at Muara Berau)
17.00 hrs Sbe Persiapan hibob
17.40 hrs jangkar up conticue to Mv.Munif
20.00 hrs In possy Mv.Munif
20.10 hrs Fwe
21.30 hrs Start Bongkar
12 Oct 2023 07.00 hrs Disch Progress 35% (at Muara Berau)
14.00 hrs Finish unloading
14.10 hrs Sbe persiapan
14.30 hrs Cast Off fm mv.Munif fm Muara berau to pulau Buaya, Eta Pulau buaya 13/10/23 02.00 Lt
13 Oct 2023 01.30 hrs Arrival Sei mariam
01.35 hrs Continue tambat p.buaya
01.45 hrs Clear tambat Bg.PB 3028 pulau Buaya continue to kutai lama
02.10 hrs Arrival kutai lama bunker Fw /Fwe
02.15 hrs Star bunker Fw
04.20 hrs Finish bunker Fw 35 Ton /Sbe continue to pulau buaya
05.50 hrs Arrival balik buaya
06.15 hrs Beaching at Balik buaya
06.20 hrs Fwe
11.10 hrs Star Kerja propeler
14.30 hrs Finish cek propeler
17.20 hrs star M/E Seatrial keadaan propeler, baik dan aman
17.30 hrs Fwe
18.20 hrs Mulai pengelasan mainhole dpn Cargo Bg.PB 3028
20.10 hrs SPOB BERKAH PANDAWA 01
20.20 hrs SELESAI TENDER SPOB BERKAH PANDAWA 01 DI SISI KANAN
20.30 hrs START BUNKER BBM
22.10 hrs Las Menhol Cargo Baut menhol dol semua
22.15 hrs Lanjut Las border buritan dan kanan Bg.PB 3028
23.30 hrs FINISH BUNKER 45.000 Ltr
14 Oct 2023 04.00 hrs Border kanan finish Lanjut border buritan proses at las
07.00 hrs Proses las border buritan tengah, Est Finished 14.00 Lt (at Pulau Buaya)
14.00 hrs Sbe persiapan
14.10 hrs Lepas tambat Pulau Buaya otw to Mahkota ll
16.40 hrs Ngolong Jemb Mahkota ll
17.55 hrs Ngolong jemb Mahakam
18.30 hrs Ngolong Jemb Mahulu
23.00 hrs Ngolong Jemb tenggarong, Eta Muara kaman 15/10/23 13.30 Lt
15 Oct 2023 07.00 hrs Passing Kp Senoni, Eta Muara kaman 15/10/23 13.30 Lt
12.30 hrs Arrival M.Kaman
13.25 hrs Masuk alur kedang kepala, Eta Senyiur 16/10/23 05.00 Lt
16 Oct 2023 07.00 hrs Passing KM 92, Eta Senyiur 16/10//23 09.00 Lt
14.30 hrs Sbe persiapan
14.50 hrs lepas tambat km.99 conti to Jetty
16.15 hrs Ikat beling2 atas BL1
16.20 hrs Fwe
16.50 hrs Sbe persiapan sandar
17.50 hrs In Possy BL 2
18.00 hrs Fwe
19.15 hrs ComLoading
21.50 hrs Sbe persiapan
22.00 hrs Finish Loading, Total Cargo 7.500 MT
22.05 hrs Cast off fr jetty BL 2 to Muara kaman, Eta Muara kaman 17/10/23 11.30 Lt
17 Oct 2023 07.00 hrs Passing KM 32, Eta Muara kaman 17/10/23 11.30 Lt
10.50 hrs Bebas alur kedang Kepala
11.40 hrs Passing Muara Kaman, Eta Harapan baru 18/10/23 04.00 Lt
18 Oct 2023 05.00 hrs Arrival to harapan baru
06.20 hrs Ngapung2 menunggu info dari herlin ( At Harapan Baru)
09.50 hrs Clear tambat di harapan baru
10.10 hrs FWE
19 Oct 2023 07.00 hrs Standby waiting info Ijin Gerak to Pengolongan Jembt Mahakam (At Tambatan Harapan Baru)
20 Oct 2023 06.30 hrs SBE
06.35 hrs Lepas dari tambatan
07.25 hrs persiapan ngolong mahakam
09.10 hrs Ngolong Jemb Mahkota ll
11.40 hrs Arrival Sei Mariam
11.50 hrs Clear Tambat P.Buaya
12.00 hrs Fwe
21 Oct 2023 05.00 hrs Sbe persiapan
05.30 hrs Continue Fm Pulau Buaya to Muara berau, Eta Muara berau 22/10/23 17.00 Lt
22 Oct 2023 07.00 hrs Passing Tg Bayur, Eta Muara berau 22/10/23 17.00 Lt
16.00 hrs Arrival M.Berau
16.50 hrs Clear drop Anchor per Muara Berau
17.00 hrs Fwe
23 Oct 2023 07.00 hrs standby waiting info disch (at Muara Berau)
24 Oct 2023 07.00 hrs standby waiting info disch (at Muara Berau)
10.30 hrs Sbe hibob anchor
11.10 hrs Anchor Up Otw to Mv. Natascha
11.45 hrs In possy Mv. Natascha
12.00 hrs Fwe
23.00 hrs Start disch
25 Oct 2023 07.00 hrs Disch Progress 85% (at Muara Berau)
11.15 hrs Finish Unloading
11.45 hrs Cast Off fr Mv.Natascha to P.Buaya, Eta Pulau Buaya 26/10/23 00.30 Lt
23.30 hrs Arrival at Pulau Buaya
23.40 hrs Clear tambat Pulau Buaya
24.00 hrs Conticue Fr P.Buaya to Kutai Lama
26 Oct 2023 00.30 hrs Arrival at kutai Lama
00.40 hrs Fwe,
00.45 hrs Star bunker Fw
02.15 hrs Finish bunker fw 60 Ton
02.20 hrs Sbe bertolak fr kutai lama to Pulau buaya
03.35 hrs Arrival Tambatan pulau Buaya
03.40 hrs Fwe
05.00 hrs Sbe persiapan
05.20 hrs Lepas tambat fr pulau Buaya to Muara kaman
06.40 hrs ngolong Jemb Mahakam, Cont antrian ngolong Jemb Mahakam
08.35 hrs Ngolong jemb Mahakam
09.45 hrs Ngolong Jemb Mahulu, Eta Muara kaman 27/10/23 07.00 Lt
27 Oct 2023 06.30 hrs Arrival Muara Kaman
06.40 hrs Clear tambatan Fortune
07.00 hrs Fwe, Standby waiting info pos 1 to Senyiur (at Tambatan Fortune, Muara Kaman)
14.30 hrs Sbe persiapan
14.50 hrs Lepas tambat Fortune muara Makam
15.50 hrs Masuk Alur kedang kepala, Eta Senyiur 28/10/23 10.00 Lt
28 Oct 2023 07.00 hrs Passing KM 93, Eta Senyiur 28/10/23 10.00 Lt
08.00 hrs Arrival Km.99
09.10 hrs Clear tambat Km.99
09.30 hrs Fwe
21.30 hrs Sbe persiapan
21.40 hrs Lepas tambat putar Bg.PB 3028
22.30 hrs Clear tambat bawah BL 3
22.40 hrs Fwe
23.40 hrs Sbe persiapan sandar
23.50 hrs lepas tambat mengarah
29 Oct 2023 00.30 hrs In possy BL 3
00.40 hrs Fwe, Comm Loading
02.00 hrs Sbe Assist Kado cast off BL 2
02.15 hrs Disc Con fr Barge Kado
02.20 hrs Finish Loading, Total Cargo 4.025 MT
02.25 hrs connecr 2nd toing
02.30 hrs Cast off fr BL 3 to CTB
07.00 hrs Sailing Load to CTB, Eta Ctb 29/10/23 17.00 Lt
16.45 hrs Bebas alur kedang kepala
17.20 hrs Clear tambatan Kedang kepala atas
17.30 hrs Fwe
30 Oct 2023 07.00 hrs Stanby waiting info penambahan cargo (at Tambatan Fortune, Muara Kaman)
17.10 hrs Sbe Persiapan
17.20 hrs Lepas tambat atas kedang kepala mengarah
18.20 hrs In Possy CTB 2
18.30 hrs Fwe
19.30 hrs Comm Loading
21.40 hrs Sbe persiapan
21.50 hrs Finish Loading, Total Cargo 7.400 MT
22.00 hrs Cast off fr CTB 2 to Harapan Baru, Eta Harapan Baru 31/10/23 15.00 Lt
31 Oct 2023 05.50 hrs Kabul tebal posisi segihan
06.00 hrs Putar tongkang
06.25 hrs Selesai tambat di segihan, menunggu terang
06.30 hrs FWE
07.20 hrs SBE
07.25 hrs Lepas dari tambatan segihan
16.30 hrs Arrival harapan baru
16.45 hrs Clear tambat di fery2
17.00 hrs FWE
1 Nov 2023 05.50 hrs SBE
06.00 hrs Lepas dari tambatan fery2
06.25 hrs Ngapung2 di depan PDAM, antrian pengolongan mahakam
07.35 hrs Ngolong jemb Mahakam
09.23 hrs Ngolong Jemb Mahkota ll, Eta Muara jawa 02/11/23 09.40 Lt
2 Nov 2023 03.00 hrs Arrival Muara jawa
04.05 hrs In Possy Fc.GC
04.10 hrs Disch Commance
04.20 hrs Fwe
07.00 hrs Disch Progress 20% (at Muara Jawa)
13.20 hrs Finish UnLoading
13.30 hrs Sbe persiapan
13.40 hrs Cast off fr mv.munqidz/Fc.GC Muara jawa to pulau buaya, Eta Pulau Buaya 03/11/23 01.00 Lt
23.40 hrs Arrival P.Buaya
23.45 hrs Proses Tambat
23.50 hrs Clear tambatan p.Buaya bawah
24.00 hrs Fwe
3 Nov 2023 07.00 hrs Standby waiting info Pengolongan Jemb Mahkota Dua (at Pulau Buaya)
08.00 hrs Sbe persiapan
08.15 hrs Proses lepas kan dr tambatan P.Buaya bawah
09.10 hrs Lepas tambat p.Buaya Conticue
11.50 hrs Ngolong jemb Mahkota ll
14.10 hrs Ngolong Jemb mahakam
15.20 hrs Ngolong Jemb Mahulu, Eta Muara pahu 05/11/23 13.00 Lt
4 Nov 2023 06.50 hrs Passing muara kaman, Eta Muara pahu 05/11/23 13.00 Lt
5 Nov 2023 06.50 hrs Passing Tepian Ulak, Eta Muara pahu 05/11/23 10.00 Lt
10.10 hrs Arrival muara Pahu
10.20 hrs Clear labuh Jangkar Muara pahu
10.30 hrs Fwe
6 Nov 2023 07.00 hrs Standby waiting info Loading (at Tambatan Muara Pahu)
8 Nov 2023 07.00 hrs Standby waiting info Loading (at Tambatan Muara Pahu)
9 Nov 2023 10.50 hrs Sbe persiapan
11.00 hrs Lepas Tambat fr kmp.atas Muara pahu Continue to jetty tg.Pagar
12.35 hrs Arrival Jetty tg pagar
12.40 hrs In Possy Jety 1 tg pagar
13.00 hrs Fwe
20.30 hrs Commance Loading
10 Nov 2023 01.35 hrs Finish Loading, Total Cargo 7.500 MT
05.40 hrs Cast off jetty 1 tg.Pagar
07.00 hrs Proses tambat sebrang Jetty
07.10 hrs Clear tambat
07.15 hrs Fwe
04.35 hrs SBE
05.40 hrs Cast off dari BL1
06.35 hrs Ngapung2 di depan jetty
07.10 hrs Tambat di depan jetty tg paga, menunggu pandu
07.15 hrs FWE
15.25 hrs Pilot on board
15.30 hrs SBE
15.50 hrs Cast off tambatan tg pagar
11 Nov 2023 06.00 hrs Passing Rantau Lurus/Sailing Load
09.00 hrs Tiba di tambatan atas kedang kepala
09.10 hrs Proses putar tongkang
09.30 hrs Clear tambat di atas kedang kepala
09.40 hrs Fwe
12 Nov 2023 06.00 hrs Standby channel 14, menunggu info dari jetty CTB, Pengurangan muatan 412 MT di CTB
08.30 hrs SBE
08.40 hrs Lepas dari tambatan
10.15 hrs inpost jetty CTB 1
10.20 hrs Proses Triming
10.30 hrs FWE
10.45 hrs Clear Triming
10.50 hrs SBE
11.00 hrs Cast off dari jetty CTB 1, continue harapan baru
13 Nov 2023 02.40 hrs Arrival harapan baru
02.50 hrs Continue putar tongkang
03.00 hrs FWE
06.00 hrs SBE
06.15 hrs Cast off dari tambatan harapan baru
07.00 hrs Ngapung2 antrian ngolong jembatan Mahakam
13 Nov 2023 06.00 hrs SBE
06.15 hrs Cast off dari tambatan harapan baru
07.20 hrs Ngolong mahakam
22.10 hrs Bebas alur muara pegah
14 Nov 2023 04.30 hrs Arrival m.jawa
04.45 hrs inpost at mv.natascha
04.50 hrs Start Discharging
05.00 hrs FWE
07.00 hrs at Muara Jawa Proses Discharging 15%
04.00 hrs Finish Discharging
04.10 hrs SBE
04.20 hrs Cast off at mv natascha, full away to pulau buaya/sungai meriam
06.00 hrs Mendekati bouy 3 Sailing empty to S.Meriam/Samarinda, ETA sungai meriam : 15.11.2023 jam 16.00 Lt
15 Nov 2023 18.00 hrs Arrival at sungai meriam
18.30 hrs Clear tambat p.buaya
18.40 hrs Continue kutai lama , bunker FW
19.30 hrs Arrival kutai lama
19.40 hrs FWE
20.40 hrs Start bunker FW
21.40 hrs Finish bunker FW
21.45 hrs SBE
22.30 hrs Tiba di tongkang p.buaya
22.35 hrs FWE
23.00 hrs Start bunker FO
16 Nov 2023 02.30 hrs Finish bunker FO, 45.000 Ltr
07.05 hrs Prepare ngolong mahkota 2
16 Nov 2023 08.00 hrs SBE
08.20 hrs Lepas tambat dari pulau buaya, continue muara kaman
11.25 hrs Ngolong mahkota2
13.40 hrs Ngolong mahakam
14.27 hrs Dokumen kapal & tongkang, dokumen crew via klotok harapan baru
15.20 hrs Ngolong jemb. Mahulu
17 Nov 2023 07.00 hrs Passing taratak, Eta Muara Kaman 17/11/23 10.30 Lt
11.40 hrs Arrival M.Kaman
13.20 hrs Masuk Alur kedang kepala
18 Nov 2023 06.35 hrs Arrival Km.99
06.45 hrs Putar Bg.PB 3028
07.05 hrs In Possy BL 1 pt.bayan Senyiur
07.10 hrs Fwe
07.20 hrs Com Loading
18 Nov 2023 07.20 hrs Commence Loading
12.30 hrs Finish Loading, Total Cargo 7.400 MT
12.40 hrs Sbe persiapan
12.50 hrs Cast off fr Jetty Bayan to Muara Kaman, Eta Muara kaman 19/11/23 10.10 Lt
19 Nov 2023 07.00 hrs Passing KM 12, Eta Muara kaman 19/11/23 09.00 Lt
08.00 hrs Bebas alur kedang kepala
08.50 hrs Passing muara kaman conticue to Harapan baru, Eta Harapan Baru 20/11/23 02.00 Lt
22.30 hrs Ngolong Jemb tenggarong
20 Nov 2023 02.10 hrs Ngolong jemb Mahulu
02.30 hrs Arrival Harapan Baru
02.40 hrs Proses putar Bg.PB 3028
03.00 hrs Clear Tambat Fery" Harapan Baru
03.20 hrs Fwe
07.00 hrs Standby waiting Ijin Gerak (at Tambatan Harapan Baru)
21 Nov 2023 07.00 hrs Standby waiting Info Pengolongan, Pengolongan dibuka jam 12.00 Lt (at Tambatan Harapan Baru)
11.00 hrs Sbe persiapan
11.20 hrs Lepas tambat fery" Harapan baru
14.15 hrs Ngolong jemb Mahakam
15.25 hrs Ngolong jemb Mahkota ll contic to Muara Jawa, Eta Muara Jawa 22/11/23 14.10 LT
22 Nov 2023 06.40 hrs Bebas bouy 3, Full away muara jawa, Eta Muara Jawa 22/11/23 14.10 LT
10.30 hrs Arrival M.Jawa
10.40 hrs Clear Drop anchor Jangkar
11.00 hrs Fwe
23 Nov 2023 05.30 hrs Sbe proses hibob Jangkar
06.10 hrs Jangkar up otw to Mv.Munqidz conticue to Fc.Gren kalipsko
07.50 hrs Star Disch
13.30 hrs Dokumen OB
15.30 hrs Sbe connect 2nd Toing
15.40 hrs Finish Unloading
15.55 hrs Cast Off fr Mv.Munqidz/Fc.GC Muara Jawa to P.Buaya, Eta P.Buaya 24/11/23 05.00 Lt
24 Nov 2023 05.10 hrs Arrival Sei Mariam
05.20 hrs Passing fr P.Buaya conticue to jemb Mahkota ll
06.15 hrs Ngolong jemb Mahkota ll
08.15 hrs Ngolong jemb Mahakam
08.30 hrs Dokumen Out board area Harapan baru
09.20 hrs Ngolong jemb Mahulu, Eta Muara kaman 25/11/23 10.00 Lt
25 Nov 2023 06.30 hrs Arrival area M.Kaman
06.50 hrs Clear Tambatan bawah Fortune M.Kaman
07.00 hrs Fwe
09.00 hrs Sbe persiapan
09.10 hrs Lepas tambatan fortune M.Kaman
12.45 hrs masuk Alur kedang kepala, Eta Senyiur 26/11/23 08.00 LT
26 Nov 2023 07.00 hrs Passing KM 98, Eta Senyiur 26/11/23 08.00 LT
07.30 hrs Arrival Km.99
07.40 hrs Putar Bg.PB 3028
08.50 hrs Clear tambat Atas BL 1
09.00 hrs Fwe
11.00 hrs Sbe persiapan lepas
11.35 hrs In Pos sy Jetty BL l
11.40 hrs Commance Loading
13.20 hrs Finish Loading, Total Cargo 5.563 MT / Sbe persiapan
13.30 hrs Cast Off fr BL 1 senyiur to floting CTB penambahan, Eta Ctb 27/11/23 09.30 LT
27 Nov 2023 07.00 hrs Sailing Load to CTB, Eta Ctb 27/11/23 09.30 LT
09.40 hrs Bebas alur Kedang kepala
10.10 hrs Clear Tambat atas kedang kepala
10.40 hrs Fwe
28 Nov 2023 07.00 hrs Standby waiting info Penambahan Cargo (at Tambatan Fortune)
19.00 hrs Sbe Persiapan
20.30 hrs In Pos sy CtB ll
20.35 hrs Fwe
20.40 hrs Comance Loading CTB ll
21.30 hrs Sbe Shifting/Connect 2nd toing
21.45 hrs Finish Loading, Total Cargo 7.500. MT
21.55 hrs Cast Off fr CTB ll to Harapan Baru, Eta Harapan Baru 29/11/23 14.00 LT
29 Nov 2023 07.00 hrs Passing Embalut, Eta Harapan Baru 29/11/23 14.00 LT
11.25 hrs Ngolong Jembt.Tenggarong
15.00 hrs Arrival Loa janan putar Bg.PB 3028 Ngapung2
17.05 hrs Ngolong Jemb Mahulu
19.00 hrs Clear Tambatan Fery" Harapan Baru
19.10 hrs Fwe
30 Nov 2023 06.00 hrs Sbe persiapan
06.10 hrs Lepas tambatan Fery" Harapan Baru
07.45 hrs Ngolong Jemb Mahakam
09.05 hrs Ngolong Jemb Mahkota ll Conticue
11.10 hrs Arrival Sei Mariam
11.25 hrs Clear tambat p.Buaya
11.30 hrs Fwe
1 Dec 2023 07.00 hrs Standby waiting info vessel (at Tambatan Pulau Buaya)
2 Dec 2023 07.00 hrs Standby waiting info vessel (at Tambatan Pulau Buaya)
3 Dec 2023 07.00 hrs Standby waiting info vessel, Info Vessel 06/12/23 (at Tambatan Pulau Buaya)
4 Dec 2023 07.00 hrs Standby waiting info vessel, Info Vessel 06/12/23 (at Tambatan Pulau Buaya)
5 Dec 2023 07.00 hrs Standby waiting info vessel, Info Vessel 06/12/23 (at Tambatan Pulau Buaya)
6 Dec 2023 07.00 hrs Standby waiting info vessel, Info Vessel 08/12/23 (at Tambatan Pulau Buaya)
22.00 hrs Sbe persiapan
22.25 hrs Cast off fr p.Buaya to Muara Berau, Eta Muara Berau 08/12/23 07.00 Lt
7 Dec 2023 07.00 hrs Passing buoy 6, Eta Muara Berau 08/12/23 07.00 Lt
8 Dec 2023 07.00 hrs Passing Tg. Marong, Eta Muara Berau 08/12/23 09.00 Lt
09.30 hrs Arrival M.Berau
11.00 hrs Clear drop Anchor Per Muara Berau
11.10 hrs Fwe
22.30 hrs Sbe persiapan Hibob Jangkar
23.10 hrs Jangkarup conticue to Mv.Aurora Cristin
9 Dec 2023 00.40 hrs In Possy Mv.Aurora Cristine
00.50 hrs Fwe
06.00 hrs Dischard unloading
08.00 hrs Bongkaran 10% terbongkar (at Muara Berau)
22.00 hrs Finish UnLoading Mg.Aurora Cristine
22.10 hrs Sbe persiapan
22.30 hrs Cast Off fr Aurora Cristine Muara Berau to Pulau Buaya Continue, Eta Pulau Buaya 10/12/23 10.00 LT
10 Dec 2023 08.00 hrs Arrival P.Buaya conticue to Mahkota ll
09.00 hrs Pengolongan Tutup
09.20 hrs Clear drop anchor per.Sumber mas
09.30 hrs Fwe
16.00 hrs Sbe proses hibob
16.25 hrs Jangkar up, conti to Mahkota ll
19.35 hrs Ngolong jemb Mahkota ll
20.50 hrs Ngolong jmb Mahakam
22.05 hrs Ngolong jmb Mahulu, Eta Muara kaman 11/12/23 20.00 LT
11 Dec 2023 07.00 hrs Passing Yupa Besar, Eta Muara kaman 11/12/23 20.00 LT
20.50 hrs Arrival Muara Kaman
21.20 hrs Clear tambatan fortune M.Kaman
21.30 hrs Fwe
12 Dec 2023 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan FOrtune, Muara Kaman)
08.00 hrs Sbe persiapan
08.10 hrs Lepas tambat fortune Muara Kaman
11.50 hrs Masuk Alur kedang kepala Conti to Senyiur, Eta Senyiur 13/12/23 11.00 LT
13 Dec 2023 07.00 hrs Passing KM 88, Eta Senyiur 13/12/23 11.00 LT
09.00 hrs Putar Barge Km.98
09.10 hrs Conticue to Jetty Bayan
09.50 hrs Arrival Km.99
10.50 hrs Clear tambat Atas BL 1
11.00 hrs Fwe
13.30 hrs Sbe persiapan
13.40 hrs Lepas, mundur2 Bg at BL 2
14.40 hrs In Possy jetty BL 2
14.50 hrs Fwe
15.10 hrs Comance Loading
18.00 hrs Finish Loading /Fwe, Total Cargo 7.400 MT
18.05 hrs Cast off fr jetty Bayan senyiur to Muara Kaman, Eta Muara kaman 14/12/23 10.00 Lt
14 Dec 2023 07.00 hrs Passing KM 10, Eta Muara kaman 14/12/23 10.00 Lt
08.45 hrs Bebas alur kedang kepala
09.30 hrs Arrival M.Kaman conti to Harapan baru, Eta Harapan baru 15/12/23 01.30 LT
18.45 hrs Ngolong Jemb Tenggarong
22.40 hrs Ngolong Jemb Mahulu
24.00 hrs Arrival Harapan baru
15 Dec 2023 00.20 hrs Clear tambat Fery" HB
00.30 hrs Fwe
05.30 hrs SBE
05.30 hrs Cast off dari tambatan fery2
07.10 hrs Ngapung2 di depan PDAM, menunggu antrian ngolong mahakam
07.18 hrs Ngolong mahakam
08.22 hrs Ngolong Jemb Mahkota ll, Eta Muara berau 16/12/23 17.00 LT
16 Dec 2023 06.55 hrs Passing Bekapai, Eta Muara berau 16/12/23 17.00 LT
19.30 hrs Arrival M.Berau
20.00 hrs Conti to Mv.Muadz
21.45 hrs In Possy Mv. Muadz Muara Berau
22.00 hrs Fwe
17 Dec 2023 07.00 hrs Start Disch (at Muara Berau)
18.00 hrs Finish unloading
18.30 hrs Sbe persiapan connect 2nd toing
19.00 hrs Cast Off Mv.Muadz M.Berau to P.Buaya, Eta P.Buaya 18/12/23 07.00 LT
18 Dec 2023 06.00 hrs Arrival P.Buaya
06.20 hrs Clear Tambatan P.Buaya
06.30 hrs Fwe
07.00 hrs Start banker
10.00 hrs Finish banker 45000 Ltr
09.30 hrs Sbe Bantu SB 10
09.40 hrs Conti Toing Sb 10
10.00 hrs Clear back to PB 3028
10.20 hrs Fwe /tender Bg.PB 3028
14.30 hrs Sbe persiapan
14.45 hrs Lepas tambatan P.Buaya to jemb.Mahkota
17.30 hrs Ngolong Jemb Mahkota ll
18.45 hrs Ngolong jemb Mahakam
19.50 hrs Ngolong jemb Mahulu, Eta Muara Kaman 19/12/23 20.00 LT
19 Dec 2023 07.00 hrs Passing penyebrangan serbaya, Eta Muara Kaman 19/12/23 17.00 LT
16.30 hrs Arrival Muara kaman
17.50 hrs Masuk alur kedang kepala, Eta Senyiur 20/12/23 19.00 LT
20 Dec 2023 07.00 hrs Sailing empty to Senyiur, Eta Senyiur 20/12/23 19.00 LT
12.35 hrs Arrival
14.40 hrs Clear tambatan Km.99
14.50 hrs Fwe
21.50 hrs Sbe persiapan
22.00 hrs Lepas tambatan Km.99 Conti to
22.05 hrs Clear tambat Atas BL 1
23.10 hrs Fwe
21 Dec 2023 02.50 hrs Sbe persiapan
03.35 hrs In Possy Jetty BL 1 Bayan
03.40 hrs Fwe
04.55 hrs Start loading
06.25 hrs Proses loading 65% (at Jetty Senyiur)
08.40 hrs Sbe Persiapan Connect 2/nd toing
08.45 hrs Finish Loading, Total Cargo 7.400 MT
09.00 hrs Cast Off Fr Jetty BL 1 to muara kaman
17.30 hrs Proses putar tongkang di km28
17.45 hrs Clear tambat di km28
17.50 hrs FWE
22 Dec 2023 05.00 hrs SBE
05.20 hrs Lepas dari tambatan km28
07.00 hrs Passing km19, ETA muara kaman 22/12/23 09.00 Lt
09.00 hrs Bebas alur kedang kepala
10.40 hrs passing muara Kaman
23 Dec 2023 00.40 hrs Arrival at harapan baru
00.50 hrs Clear tambat di fery2
01.00 hrs FWE
06.45 hrs Standby Chanel 11 menunggu pengolongan siang (at Tambatan Harapan Baru)
12.30 hrs Sbe persiapan
12.40 hrs Lepas tambat Fery" Hb Ikut barisan
13.10 hrs Ngolong jemb.Mahakam
15.15 hrs Ngolong jemb Mahkota ll conticue to Sei Maryam P.Buaya
18.00 hrs Arrival Sei maryam
18.20 hrs Clear Tambat P.Buaya conti to Beaching kpl Cancel back to Barge
18.00 hrs Fwe
24 Dec 2023 03.45 hrs Sbe
04.10 hrs Beachiing Atas Alim Sei Maryam
04.15 hrs Fwe
07.00 hrs Standby waiting Air Surut untuk kerja Propeler (at Sei Maryam)
08.00 hrs Mulai pekerjaan baling2 dan kemudi
14.00 hrs Selesai pekerjaan baling2
14.05 hrs SBE
14.10 hrs Lepas dari beajing, continue sea trial
16.30 hrs Tambat di tongkang
16.35 hrs FWE
25 Dec 2023 07.00 hrs Standby waiting info vessel, Eta Vessel 28/12/23 (at Tambatan Pulau Buaya)
15.20 hrs SBE
17.05 hrs Tiba dikutai lama/tempat bunker FW
17.10 hrs FEW
17.15 hrs Start bunker FW
21.00 hrs Finsish bunker FW 60.000 ltr
21.05 hrs SBE
22.30 hrs Tiba di tongkang/tambatan p buaya
22.35 hrs FEW
26 Dec 2023 07.00 hrs Standby waiting info vessel, Eta Vessel 28/12/23 (at Tambatan Pulau Buaya
27 Dec 2023 07.00 hrs Standby waiting info vessel, Eta Vessel 29/23 (at Tambatan Pulau Buaya
28 Dec 2023 07.00 hrs Standby waiting info vessel, Eta Vessel 30/12/23 (at Tambatan Pulau Buaya)
29 Dec 2023 07.00 hrs Standby waiting info vessel, Eta Vessel 30/12/23 (at Tambatan Pulau Buaya)
21.00 hrs Sbe persiapan
21.30 hrs Lepas tambat fr p.buaya Conti to M.Berau, Eta Muara Berau 31/12/23 07.00 LT
30 Dec 2023 07.00 hrs Passing buoy 5, Eta Muara Berau 31/12/23 07.00 LT
31 Dec 2023 07.00 hrs Arrival Muara Berau, Cont Process Anchorage (at Muara Berau)
08.20 hrs Clear Drop anchor
08.30 hrs Fwe
13.10 hrs Sbe persiapan
13.20 hrs Proses hibob Jangkar
13.50 hrs Jangkar Up
15.30 hrs In Possy MV.Unitama Lily
15.40 hrs Fwe
1 Jan 2024 02.00 hrs Start discharging
06.50 hrs Muatan yg terbongkar 5% (at Muara Berau)
08.00 hrs Sbe Assist Syukur 51
08.20 hrs Clear Assist Syukur
08.25 hrs Back to BG.PB 3028/Fwe
16.00 hrs Finish Bongkar
16.10 hrs Sbe Connect 2nd toing
16.30 hrs Cast Off fr MV.Unitama Lily M.berau to Pulau Buaya, Eta Pulau Buaya 02/01/24 05.00 LT
2 Jan 2024 04.00 hrs Arrival Sei Mariam
04.20 hrs Clear Tambat P.Buaya
04.30 hrs Fwe
07.00 hrs Standby waiting info pengolongan dibuka (at Tambatan Pulau Buaya)
14.50 hrs Sbe hibob Jangkar
15.20 hrs Jangkar up Conti fr sumber mas to jemb.Mahkota ll
19.30 hrs Ngolong Jemb Mahakam
20.40 hrs Ngolong Jemb Mahulu, Eta Muara Kaman 03/01/24 19.30 LT
3 Jan 2024 07.00 hrs Passing kitadin, eta Muara Kaman 03/01/24 17.00 LT
19.30 hrs Arrival M.Kaman
20.00 hrs Clear tambatan Fortune M.Kaman
20.10 hrs Fwe
4 Jan 2024 07.00 hrs standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
08.30 hrs Sbe Lepas tambat
08.50 hrs Lepas tambatan Fortune M.Kaman conti
10.45 hrs Masuk Alur Kedang kepala to Senyiur, Eta Senyiur 05/01/24 12.30 LT
15.00 hrs Tali 2nd toing Putus tikungan km.21
16.20 hrs Tambat Km.23
17.45 hrs Fwe
18.00 hrs Clear sambung tali 2nd toing conti to Senyiur
18.30 hrs Sbe persiapan
18.40 hrs Lepas tambat Km.23 conti
19.20 hrs Mendapat Info Dr pos 2 unk Tambat,Pandu ijay yg bawa Sanle 29,istri nya keguguran
20.40 hrs Clear Tambat Km.28
20.50 hrs Fwe
5 Jan 2024 07.00 hrs Standby waiting Pandu pengganti (at Tambatan KM 28)
23.20 hrs Sbe lepas tambat
23.40 hrs Putar BG.PB 3028 conti to Jetty
6 Jan 2024 00.30 hrs Clear gantung Bawah Jetty BL 3
00.40 hrs Fwe
03.30 hrs Sbe lepas tambat
04.30 hrs In possy Jetty BL 3
04.35 hrs Fwe
07.00 hrs Standby waiting info Loading (at Jetty BL 3, Senyiur)
20.50 hrs Star Loading
23.40 hrs Finish Loading, Total Cargo 7.500 MT
7 Jan 2024 00.00 hrs Sbe Menghindar BL 1,2 lepas dr Jetty
00.20 hrs Connect 2nd toing
00.25 hrs Cast off fr Jetty Bayan BL 3 senyiur to Muara Kaman, Eta Muara Kaman 07/01/24 10.30 Lt
05.20 hrs Proses putar tongkang km64
05.25 hrs Clear tambat KM64
05.30 hrs FWE
07.00 hrs SBE
07.05 hrs Cast off dari tambatan km64, Eta Muara Kaman 07/01/24 13.00 Lt
15.30 hrs Bebas alur Kedang Kepala
16.10 hrs Passing Muara Kaman, Eta Harapan baru 08/01/24 05.30 Lt
8 Jan 2024 01.25 hrs Ngolong Jemb Tenggarong
04.20 hrs Ngolong Jemb Mahulu
05.00 hrs Arrival Harapan Baru
05.20 hrs Clear Tambat di Fery" Harapan Baru
05.30 hrs Fwe
07.00 hrs Standby waiting info Pengolongan Jemb Mahakam dibuka (at Tambatan Harapan Baru)
12.30 hrs Sbe Persiapan
12.40 hrs Lepas tambat fery" Harapan Baru
14.30 hrs Ngolong Mahakam
15.05 hrs Dokumen On Board
15.10 hrs Penjaga BG.PB On barge
15.35 hrs Ngolong Mahkota ll conti to Muara Jawa, Eta Muara Jawa 09/11/24 13.00 Lt
9 Jan 2024 07.00 hrs Passing Mengarah, Eta Muara Jawa 09/11/24 13.00 Lt
10.40 hrs Arrival At M.Jawa
11.00 hrs Clear Drop jangkar
11.10 hrs Fwe
10 Jan 2024 07.00 hrs Standby waiting info disch (at Anchorage Muara Jawa)
18.00 hrs Sbe persiapan Hibob jangkar
19.20 hrs jangkar Up conti to MV.Mubasyir
21.50 hrs Arrival Mv.Mubasyir
22.15 hrs In Possy MV.Mubasyir M.jawa
22.20 hrs Fwe
22.25 hrs Start Disch cargo
11 Jan 2024 07.00 hrs Disch Progress 10% (at Muara Jawa)
01.00 hrs Star Disch
19.55 hrs Finish Bongkar
08.40 hrs Sbe shifting BG
09.00 hrs Clear Shifting
09.10 hrs Gantung Burit MV.Mubasyir
19.55 hrs Finish Loading
20.00 hrs Sbe persiapan CV Connect 2nd toing
20.30 hrs Cast Off fr MV.mubasyir M.Jawa to Sei Mariam/P.Buaya, Eta Sei Mariam 12/01/24 12.00 LT
12 Jan 2024 07.00 hrs Passing Astina, Eta Pulau Buaya 12/01/24 09.00 Lt
08.50 hrs Arrival Sei Mariam
09.20 hrs Clear tambat P.buaya
09.30 hrs Fwe
09.40 hrs Proses ganti 2nd toing
15.00 hrs Sbe persiapan
15.10 hrs Lepas tambat P.Buaya to Mahkota ll
17.40 hrs Ngolong Jemb Mahkota ll
18.50 hrs Ngolong Jemb Mahakam
19.15 hrs Dokumen Out board fr Harapan Baru
13 Jan 2024 07.00 hrs Passing Jetty kabama Sirbaya, Eta Muara Kaman 13/01/24 17.30 Lt
18.30 hrs Arrival At Muara Kaman
19.00 hrs Clear tambatan Fortune
19.10 hrs Fwe
14 Jan 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
09.00 hrs Sbe persiapan
09.10 hrs Lepas tambatan Fortune M Kaman conti
10.30 hrs Masuk alur Kedang kepala to Senyiur, Eta Senyiur 15/01/24 10.00 LT
15 Jan 2024 07.00 hrs Passing KM 80, Eta Senyiur 15/01/24 10.00 LT
00.55 hrs Arrival km.99
01.40 hrs Putar BG.PB 3028
02.10 hrs clear tambatan km.101
02.20 hrs Fwe
15.20 hrs Persiapan lepas tambat Km.101
15.50 hrs Clear tambat bwh BL 3
16.00 hrs Fwe
20.50 hrs Sbe persiapan
21.00 hrs lepas bawah BL 3
21.25 hrs In Possy BL 3
21.30 hrs Fwe
21.35 hrs Star Loading
16 Jan 2024 02.25 hrs Finish Loading, Total Cargo 7.500 MT
02.40 hrs Sbe persiapan
02.55 hrs Cast Off fr BL 3 Jetty Bayan to Muara kaman, Eta Muara Kaman 16/01/24 17.30 LT
07.00 hrs Sailing Load to Muara Kaman, Eta Muara Kaman 16/01/24 17.30 LT
16.45 hrs Bebas alur Kedang kepala
17.20 hrs Passing Muara Kaman conti to Harapan Baru, Eta Harapan Baru 17/01/24 05.10 LT
17 Jan 2024 02.00 hrs Ngolong Jemb Tenggarong
05.30 hrs Ngolong Jemb Mahulu
06.00 hrs Arrival Harapan Baru
06.10 hrs Putar BG.PB.3028 Ngapung2 ikut antrian pengolongan Jemb Mahakam (at Harapan Baru)
09.00 hrs Ngolong jembt Mahakam
10.22 hrs Ngolong jemb mahkota ll
10.40 hrs Dokumen OB Lanjut to Muara Jawa, Eta Muara Jawa 18/01/24 11.00 LT
18 Jan 2024 05.40 hrs Arrival M.Jawa
05.50 hrs Clear Drop anchor
06.10 hrs Fwe (at Anchorage Muara Jawa)
15.00 hrs Sbe persiapan
15.15 hrs Proses hibob Jangkar
15.55 hrs Jangkar up conti to MV.Maria Naswah
17.05 hrs Dokumen Out to Agen Samboja
18.50 hrs In Possy At FC.Dong Jie/MV.Maria Naswah
18.55 hrs Star Disch
19.00 hrs Fwe
19 Jan 2024 07.00 hrs Disch Progress 85% (at Muara Jawa)
09.20 hrs Finish Bongkar
09.30 hrs Sbe connect 2nd toing
09.40 hrs Cast off fr FC.Dong Jia conti to P.Buaya, Eta p.buaya 19/01/24 22.00 LT
21.30 hrs Arrival Sei Mariam
22.00 hrs Conti to balik Buaya
22.20 hrs Clear tambatan P.buaya
22.30 hrs Fwe
20 Jan 2024 00.00 hrs Persiapan banker di SPOB Pandawa 01
00.50 hrs Start banker
02.15 hrs Finish bunker 15 KL
06.00 hrs Sbe lepas tambat to Kutai Lama bunker fw
07.00 hrs Arrival Kutai Lama
07.05 hrs Fwe, Standby waiting info Pengolongan (at Kutai Lama)
15:00 hrs Over Towing PB 3016 to PB 3028
15:15 hrs Sbe Prepare Ngolong
15:30 hrs Lepas tambatan Pulau buaya
17:55 hrs Ngolong Mahkota II
19:25 hrs Ngolong Mahakam
19:45 hrs Doc Turun di Harapan Baru Continue Sail to Muara Kaman, Eta Muara kaman 21/01/024 19.30 LT
21 Jan 2024 07.00 hrs Passing kp Separi, Eta Muara kaman 21/01/024 19.30 LT
19:20 hrs Arrival Muara Kaman, Continue tambat Di Fortune
19:35 hrs Clear tambat di Fortune Kaman
19:40 hrs Fwe
22 Jan 2024 07.00 hrs Standby waiting info Pos 1 to Semyiur (at Tambatan Fortune)
10:15 hrs Sbe Prepare
10:30 hrs Lepas tambatan Fortune Kaman
11:45 hrs Arrival Kedang kepala
12:05 hrs Pandu On board
12:20 hrs Masuk alur Senyiur, Eta Senyiur 23/01/24 12.20
23 Jan 2024 4:10 hrs Arrival KM 99
4:25 hrs Clear Tambat KM 99
4:30 hrs Fwe
7:00 hrs Standby waiting info loading (at Tambatan KM 99)
7:15 hrs Sbe Prepare
7:25 hrs Lepas Tambat KM 99, Bergerak Ke area Jetty
8:20 hrs Selesai tambat Di Ujung BL 01
8:30 hrs Fwe
12:45 hrs Sbe prepare Sandar
13:35 hrs In position BL 01
13:40 hrs Fwe
13:55 hrs Comence Loading Cargo
15:45 hrs Sbe prepare Cast off
15:50 hrs Finish Loading Cargo, Total Cargo 5.896 MT
16:00 hrs Cast Off BL 01/Continue turun Muara Kaman, Eta Muara Kaman 24/01/24 08.00 LT
24 Jan 2024 7:00 hrs Passing KM 9, Eta Muara Kaman 24/01/24 08.00 LT
8:40 hrs Bebas Alur kedang kepala
9:10 hrs Arrival CTB Ma.Kaman
9:30 hrs Clear tambat Bawah CTB 01
9:35 hrs Fwe
25 Jan 2024 7:00 hrs Standby waiting info penambahan cargo (at Tambatan Fortune)
07.35 hrs Sbe prepare Sandar CTB 01
07.35 hrs Lepas tambat
08.05 hrs Inpost Jetty BL 01, Langsung Muat
08.10 hrs Fwe
09.45 hrs Sbe Prepare Cast Off
09.50 hrs Komplit Loading Penambahan, Total Cargo 7.500 MT
10:00 hrs Cast Off jetty BL 01/Lanjut turun Harapan baru, Eta Harapan Baru 26/01/24 02.30 LT
26 Jan 2024 01.00 hrs Arrival Harapan Baru
01.25 hrs Clear Tambat
01.30 hrs Fwe
06.30 hrs Standby waiting antrian Pengolongan Jemb Mahakam
07.30 hrs Sbe Prepare Ngolong
07.45 hrs Lepas Tambat Patung HB
09.20 hrs Ngolong Mahakam
10.20 hrs Ngolong Mahulu/Lanjut turun Muara jawa, Eta muara Jawa 28/01/2411.00 LT
27 Jan 2024 03.30 hrs Arrival Muara Jawa
03.50 hrs Clear Drop Anchorage
04.00 hrs Fwe
07.00 hrs Standby waiting info disch (at Muara Jawa)
28 Jan 2024 07.00 hrs Standby waiting info disch (at Muara Jawa)
12.00 hrs Sbe Hibob Jangkar/Prepare Sandar
12.20 hrs Jangkar Up Continue To MV.MUNQIDZ
14.30 hrs Tiba di Buritan MV.MUNQIDZ
16.00 hrs Gantung Di Burit MV. MUNQIDZ
17.00 hrs lepas Tali dari MV.MUNQIDZ
18.20 hrs Inpost MV.MUNQIDZ/FC.CALYPSO Langsung Bongkar
18.30 hrs Fwe
29 Jan 2024 07.00 hrs Disch progress 50% (at Muara Jawa)
12.25 hrs Sbe Prepare Cast Off
12.30 hrs Komplit Discharge
12.50 hrs Cast Off MV.MUNQIDZ
13.30 hrs Full Away to Samarinda, Eta Pulau Buaya 30/01/24 02.30
30 Jan 2024 02.00 hrs Arrival Pulau buaya
02.05 hrs Bergerak ke Area TPK palaran
02.35 hrs Tiba TPK Palaran
02.55 hrs Selesai berlabuh Jangkar
03.00 hrs Fwe
07.00 hrs Standby waiting pengolongan naik dibuka (at Anchorage TPK Palaran)
11.30 hrs Sbe Hibob Jangkar
11.45 hrs Jangkar up
13.05 hrs Ngolong Mahkota II
15.00 hrs Ngolong Mahakam
15.30 hrs Doc Diturunkan di Harapan Baru , Lanjut Naik Muara Kaman
16.15 hrs Ngolong Mahulu
21.50 hrs Ngolong Tenggarong
31 Jan 2024 07.00 hrs Passing Kmpung BLORO, Eta Muara Kaman 31/01/24 15:30 LT
14.30 hrs Tiba M.Kaman/Nunggu Pandu
15.00 hrs Pandu Senyiur Naik
15.45 hrs Masuk Alur Kedang Kepala, Eta Senyiur 01/02/24 15.00 LT
1 Feb 2024 07.00 hrs Sailing empty to Senyiur, Eta Senyiur 01/02/24 15.00 LT
08.15 hrs Tiba KM 100/Putar Tongkang
08.45 hrs Selesai Tambat Di Bawah BL 03
08.50 hrs Fwe
10.15 hrs Sbe Prepare Sandar
10.50 hrs In position BL 02
10.55 hrs Fwe/Langsung Loading
12.30 hrs Sbe Prepare Cast Off
12.40 hrs Komplit Loading, Total Cargo 4.308 MT
12.50 hrs Cast Off BL 02
17.35 hrs Arrival KM 70
17.50 hrs Selesai Tambat di KM 70
18.00 hrs Bergerak Naik KM 99 (bantu PB 3016)
21.10 hrs Arrival KM 99/BG PB 3016
21.25 hrs Selesai Putar Tongkang
22.35 hrs In position BL 02
22.40 hrs Fwe/Comence Loading
23.40 hrs Sbe Prepare Cast Off
23.50 hrs Finish Loading, Total Cargo 4.294 MT
23.55 hrs Cast Off BL 03
2 Feb 2024 05.00 hrs Arrival KM 70
07.00 hrs Sailing Load to Muara Kaman, Eta Muara Kaman 02/02/24 16.00 LT
07.05 hrs Tiba di KM 70 BG PB 3028
07.30 hrs Lepas Tambat KM 70, Lanjut trun Muara Kaman
16.55 hrs Bebas Alur kedang kepala
17.15 hrs Selesai tambat di Bukit jering/Atas CTB 02
17.20 hrs Fwe
21.00 hrs Sbe Prepare Sandar
21.15 hrs Lepas Tambat/Lanjut CTB 01
22.45 hrs Tiba di CTB 01
23.00 hrs In post CTB 01
23.05 hrs Comence Loading Penambahan
23.10 hrs Fwe
3 Feb 2024 02.50 hrs SBe prepare Cast Off
03.00 hrs Completed Loading, Total Cargo 7.500 MT
03.15 hrs Cast Off CTB 01/Lanjut turun Harapan Baru
07.00 hrs Passing Kmpung Selerong, Eta Harapan Baru 19.00 LT
14.20 hrs Ngolong Tenggarong
17.45 hrs Ngolong Mahulu
18.30 hrs Arrival Harapan Baru
18.45 hrs Selesai tambat
18.55 hrs Fwe
4 Feb 2024 07.00 hrs Proses pengolongan Jemb Mahakam
07.30 hrs SBe Prepare Ngolong
07.45 hrs Lepas Tambatan
09.10 hrs Ngolong Mahakam
10.25 hrs Ngolong Mahkota II Lanjut turun Muara Jawa, Eta muara Jawa 05/02/24 09.00 LT
5 Feb 2024 04.00 hrs Arrival Muara Jawa
04.20 hrs Clear Drop Anchor
04.30 hrs Fwe
07.00 hrs Standby waiting info disch (at Anchorage Muara Jawa)
16.00 hrs Sbe Hibob Jangkar
16.30 hrs Jangkar UP Bergerak Sandar
18.15 hrs In Post MV.GUNALEILA
18.30 hrs Fwe
6 Feb 2024 07.00 hrs Standby waiting info disch (at Muara Jawa)
14.00 hrs Document On Board
21.00 hrs Komplit Discharge
21.15 hrs Sbe Prepare Cast Off
21.30 hrs Cast Off MV.GUNALEILA
22.00 hrs Full Away To P.Buaya
7 Feb 2024 07.00 hrs Passing Tg Dewa, Eta Pulau buaya 07/02/24 11.00 LT
10.30 hrs Arrival Pulau Buaya
10.45 hrs Clear tambat/Lanjut Gerak isi FW di Kutai Lama
11.50 hrs Fwe/Tiba di Kutai Lama
16.40 hrs Star isi F.Water
20.00 hrs Selesai Isi FW 60 Ton
20.10 hrs Sbe Kembali ke Tongkang
21.20 hrs Fwe/Tiba di P.Buaya
23.00 hrs Start Bunker HSD
8 Feb 2024 02.00 hrs Finish Bunker HSD 45.000 Ltr
07.00 hrs Proses antrian Pengolongan Jembt Mahkota Dua
06.00 hrs Sbe Prepare Lepas Tambat
08.00 hrs Barge PB 3028 Lepas tambat
09.00 hrs Selesai berlabuh di TPK Palaran/tdk smpat Ngolong
09.10 hrs Fwe, Nunggu MAHKOTA buka
16.05 hrs Sbe Hibob Jangkar
16.30 hrs Jangkar Up Antri Ngolong
18.40 hrs Ngolong Mahkota II
19.55 hrs Ngolong Mahakam
20.10 hrs Doc Diturunkan di HB Lanjut naik Muara Kaman, Eta Muara Kaman 09/02/24 20.00 LT
9 Feb 2024 01.50 hrs Ngolong Tenggarong
07.00 hrs passing Kp Kitadin, Eta Muara Kaman 09/02/24 20.00 LT
18.30 hrs Arrival Muara Kaman
18.45 hrs Clear Tambat MKP Fortune
18.50 hrs Fwe
10 Feb 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
10.00 hrs Sbe Prepare Lepas tambat
10.15 hrs Lepas Tambat Fortune
11.30 hrs Tiba Kedang Kepala
12.00 hrs Masuk Alur kedang Kepala, Eta Senyiur 11/02/24 12.00 LT
11 Feb 2024 07.00 hrs Sailing empty to Senyiur, Eta Senyiur 11/02/24 11.00 LT
10.05 hrs Arrival KM 99/Putar Barge
10.20 hrs Selesai putar tongkang
10.50 hrs Tiba Area Jetty
11.05 hrs Clear tambat Atas BL 01
11.10 hrs Fwe
14.00 hrs Sbe Prepare Sandar
14.45 hrs In position BL 02
14.55 hrs Comance Loading Cargo
15.00 hrs Fwe
17.00 hrs Sbe Prepare Cast Off
17.15 hrs Complete Loading, Total Cargo 7.500 MT
17.20 hrs Cast Off BL 02/lnjut Turun Muara Kaman, Eta Muara Kaman 12/02/24 09.00 LT
12 Feb 2024 07.00 hrs Passing KM 10, Eta Muara Kaman 12/02/24 09.00 LT
08.10 hrs Bebas Alur Kedang Kepala
08.40 hrs Arrival Muara Kaman/Lanjut turun Harapan Baru
18.50 hrs Ngolong Tenggarong
22.35 hrs Ngolong Mahulu
23.20 hrs Arrival Harapan Baru
23.35 hrs Clear Tambat
23.40 hrs Fwe
13 Feb 2024 07.00 hrs Standby waiting antrian Pengolongan Jembt Mahakam
07.00 hrs Document On board
08.00 hrs Sbe Prepare Ngolong
08.15 hrs Keluar Tambatan HB
09.30 hrs Ngolong Mahakam
10.50 hrs Ngolong Mahkota II
13.00 hrs Arrival Pulau Buaya
13.20 hrs Clear Tambat P.Buaya
13.30 hrs Fwe
14 Feb 2024 07.00 hrs Standby waiting info vessel, Est 15/02/24 (at Tambatan Pulau Buaya)
15 Feb 2024 07.00 hrs Standby waiting info vessel, Est 20/02/24 (at Tambatan Pulau Buaya)
16 Feb 2024 07.00 hrs Standby waiting info vessel, Est 20/02/24 (at Tambatan Pulau Buaya)
17 Feb 2024 07.00 hrs Standby waiting info vessel, Est 18/02/24 (at Tambatan Pulau Buaya)
12.00 hrs Sbe Lepas Tambat
12.15 hrs Lepas tambat P.Buaya
12.30 hrs Sail to Muara Jawa, Eta Muara Jawa 18/02/24 08.00 LT
18 Feb 2024 04.00 hrs Arrival Muara Jawa
04.15 hrs Clear Drop Anchor
04.20 hrs Fwe
07.00 hrs Standby waiting info disch (at Anchorage Muara Jawa)
19 Feb 2024 07.00 hrs Standby waiting info disch (at Anchorage Muara Jawa)
20 Feb 2024 07.00 hrs Proses hibob jangkar to alongside vessel
07.20 hrs Sbe hibob Jangkar
07.45 hrs Jangkar Up
09.20 hrs Tiba di Buritan MV.RAFA
09.40 hrs In position MV.RAFA
09.50 hrs Fwe
22.00 hrs Commence Discharge Cargo
21 Feb 2024 07.00 hrs Disch progress 60% (at Muara Jawa)
13.30 hrs Komplit Bongkar
13.55 hrs Sbe Prepare Cast Off
14.10 hrs Cast Off MV.RAFA
15.20 hrs Selesai Berlabuh
15.30 hrs Fwe
16.55 hrs Document On board
17.00 hrs Sbe Hibob jangkar
17.20 hrs Jangkar up
17.25 hrs Full away Pulau buaya, Eta Pulau Buaya 22/02/24 06.30 LT
22 Feb 2024 05.30 hrs Arrival Pulau Buaya
05.35 hrs Lanjut ke TPK Palaran
06.25 hrs Clear Drop Anchor dpn TPK Palaran
06.30 hrs Fwe, standby waiting info pengolongan dibuka
23 Feb 2024 07.00 hrs standby waiting info pengolongan dibuka
09.45 hrs Document Turun di Pulau atas
16.45 hrs Sbe Hibob Jangkar
17.00 hrs Jangkar Up ikut Ngolong
18.25 hrs Ngolong Mahkota II
19.30 hrs Ngolong Mahakam/Lanjut Muara Kaman
20.25 hrs Ngolong Mahulu
24.00 hrs Ngolong Tenggarong, Eta Muara Kaman 24/02/24 18.00 LT
24 Feb 2024 07.00 hrs Passing Kp Segihan, Eta Muara Kaman 24/02/24 18.00 LT
16>00 hrs Arrival Muara Kaman
16.15 hrs Clear Tambat MKP Fortune
16.20 hrs Fwe
25 Feb 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
26 Feb 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
27 Feb 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
28 Feb 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
29 Feb 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
1 Mar 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
2 Mar 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
3 Mar 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
4 Mar 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
5 Mar 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
6 Mar 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
7 Mar 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
8 Mar 2024 07.00 hrs Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
16.00 hrs Sbe Prepare Sandar CTB
16.15 hrs Lepas tambat Fortune
17.05 hrs Arrival CTB 02
17.25 hrs In position CTB 02
17.30 hrs Fwe
19.35 hrs Comence Loading
9 Mar 2024 04.50 hrs Sbe prepare Cast Off
04.55 hrs Komplit Loading Cargo, Total Cargo 7.500 MT
05.05 hrs Cast Off CTB 02 lanjut Turun Harapan Baru, Eta Harapan Baru 09/03/24 20.30 LT
16.40 hrs Ngolong Tenggarong
20.45 hrs Ngolong Mahulu
21.15 hrs Arrival Harapan Baru
21.30 hrs Clear Tambat
21.35 hrs Fwe
10 Mar 2024 06.30 hrs prepare pengolongan Jemb Mahakam
06.45 hrs Lepas tambatan HB
07.30 hrs Ngolong Mahakam
08.55 hrs Ngolong Mahkota II
09.00 hrs Sail turun Muara Jawa, Eta Muara Jawa 11/03/24 07.00 LT
11 Mar 2024 08.00 hrs Arrival Muara Jawa
08.10 hrs Bergerak Sandar ke MV.LGH Prosper
09.30 hrs Tiba Di Vessel/Proses Alongside
10.10 hrs Inpost MV.LGH Prosper Langsung Bongkar
10.20 hrs Fwe
20.25 hrs Komplit Bongkar
12 Mar 2024 07.00 hrs Standby waiting doc (at Muara Jawa)
07.15 hrs Document OB
07.20 hrs Sbe Prepare cast Off
07.40 hrs Cast Off MV.LGH Prosper
07.55 hrs Full away To Pulau Buaya
19.40 hrs Tiba di Pulau Buaya
20.00 hrs Selesai Tambat Tongkang Lanjut Ke Kutai Lama
20.55 hrs Tiba di Kutai Lama/Fwe
23.00 hrs start isi FW
13 Mar 2024 03.00 hrs Finish isi FW
07.00 hrs Standby waiting info pengolongan dibuka (at Pulau Buaya)
16.00 hrs Sbe Prepare Ngolong
16.30 hrs Cast Off tambatan p.Buaya
18.30 hrs Ngolong Mahkota II
19.30 hrs Ngolong Mahakam
19.45 hrs Document Out Board, Continue to Rembayan
20.25 hrs Ngolong Mahulu
23.55 hrs Ngolong Tenggarong
14 Mar 2024 06.30 hrs Post Kampung Sebulu, Eta Rembayan 16/03/24 06.30 LT
15 Mar 2024 07.00 hrs Passing Muara Muntai, Eta Rembayan 16/03/24 06.30 LT
16 Mar 2024 02.45 hrs Arrival Rembayan
03.00 hrs Clear Tambat Area Jetty MBL
03..05 hrs Fwe
07.00 hrs Standby waiting info Loading (at Tambatan Jetty MBL)
17 Mar 2024 07.00 hrs Standby waiting info Loading (at Tambatan Jetty MBL)
18 Mar 2024 07.00 hrs Standby waiting info Loading (at Tambatan Jetty MBL)
21.50 hrs Sbe Persiapan Sandar
22.50 hrs In position Jetty MBL
22.55 hrs Comence Loading Cargo
23.05 hrs Fwe
19 Mar 2024 07.00 hrs Loading Progress 50% (at Jetty MBL)
12.05 hrs Komplit Loading, Total Cargo 7.487.120 MT
12.15 hrs Final Draft
12.20 hrs Sbe Prepare Cast Off
12.45 hrs Cast Off jetty MBL, Continue Sail to Harapan Baru, Eta Harapan Baru 21/03/24 08.00 LT
21.30 hrs Insident Nabrak Keramba Warga
22.30 hrs Clear Tambat Di Seberang Desa Batuq
22.35 hrs Fwe
20 Mar 2024 08.00 hrs Tambat Di seberang kmpung Desa Batuq Nunggu Info
14.00 hrs Sbe Prepare Lepas Tambat
14.15 hrs Lepas Tambat Desa Batuq
14.30 hrs Sail to Harapan Baru
21 Mar 2024 06.00 hrs Passing Desa Separi, Eta HB 21/03/24 14.00 LT
13.00 hrs Arrival Mahulu
13.10 hrs Selesai Putar Tongkang lnjut Apung
15.05 hrs Ngolong Mahulu
16.30 hrs Ngolong Mahakam
18.50 hrs Ngolong Mahkota II
19.00 hrs Sail to Muara Berau
22 Mar 2024 07.00 hrs Passing Buoy 06 Muara Pegah, Eta Muara Berau 23/03/24 06.00 LT
23 Mar 2024 07.00 hrs Perairan Muara Berau, Eta OB Muara Berau 23/03/24 09.00 LT
09.00 hrs Arrival OB.Muara Berau
09.20 hrs Selesai Pendekan Tali
11.30 hrs Tiba Di Buritan Vessel
12.00 hrs Inpost MV.African Leopard
12.10 hrs Fwe
12.20 hrs Comence Discharge
15.00 hrs Sbe Assist MHKL 202 sandar
15.25 hrs Fwe/Selesai Assist
21.30 hrs Komplit Discharge
21.45 hrs Sbe Prepare Cast Off
22.00 hrs Cast Off MV.African Leopard
23.05 hrs Selesai Berlabuh jangkar
23.10 hrs Fwe
24 Mar 2024 02.30 hrs Sbe Hibob Jangkar
02.55 hrs Jangkar Up
03.00 hrs Sail to Pulau Buaya
07.00 hrs Passing PERTAMINA Hulu, Eta Pulau Buaya 24/03/24 15.00 LT
11.30 hrs Arrival Pulau Buaya
11.45 hrs Clear Tambat Tongkang
11.50 hrs Fwe, Start Bunker HSD
13.05 hrs Finish Bunker HSD 47.000 Ltr
15.30 hrs Sbe Prepare Lepas tambat
16.00 hrs Tongkang msh Kandas (Air surut)
16.10 hrs Fwe
25 Mar 2024 07.00 hrs Prepare Pengolongan Jembt
07.30 hrs Sbe Prepare Ngolon
07.45 hrs Lepas tambat P.Buaya
10.55 hrs Ngolong Mahkota II
13.40 hrs Ngolong Mahakam
14.40 hrs Tiba Loa buah
14.55 hrs Clear Tambat di Arrayan
15.00 hrs Fwe
26 Mar 2024 01.00 hrs Sbe Lepas Tambat
01.15 hrs Lepas Tambat Arrayan
01.30 hrs Ngolong Mahulu, Lanjut naik Muara Kaman
07.00 hrs Passing Tenggarong, Eta Muara Kaman 26/03/24 23.30 LT
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
HSD
33,070
18,220
3,380
48,260
TIME SHEET
NAMA KAPAL : TB. SANLE 25 / PB 3037
DESCRIPTION
10,425
5,595
2,697
52,697
48,905
33,910
18,905
alangan PSB)
TIME SHEET
NAMA KAPAL : TB. SB 10 / HH 3003
DESCRIPTION HSD
DESCRIPTION
WGM 202 Waiting Bunker HSD (at Galangan Syukur, Samarinda), PB 3016 Repair (at Dock Orella, Samarinda)
WGM 202 Waiting Bunker HSD (at Galangan Syukur, Samarinda), PB 3016 Repair (at Dock Orella, Samarinda)
WGM 202 Waiting Bunker HSD (at Galangan Syukur, Samarinda), PB 3016 Repair (at Dock Orella, Samarinda)
Start bunker HSD
Finish Bunker HSD 47 KL
WGM 202 Standby waiting finish Repair PB 3016 (at Dock Orella, Samarinda)
Finish pekerjaan PB 3016 di dock orella, tunggu air pasang untuk bergerak keluar galangan
Star M/e persiapan tarik Bg. PB. 3016 dr galangan Eka Multi
Bg. PB. 3016 bebas dr galangan Eka Multi / continue galangan Golden
selesai sandar di galangan Golden / stop M/e.
Sbe prepare cast off jetty meteor
Lepas jetty meteor Continue ikut pengolongan naik
Pengolongan j.mahkota II
Pandu MAHAKAM naik
pengolongan jembatan Mahakam, Eta Muara kaman 06/07/23 14.00 Lt
Passing Sebulu, Eta Muara kaman 06/07/23 14.00 Lt
Tiba Muara Kaman
Assist berkat 01 konek di BG PB 3016
Selesai survey jetty bayan
Tiba muara kedang kepala
Pandu sinyiur OB, Eta Senyiur 07/07/23 15.00 Lt
0° 4' 8.46" N 116° 42' 3.6" E, eta senyiur 07/07/23 15.00 LT
tiba di KM 99
selesai lipat BG.PB 3016 next gerak ke jetty bayan
Tiba jetty bayan
Inpost BL 03 bayan
Fwe
Star loading BG PB.3016
Complete loading BG PB. 3016 Cargo 7.500 mt
Sbe prepare cast off
Cast off jetty BL 03 bayan, Eta muara kaman 08/07/23 09.00 LT
0° 3' 24.06" S 116° 40' 37.74" E, Eta muara kaman 08/07/23 09.00 LT
bebas alur muara kedang kepala
Passing muara kaman,10/07/23 01.00 Lt
Pengolongan Kutai
pengolongan Mahulu
tiba harapan baru
clear tambat Fery"
Fwe
Lepas tambat
Ngolong MAHAKAM
Ngolong Mahkota II, Lanjut turun Muara berau, Eta muara berau 10/07/23 20.30
passing muara bayur, Eta muara berau 10/07/23 20.30
Arrival muara berau
Drop achor
Fwe
Standby waiting info disch (at Muara Berau)
Standby waiting info disch (at Muara Berau)
Sbe hibob jangkar
jangkar up,Bergerak ke Mv.Aurora Cristine
Assist TB.SANLE 29 konek di Bg.PB 3016
In possy at Mv.aurora Cristine
Assist TB Sanle 29 lepas dri Tongkang BG.PB 3016
Fwe
Star bongkar BG.PB 3016
Disch Progress 20% (at Muara Berau)
Sbe Assist Sanle 25
Selesai assist lnjut rapatkan BG PB 3016
Fwe
Selesai bongkar
Sbe prepare cast off
Cast off Mv.aurora christine, Eta pulau buaya 14/07/23 06.00 LT
Passing Pulau buaya, cont antrian pengolongan Jembt Mahkota Dua
ngolong Mahkota II
ngolong Mahakam
ngolong Mahulu
Ngolong Tenggarong Lanjut F.A muara kaman, Eta muara kaman 15/07/23 09.30 Lt
Passing Kp rantau empang, , Eta muara kaman 15/07/23 09.30 L
Arrival muara kaman
Selesai Survey Kapal&Tongkang
Selesai tambat di Fortune
Fwe
Sbe lepas tambat
lepas tambat dr fortun
proses masuk alur kedang kepala / continue senyiur, Eta senyiur 16/07/23 13.00 LT
Passing KM 90, Eta senyiur 16/07/23 13.00 LT
Arrival KM 99
Clear putar BG.PB 3106 Gerak mendekati jetty
Selesai tambat Di bwh jetty BL 03
Fwe
Sbe lepas tambat prepare Sandar
In position jetty BL 3
Fwe
Comence Loading PB.3016
Sbe prepare cast off
Completed Loading, Total Cargo 7.500 MT
Cast off jetty BL 3 Lanjut turun M.kaman, Eta muara kaman 17/07/23 06.30 LT
Passing KM 03, Eta muara kaman 17/07/23 08.00 LT
bebas alur kedang kepala/Continue sailing turun, Eta harapan baru 18/07/23 24.00 LT
Passing Muara kaman
Ngolong j.tenggarong
Ngolong j.Mahulu
Arrival harapan baru
Clear tambat di Fery"
Fwe
Antri Pengolongan Jembatan Mahakam (at Harapan Baru)
Ngolong j.Mahakam
Ngolong j.Mahkota II, Continue to muara berau Eta muara berau 19/07/23 17.45 Lt
Melintang Muara Bayur, Eta muara berau 19/07/23 17.45 Lt
Arrival M.Berau
Drop Anchor
Fwe
Standby waiting info disch (at Muara Berau)
Sbe Hibob jangkar
Jangkar Up Lanjut apung"(Angin kuat)
Bergerak Sandar di MV.Nur Awliya
Tiba di buritan MV.Mur awliya
In position(Comence Disharge PB 3016)
Fwe
Disch Progress 40% (at Muara Berau)
Sbe assist TB.Rupat 18
Fwe
Completed discharge
Sbe Prepare cast off
Cast off MV.Nur Awliya To Pulau buaya, Eta Pulau buaya 22/07/23 20.00 LT
Arrival p.buaya
Clear Tambat
Fwe
Sbe gerak ke kutai lama
tiba kutai lama
fwe
start isi air tawar
Proses pengisian air tawar dan Standby waiting antrian pengolongan, Pengolongan dibuka jam 11.00 LT (at Kutai Lama)
Sbe kembali ke TK
Tiba p.buaya lnjut cast off BG PB 3016
Cast off tambat p.buaya/Lnjut pengolongan naik
Ngolong Mahkota II
Ngolong Mahakam
Ngolong Mahulu, Eta muara kaman 24/07/23 17.00 LT
Passing Kp Teratak, Eta Muara kaman 24/07/23 17.00 LT
Arrival Muara Kaman/Continue Tambat PB 3016
Clear tambatan Fortune
Fwe
Standby waiting info Pos 1 untuk naik Senyiur (at tambatan Fortune)
Sbe persiapan
Cast off tambat fortune
Arrival kedang kepala
Proses Masuk alur kedang kepala, Eta Senyiur 26/07/23 14.30 LT
passing km 90, Eta senyiur 26/07/23 12.00 LT
Arrival KM 99
Clear tambat TK di KM 99
Fwe
Sbe Prepare cast off
Cast off tambatan KM 99
Gerak ke area jetty
Clear Ikat di atas BL 02
Fwe
Sbe prepare Sandar
In position BL 02
Fwe
Comence Loading PB 3016
Sbe prepare cast off
Finish Loading, Total Cargo 5.189 MT
Cast off BL 02/Continue to CTB Muara kaman, Eta muara kaman 27/07/23 08.30 LT
Posisi 0° 4' 52.38" S 116° 38' 58.86" E, Eta muara kaman 27/07/23 08.30 LT
Bebas Alur kedang kepala
Continue Tambatan
Clear tambat di atas CTB 01
Fwe
Sbe prepare Sandar CTB 1 Bayan
Bebas dr tambat/Continue Sandar Ke CTB 1
In position CTB 1
Start Loading (Penambahan)
Fwe
Completed Loading (Penambahan), Total Cargo 7.400 MT
Sbe prepare Cast off
Cast off CTB 1
Sail turun Harapan baru, Eta harapan baru 28/07/23 15.30 LT
Passing Kp Sebulu, Eta harapan baru 28/07/23 15.30 LT
Ngolong Tenggarong
Ngolong Mahulu
Tiba harapan baru
Clear Tambat fery"
Fwe
Stanby waiting info pengolongan jemb mahakam, Jembt dibuka 12.00 LT (at Harapan Baru)
Sbe prepare
Cast off tambat fery"/Continue antri ngolong
Ngolong Mahakam
Ngolong Mahkota II
Arrival p.buaya
Proses putar BG
Clear tambat p.buaya
Fwe
Standby waiting info Vessel Arrived, Est 01/08/23 (at Pulau Buaya)
Standby waiting info Vessel Arrived, Est 01/08/23 (at Pulau Buaya)
Sbe prepare Cast off
Cast off tambat p.buaya
Full away to muara.berau, Eta muara berau 01/08/23 18.30 LT
Melintang Tg. Bayur, Eta muara berau 01/08/23 18.30 LT
Arrival muara berau
Clear Drop anchor
Fwe
Sbe / angkat jangkar persiapan sandar
selesai angkat jangkar / continue kpl besar
Tiba di MV. MUNQIDZ
Selesai sandar di FC. CALIPSO / MV. MUNQIDZ
Mulai bongkar
Fwe
Completed Discharge
Sbe prepare Cast off
Cast off FC Calypso 01
Proses masuk alur berau/Sail to p.buaya, Eta Pulau Buaya 030823 08.00 LT
Tiba Sei meriam
Gerak ke tmpt tambat
Clear tambat di pulau buaya
Fwe
Start bunker HSD
Finish bunker HSD 45.000 Ltr
Sbe prepare cast
Cast off tambat/Continue pengolongan
Ngolong Mahkota II
Ngolong Mahakam, Eta muara kaman 04/08/23 20.00 Lt
Passing Sebulu, Eta muara kaman 04/08/23 20.00 Lt
Arrival muara kaman, Continue tambatan Fortune
Clear Tambat At Fortune
Fwe
Standby waiting info Pos 1 (at Muara Kaman)
Standby waiting info Pos 1 (at Muara Kaman)
Standby waiting info Pos 1 (at Muara Kaman)
Standby waiting info Pos 1 (at Muara Kaman)
Standby waiting info Pos 1 (at Muara Kaman)
Sbe prepare
Lepas tambatan Fortune
Arrival Kedang kepala
Masuk alur kedang Kepala/Continue Senyiur, Eta Senyiur 10/08/23 13.00 Lt
Posisi KM 80, Eta Senyiur 10/08/2023 13.00 Lt
Arrival at KM 99 /Continue tambat
Clear tambat KM 99
Fwe
Sbe persiapan
Lepas dri tambat Continue ke jetty
In position BL 03
Fwe
Comence Loading
Sbe prepare
Complete loading, Total Cargo 7.400 MT
Cast off BL 03 / Continue to muara.kaman, Eta muara kaman 11/08/23 11.30 Lt
Passing KM 24, Eta muara kaman 11/08/23 11.30 Lt
Bebas alur kedang Kepala
Passing Muara kaman/Continue to Hrpan baru, Eta Harapan baru 12/08/23 03.00 Lt
Tiba di Mahulu, Cont antrian pengolongan Jembt Mahakam
Ngolong Mahakam
Ngolong Mahkota II
Arrival p.buaya/lnjut Tambatan
Clear tambat P.buaya
Fwe
Sbe bergerak ke Kutai Lama
Tiba Kutai lama
Fwe
Star isi Air tawar
Finish isi FW 40 Ton
Sbe kembali ke pulau buaya
Tiba di Tongkang
Fwe
standby waiting next info, Eta Vessel 16/08/23 (at Tambatan Pulau Buaya)
standby waiting next info, Eta Vessel 16/08/23 (at Tambatan Pulau Buaya)
standby waiting next info, Eta Vessel 16/08/23 (at Tambatan Pulau Buaya)
Sbe prepare
Bebas Tambatan Pulau Buaya
Full away to muara berau, Eta muara berau 17/08/23 01.30 Lt
Passing Muara Pegah, Eta muara berau 17/08/23 01.30 Lt
Arrival Muara berau
Clear drop Anchor
Few
Standby waiting antrian bongkar (at Muara Berau)
Standby waiting antrian bongkar (at Muara Berau)
Standby waiting antrian bongkar (at Muara Berau)
Standby waiting antrian bongkar, est Dish 21/08/23 PM (at Muara Berau)
Standby waiting antrian bongkar, est Dish 21/08/23 PM (at Muara Berau)
Sbe Up jangkar Prepare sandar
Jangkar up continue To MV.MUNQIDZ
In position FC Calypso/MUNQIDZ
Comence Discharge
Few
Sbe shifting Maju TK
Fwe slesai shifting
Complete Discharge
Sbe prepare cast off
Cast off Mv.MUNQIDZ
Selesai berlabuh di Area pintu masuk muara berau
Fwe/St_by nunggu Air pasang
Sbe Hibob jangkar
Jangkar up continue To Pulau buaya, Eta Pulau buaya 22/08/23 16.30 Lt
Arrival Pulau.buaya
Continue ikut Pengolongan naik
Ngolong Mahakam
Ngolong Mahulu
Ngolong Tenggarong
Posisi Melintang Kp Sebulu, Eta muara kaman 23/08/23 20.00 Lt
Arrival Muara kaman
Assist konek continue Kedang kepala
Arrival Kedang kepala
Proses masuk alur Kedang kepala, Eta Senyiur 24/08/23 16.30 Lt
Posisi 0° 7' 30.84" N 116° 40' 47.28" E, Eta Senyiur 24/08/23 16.30 Lt
Arrival KM 99
Proses Putar Tongkang
Selesai Putar BG Lanjut ke tambatan 99
Clear tambat di KM 99
Fwe
Sbe prepare
Cast off Tambat 99 Continue Mengarah jetty
Clear tambat diatas Jetty BL 01
Few
Sbe prepare sandar
Cast off tambat atas Jetty BL 01
In position BL 01
Fwe
Comence Loading
Sbe prepare cast off
Finish Loading, Total Cargo 7.500 MT
Cast Off jetty BL 01
Sail to muara kaman, Eta muara kaman 25/08/23 18.30 Lt
0° 12' 51.36" N 116° 37' 44.4" E, Eta muara kaman 25/08/23 18.30 Lt
Passing Kmp m.siran
Bebas alur kedang kepala
Passing muara kaman
Sail to Harapan baru, Eta harapan baru 26/08/23 08.30 Lt
Melintang Kp Jembayan, Eta harapan baru 26/08/23 08.30 Lt
Arrival Mahulu lanjut Apung" Ikut pengolongan
Ngolong Mahulu
Ngolong Mahakam
Ngolong Mahkota II
Arrival p.buaya lanjut Tambat tongkang
Clear tambat p.buaya
Few
Standby waiting info Vessel, Eta Vessel 30/08/23 (at Pulau Buaya)
Standby waiting info Vessel, Eta Vessel 30/08/23 (at Pulau Buaya)
Sbe bergerak ke Kutai Lama
Tiba di Kutai Lama
Fwe
Star isi Air tawar
Finish isi air tawar Sebanyak 25 Ton
Sbe kembali ke tongkang
Kapal Tiba di p.buaya
Few
Standby waiting info Vessel, Eta Vessel 30/08/23 (at Pulau Buaya)
Standby menunggu antrian keluar tambatan (at Pulau Buaya)
Sbe prepare cast off
Cast off tambat p.buaya
Full away muara berau, Eta muara berau 31/08/23 21.00 Lt
Passing Melintang Bayur, , Eta muara berau 31/08/23 21.00 Lt
Arrival m.berau
Gerak ke tempat berlabuh
Selesai berlabuh jangkar
Fwe
Standby waiting info disch, Eta vessel 02/09/23 (at Muara Berau)
Standby waiting info disch, Eta vessel 02/09/23 (at Muara Berau)
Standby waiting info disch, Eta vessel 02/09/23 (at Muara Berau)
Standby waiting info disch, Eta vessel 02/09/23 (at Muara Berau)
Sbe hibob jangkar
Jangkar up next Sandar
Tiba di MV.Mumtaz
Inposition MV.Mumtaz
Fwe
Comence discharge
Disch Progress 85% (at Muara Berau)
Complete discharge
Sbe Prepare cast off
Cast off MV. Mumtaz
Passing alur m.berau
F/A to pulau buaya, Eta pulau buaya 05/09/23 22.00 Lt
Arrival pulau buaya
Continue to tambat
Clear tambat at pulau buaya
Fwe
Standby waiting Pengolongan dibuka 11.00 Lt (at Pulau Buaya)
Sbe Prepare cast off
Cast off tambat pulau buaya
Arrival Bawah Mahkota II
Selesai berlabuh Jangkar/Penggolongan Mahkota II tutup
Fwe
Sbe hibob jangkar
Jangkar up Next ngolong
Ngolong Mahkota II
Ngolong Mahakam
Continue Muara kaman, Eta muara kaman, 07/09/23 19.00 Lt
Passing Kp Senoni, Eta muara kaman, 07/09/23 19.00 Lt
Arrival Muara kaman
Continue kedang kepala
Arrival kedang kepala
Msuk alur kedang kepala Continue to senyiur, Eta senyiur 08/09/23 13.00 Lt
Arrival KM 99
Selesai Putar tongkang
Clear tambat di KM 100
Few, Standby waiting info Loading (at Tambatan KM 100)
Sbe Gerak ke atas ujung BL 01/St_by
Selesai tambat di Peling" Atas BL 01
Fwe
Sbe bergerak Sandar
Lepas Dari peling" Next sndar BL 01
In position BL 02
Commence Loading
Sbe prepare cast off
Finish loading, Total Cargo 2.828 MT
Cast off BL 02
Sail to muara kaman, Eta muara kaman 09/09/23 07.00 Lt
Posisi KM 12, ikut antrian passing kp muara suran, Eta Muara Kaman 09/09/23 09.00 Lt
Bebas alur kdng kepala
Continue to tambat
Clear tambat di Tambatan MKP Atas CTB 02
Fwe
Standby waiting penambahan muatan (at Tambatan Fortune, Muara Kaman)
Standby waiting penambahan muatan (at Tambatan Fortune, Muara Kaman)
Standby waiting penambahan muatan (at Tambatan Fortune, Muara Kaman)
Sbe prepare sandar
lepas tambat next to CTB 02
In position CTB 02/Langsung muat
Fwe
Finish Loading, Total Cargo 7.500 MT
Sbe prepare cast off
Cast off jetty CTB 02
Sail to Harapan baru, Eta harapan baru 13/09/23 19.30 Lt
Passing Kp Banua Pohon, Eta harapan baru 13/09/23 19.30 Lt
Ngolong Tenggarong
Ngolong Mahulu
Arrival harapan baru/Tambat
Clear tambat Fery"
Fwe
Star Engine
lepas tambat, cont antrian pengolongan Jembt Mahakam
Ngolong Mahakam
Ngolong Mahkota II
Full away muara berau, Eta muara berau 15/09/23 18.00 Lt
Posisi Melintang Muara Pamengkaran, Eta muara berau 15/09/23 18.00 Lt
Arrival muara berau
Continue tmpt Berlabuh
Arrival area berlabuh
Info langsung sandar
Arrival MV.Aurora Christine
Assist KSA 127 Konek
In position BG.PB 3016
Fwe
Standby waiting info disch (at Muara Berau)
Star bongkar cargo
Sbe shifting Tongkang
Fwe
Sbe assist TB. Pesona 99
Fwe selesai assist
Sbe prepare Cast off
Komplit bongkar
Cast off MV. aurora
Proses masuk alur m.berau
Full away pulau buaya, Eta pulau Buaya 17/09/23 08.30 Lt
Arrival pulau buaya/next Tambat
Clear tambat TK di pulau buaya
Fwe
Sbe Gerak ke kutai Lama
Fwe tiba kutai lama
Start Bunker HSD
Start isi air tawar
Selesai isi Air tawar Sebanyak 45 Ton
Sbe kembali ke tongkang
Selesai Bunker HSD 45.000 Ltr
tiba di p.buaya
Fwe
Standby waiting pengolongan naik (at Tambatan Pulau Buaya)
Sbe prepare cast off
Cast off pulau buaya continue Ikut pengolongan naik
Ngolong Mahkota II
Ngolong Mahakam
Sail to muara kaman, Eta muara kaman 19/09/23 12.00 Lt
Passing Benua Pohon, Eta muara kaman 19/09/23 12.00 Lt
Arrival muara kaman
Lanjut ke kdng kepala
Tiba kedang kepala
Masuk alur kedang kepala, Eta senyiur 20/09/23 12.00 Lt
Melintang KM 82, Eta senyiur 20/09/23 12.00 Lt
Arrival KM 99
Selesai putar Barge
Lanjut ke area jetty
Tiba peling" Atas jetty
Clear tambat atas BL 01
Fwe
Sbe prepare sandar
Lepas tambat/Lnjut BL 1
Inpostion jt BL 01
Fwe
Comence Loading Barge
Complete Loading, Total Cargo 7.400 MT
Sbe prepare cast off
Cast off BL 01/continue to muara kaman, Eta muara kaman 21/09/23 11.30 Lt
Sailing Load to Muara Kaman, Eta muara kaman 21/09/23 11.30 Lt
Bebas alur kdng kepala
Arrival muara kaman
Full away Harapan baru, Eta Harapan baru 22/09/23 05.00 Lt
Ngolong j. Tenggarong
Arrival harapan baru
Lanjut Antri ikut Ngolong
Ngolong jemb Mahakam
Ngolong Mahkota II
Sail to muara Berau, Eta Muara berau 23/09/23 18.30 Lt
Melintang Tg Bayur, Eta Muara berau 23/09/23 18.30 Lt
Arrival ma.berau
Selesai berlabuh jangkar
Fwe
Standby waiting info disch (at Muara Berau)
Standby waiting info disch (at Muara Berau)
Sbe hibob jangkar
Jangkar up gerak sandar
Tiba di MV.Maria nashwah
In position Barge PB 3016
Fwe
Comence discharge
Sbe Shifting maju barge
Fwe
Complete Discharge
Sbe prepare Cast off
Cast off FC. Green Calypso
Masuk alur muara berau
Sail to pulau Buaya, Eta pulau buaya 26/09/23 13.00 Lt
Passing Pulau Miang, Eta pulau buaya 26/09/23 13.00 Lt
Arrival pulau buaya
Selesai berlabuh dpn Tpk palaran
Fwe
Sbe Hibob jangkar
Jangkar up/Pengolongan
Ngolong j.Mahkota II
Ngolong j.Mahakam
Full away Muara Kaman, Eta muara kaman 27/09/23 18.00 Lt
Passing Kp Sebulu, Eta muara kaman 27/09/23 18.00 Lt
Arrival Muara kaman
Lanjut kedang kepala
Tiba kedang kepala
Masuk alur kedang kepala, Eta senyiur 28/09/23 15.00 Lt
Posisi KM 86, Eta senyiur 28/09/23 15.00 Lt
Arrival KM 99
Clear Putar tongkang
In position BL 03
Fwe
Comence Loading
Sbe Proses Cast off
Finish Loading, Total Cargo 5.520 MT
Cast off jt BL 03
Sail to Muara kaman, Eta muara kaman 29/09/23 07.00 Lt
Passing KM 09, Eta Muara Kaman 29/09/23 09.00 Lt
Bebas alur kedang kepala
Lanjut Tambat tongkang
Clear tambat Dibawah CTB 01
Fwe
Standby waiting info penambahan cargo (at Tambatan Fortune)
Sbe prepare Sandar CTB
Casf off tambatan
In position CTB 02
Comence Loading
Fwe
Sbe prepare Cast off
Completed Loading, Total Cargo 7.500 MT
Cast off BL 02
Clear tambat Di BG PB.3016 Fortune
Fwe
Sbe Prepare naik KM 80
Tiba kedang kepala
Masuk kedang kepala, Eta KM 80 TB. JODABO 30/09/23 24.00 Lt
Arrival KM 80/JODABO
Fwe
Sbe prepare Tarik barge MHKL 32
Stop tarik MHKL tdk Ada gerakan bebas
Fwe
Sbe Tarik MHKL 32
Fwe blm ada gerakan bebas
Sbe Tarik BG.MHKL 32
Barge MHKL lepas kandas
Lanjut turun muara Kaman
Proses Tambat MHKL 32
Clear tambat di KM 65
Fwe
WGM 202 Passing KM 09 (Gandeng MHKL 32) & PB 3016 (at Tambatan Fortune)
Bebas kedang kepala
Lanjut sandar CTB 01
In position CTB 01
Sbe prepare Cast off
Cast off CTB 01
Lanjut Tambat tongkang
Clear tambat MHKL 32 di Fortune Kaman.
Fwe
Sbe Prepare Lepas tambat
Lepas tambatan Fortune kaman
Sail Harapan Baru, Eta Harapan Baru 03/10/23 09.00 Lt
Mendekati Jemb Tenggarong, Eta Harapan Baru 03/10/23 09.00 Lt
Ngolong j.Tenggarong
Ngolong j.Mahulu
Arrival Harapan baru
Clear Tambat Fery" HB
Fwe
Proses antrian pengolongan Jembatan Mahakam (at Harapan Baru)
Sbe Prepare Lepas tmbat
Lepas tambat Fery" HB
Ngolong Mahakam
Ngolong Mahkota II
Sail to muara berau, Eta muara berau 05/10/23 19.30 Lt
Passing Muara Pamangkaran, Eta muara berau 05/10/23 19.30 Lt
Arrival Muara berau
Lanjut area Berlabuh
Clear Drop Anchor
Standby waiting info disch (at Anchorage Muara Berau)
Sbe persiapan Hibob jangkar
Jangkar up Bergerak to MV.MUADZ
Tiba di MV.MUADZ
In position at MV.MUADZ
Fwe
Standby waiting info disch (at Muara Berau)
Completed discharge
Sbe Prepare cast off
Cast off Mv.Muadz, Continue to Pulau buaya, Eta pulau buaya 08/10/23 14.00 Lt
Passing Saliki, Eta pulau buaya 08/10/23 14.00 Lt
Arrival pulau Buaya, Continue Area TPK palaran
Selesai Berlabuh di Depan TPK Palaran
Fwe
Sbe Hibob jangkar
Jangkar up/Continue Pengolongan Naik
Ngolong Mahkota II
Ngolong Mahakam
Sail to ma kaman, Eta muara kaman 09/10/23 20.00 Lt
Passing Kp Bloro, Eta muara kaman 09/10/23 20.00 Lt
Arrival muara kaman
Clear Tambat di Fortune kaman
Fwe
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune, Muara Kaman)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune, Muara Kaman)
Sbe lepas tambat Fortune
Lepas tambat/Continue kedang kepala
Proses Msuk alur kdng kepala, Eta Senyiur 12/10/23 18.30 Lt
Passing km 61, Eta Senyiur 12/10/23 18.30 Lt
Arrival KM 98
Clear tambat di KM 98
Fwe
Sbe Lepas tambat
Lepas tambat KM 98, Lanjut putar tongkang
Selesai putar tongkang di KM 99
Clear tambat di ujung BL 01
Fwe
Sbe prepare sandar
lepas tambat ujung BL 01
Inposition BL 01
Fwe
Star loading
Sbe prepare cast off
Finish loading, Total Cargo 4.770 MT
Cast off BL 01 continue, CTB muara kaman penambahan, Eta muara kaman 13/10/23 18.30 Lt
Passing KM 78, Eta muara kaman 13/10/23 18.30 Lt
Bebas alur kedang kepala
Continue Tambat tongkang
Clear tmbat Di atas CTB 01
Fwe
standby waiting info penambahan cargo (at Tambatan Fortune, Muara Kaman)
standby waiting info penambahan cargo (at Tambatan Fortune, Muara Kaman)
Sbe prepare Sandar CTB
Cast off Tambat MKP Fortune
In position CTB 01
Comence Loading
Fwe
Complete Loading, Total Cargo 7.500 MT
Sbe prepare Cast off
Cast off CTB 1/Continue to Harapan baru, Eta harapan baru 16/10/23 17.00 Lt
Passing Tg Harapan, Eta harapan baru 16/10/23 17.00 Lt
Ngolong Tenggarong
Ngolong Mahulu
Arrival Harapan baru
Clear tambat di Fery HB
Fwe
Sbe prepare Ngolong
Cast off tmbat HB
Ngolong Mahakam
Ngolong Mahkota II, Lanjut muara Berau Eta muara berau 18/10/23 17.00 Lt
Passing Pamangkaran, Eta muara berau 18/10/23 17.00 Lt
Arrival muara berau
Proses berlabuh jangkar
Selesai berlabuh
Fwe
Standby waiting info disch (at Muara Berau)
Sbe hibob jangkar
Jangkar up/Continue Mv.Maria Naswah
Tiba MV.Maria Naswah
Inpost MV.Maria Naswah
Fwe
Comence Discharge
Stop Discharge
Sbe Prepare Cast off
Cast off FC Calypso lanjut gerak area berlabuh
Selesai berlabuh kembali
Fwe
Sbe Hibob jangkar
Jangkar up/Lanjut sandar
Tiba di buritan FC.Calypso
In post MV.Maria naswah Langsung bongkar
Disch Progress 40% (at Muara Berau)
Stop Bongkar/Vesel Full
Sbe Prepare Cast off
Cast off MV.Maria Naswah
Selesai berlabuh jangkar
Fwe
Standby waiting next Vessel (at Muara Berau)
Sbe hibob jangkar
Jangkar up/gerak Sandar Vessel
Tiba di buritan UNITAMA LILY
Inpost at MV.UNITAMA LILY
Fwe
start disch
disch progress 20% (at Muara Berau)
Finish bongkar
Sbe prepare Cast off
Cast off MV.Unitama Lily
Proses masuk alur ma berau
Sail to pulau Buaya, Eta pulau buaya 23/10/23 00.30 Lt
Arrival Pulau buaya
Proses tambat Tongkang
Clear tambat BG PB.3016
Fwe
Sbe Bergerak ke kutai Lama
Tiba di kutai Lama
Fwe/st_by isi air tawar
proses bunker FW & standy waiting info bunker HSD (at Kutai Lama)
Slesai isi Fw sbnyk 60 ton
Sbe kembali ke Pulau buaya
Tiba di pulau buaya/ikat di Tongkang
Fwe
Start Bunker HSD
Finished Bunker HSD 45.000 Ltr
Sbe persiapan lepas tambat
Cast off tambat p.buaya
Ngolong Mahkota II
Ngolong Mahakam, Eta muara kaman 24/10/23 20.00 Lt
Passing Sirbaya, Eta muara kaman 24/10/23 20.00 Lt
Arrival muara kaman
Clear tambat MKP Fortune
Fwe
Standby waiting info naik Senyiur (at tambatan Fortune, Muara Kaman)
Standby waiting info naik Senyiur (at tambatan Fortune, Muara Kaman)
Standby waiting info naik Senyiur (at tambatan Fortune, Muara Kaman)
Sbe prepare Lepas tambat
Cast off tambat/continue kedang kepala
Arrival Kedang kepala
Msk alur kdng kepala Continue to Senyiur, Eta Senyiur 28/10/23 20.00 Lt
Sailing empty to Senyiur, Eta Senyiur 28/10/23 20.00 Lt
Arrival KM 98
Proses tambat Tongkang
Clear tambat KM 98
Fwe
Sbe prepare Sandar
Cast off tambatan KM 98
Tiba area Jetty
Inpost Jetty BL 03
Fwe
Comm Loading
Sbe prepare cast off
Finish loading, Total Cargo 4.050 MT
Cast off Jetty BL 03, Continue turun CTB muara kaman
Tiba KM 33
Selesai tambat di KM 33
Fwe
Passing KM 22, Eta CTB 30/10/2023 10.00 Lt
Bebas alur kedang kepala
Slesai tambat dibwah CTB 01
Fwe
Standby waiting info Penambahan Cargo (at Tambatan Fortune, Muara Kaman)
Standby waiting info Penambahan Cargo (at Tambatan Fortune, Muara Kaman)
Sbe prepare sandar
Lepas Tambatan MKP
In position CTB 02
Comence loading
Fwe
Sbe prepare cast off
Complete Loading, Total Cargo 7.400 MT
Cast off CTB 03 continue Turun Harapan baru, Eta Harapan Baru 02/11/23 09.00 Lt
Passing Loa Kulu, Eta Harapan Baru 02/11/23 09.00 Lt
Ngolong Mahulu
Arrival Harapan baru
Selesai tambat Harapan baru
Fwe
Sbe prepare Ngolong
Lepas tambat Harapan baru
Ngolong Mahakam
Ngolong Mahkota II, Eta Muara berau 04/11/23 16.30 Lt
Melintang Tg Bayur, Eta Muara berau 04/11/23 16.00
Arrival muara berau
Tiba area Berlabuh
Selesai berlabuh jangkar
Fwe
Proses sandar Vessel (at Muara Berau)
Sbe hibob jangkar
Selesai angkat jangkar
Tiba di buritan Vessel Nashalina
In position MV.Nashalina
Start Disch
Disch Progress 40% (at Muara Berau
Arrival Pulau buaya
Bergerak ke tmpt berlabuh
Selesai berlabuh jangkar didepan pelabuhan palaran
fwe
Sbe hibob jangkar
Jangkar up continue ngolong
Ngolong Mahkota II
Ngolong Mahakam
Sail to Muara Pahu, Eta muara Pahu, 09/11/23 20.30 Lt
passing kp bloro, Eta muara Pahu, 09/11/23 20.30 Lt
standby waiting info Pos 1 to Senyiur (at Tambatan Muara Kaman)
Sbe prepare Lepas tambat
Cast off tambat Fortune
Arrival kedang kepala
Masuk alur kedang kepala
Continue sailing Empty, Eta senyiur 10.11.2023 at 17:00
Sbe prepare sandar
Lepas tambat Peling"
In position BL 02
Comence Loading PB 3016
Fwe
Sbe prepare Cast off
Finish Loading, Total Cargo 5.181 MT
Cast off BL 02/Continue CTB kaman
Bebas alur kedang kepala
Continue tambatan MKP
Selesai tambat dibwah CTB 01
Fwe
at tambatan Nunggu info sandar CTB
Sbe prepare Cast Off
Finish Loading, Total Cargo 7.400 MT
Cast Off CTB 02
Sail to Samarinda
Posisi Penyebrangan Sirbaya mengarah sebulu
Passing Mahakam Bridge, Sailing Load to POD Muara Jawa,ETA 15.11.2023 AM
Passing tg Bayur, Sailing Load to POD Muara Berau,ETA 15.11.2023 at 18:30
Arrival Muara Berau
Proses bergerak ke Vessel
Tiba di MV.MUHARRIK
Assist TB.SB 10 Konek
In position MV.Muharrik
Fwe
Commence Disch/at Muara Berau Disch Progress
Stop bongkar/MVMuharrik Full
Sbe prepare cast off
Cast Off MV.MUHARRIK
Lanjut ke MV.Unitama Lily
Tiba di MV.Unitama Lily
In position MV.Unitama Lily/Langsung Bongkar
Fwe
Finish Bongkar
Sbe Prepare Cast off
Cast Off MV.UNITAMA LILY
Sail to pulau Buaya
Passing kp Handil, Eta Pulau buaya 17/11/23 15.00 Lt
Arrival pulau buaya
Selesai tambat Di P.Buaya
Fwe
Sbe Gerak ke kutai Lama
Tiba di kutai Lama
Star Isi Air tawar
Finish isi Air sebanyak 60 ton
Sbe Kembali ke P.buaya
Tiba di p.Buaya
Fwe
Sbe prepare Lepas tambat
Lepas Tambat p.buaya
Ngolong Mahkota II
Ngolong Mahakam
Sail to Muara Kaman, Eta Muara Kaman 19/11/23 14.30 Lt
Passing Kp Dayak, Eta Muara Kaman 19/11/23 14.30 Lt
Arrival Muara kaman, Lanjut kedang Kepala
Arrival Kedang kepala
Masuk alur Kedang kepala, Eta Senyiur 20/11/23 13.30 Lt
sailing empty to Senyiur, Eta Senyiur 20/11/23 13.30 Lt
Tiba KM 99 langsung Putar Tongkang
Selesai Putar Tongkang
Selesai Tambat di KM 99
Fwe
Sbe prepare Sandar
Lepas Tambat/Lanjut ke area jetty
Tiba Area jetty
In position BL 01
Fwe
Comence Loading
Sbe prepare Cast off
Complete Loading, Total Cargo 7.225 MT
Cast Off BL 01/Lanjut Turun CTB Kaman penambahan, Eta CTB muara Kaman 21/11/23 20.00 Lt
Sailing load to Muara Kaman, Eta CTB muara Kaman 21/11/23 20.00 Lt
Bebas Alur kedang kepala
Tiba di CTB 01
In position CTB 01
Star Loading
Sbe Prepare Cast Off
Komplit Penambahan Cargo, Total Cargo 7.400 MT
Cast Off CTB 01
Full away Harapan baru, Eta harapan baru 22/11/23 02.00 LT
Arrival Harapan baru
Clear Tambat Fery" HB
Fwe
Standby waiting info Pengolongan Jemb Mahakam (at Harapan Baru)
Sbe Prepare Ngolong
Lepas tambat Fery" HB
Ngolong Mahakam
Ngolong Mahkota II
Tiba Di pulau buaya
Selesai tambat di P.Buaya
Standby waiting info Vessel (at Pulau Buaya)
Standby waiting info Vessel (at Pulau Buaya)
Sbe Prepare Lepas tambat
Lepas tambat P.Buaya To muara Berau, Eta Muara Berau 26/11/23 03.00 Lt
Melintang Pamangkaran, Eta Muara Berau 26/11/23 03.00 Lt
Arrival Muara Berau
Selesai Berlabuh jangkar
Fwe
Standby waiting info disch (at Muara Berau)
Standby waiting info disch est 27/11/23 16.00 LT (at Muara Berau)
Sbe Hibob jangkar
Jangkar up bergerak sandar
Tiba di MV.Kareem
In position MV.Kareem
Fwe
Star bongkar
Disch Progress 35% (at Muara Berau)
Finish bongkar
Sbe prepare cast Off
Cast Off MV.Kareem
Sail to P.buaya, Eta Pulau buaya, 29/11/23 08.30 LT
Proses tambat di pulau buaya
Arrival P.Buaya
Proses tambat
Clear tambat P.buaya
Fwe
Start Bunker HSD
Finish Bunker HSD 45.000 Ltr
Standby waiting pengolongan dibuka (at Tambatan Pulau Buaya)
Sbe Prepare Lepas Tambat
Lepas tambatan P.buaya
Ngolong J.Mahkota II
Ngolong J.Mahakam
Continue to Muara Kaman, Eta Muara kaman 01/12/23 14.30 LT
Passing Teratak, Eta Muara kaman 01/12/23 14.30 LT
Arrival Muara Kaman
Clear tambat Fortune Kaman
Fwe
Sbe Prepare Lepas tambat
Lepas tambatan Fortune
Arrival Kedang kepala
Masuk Alur kdng kepala Continue Naik senyiur, eta Senyiur 02/12/23 14.30 LT
Sailing Empty to Senyiur, eta Senyiur 02/12/23 14.30 LT
Arrival KM 98
Proses Tambat Tongkang
Fwe/Selesai Tambat KM 99
Sbe Prepare Lepas Tambat
Lepas tambat KM 98
Selesai Ikat di Atas BL 01
Fwe
Sbe Prepare Sandar
Lepas tambat atas BL 01
Inpost jetty BL 01
Fwe/ Star Loading Cargo
Sbe Prepare Cast Off
Finish Loading Cargo, Total Cargo 7.400 MT
Cast Off BL 01 continue Muara.Kaman, Eta Muara Kaman 03/12/23 19.30 LT
Sailing Load to Muara Kaman, Eta Muara Kaman 03/12/23 19.30 LT
Arrival KM 18
Clear Tambat Di KM 18
Fwe
Sbe Prepare Lepas tambat
Lepas tambat KM 18 Continue Muara kaman
Passing KM 06, Eta Muara Kaman 04/12/23 08.30 Lt
Bebas Alur kedang kepala
Arrival muara Kaman, Continue Turun Harapan baru
Ngolong Tenggarong
Ngolong Mahulu
Arrival Loa buah
Clear Tambat Arrayan
Fwe
Standby waiting info pengolongan Jemb Mahakam (at Tambatan Arrayan)
Sbe Prepare Lepas Tambat
Lepas Tambatan Arrayan
Ngolong Mahakam
Ngolong Mahkota II
Tiba di Pulau buaya
Selesai Tambat Di Pulau Buaya
Fwe
Standby waiting info vessel, Info Vessel 10/12/23 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Info Vessel 10/12/23 (at Tambatan Pulau Buaya)
Standby waiting info vessel & Process Repair Temporary PB 3016, Info Vessel 10/12/23 (at Tambatan Pulau Buaya)
Standby waiting info vessel & Process Repair Temporary PB 3016, Info Vessel 10/12/23 (at Tambatan Pulau Buaya)
Standby waiting info vessel & Process Repair Temporary PB 3016, Info Vessel 10/12/23 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Info Vessel 12/12/23 (at Tambatan Pulau Buaya)
Sbe Prepare Lepas Tambat
Lepas tambatan P.Buaya/Continue To Muara Jawa
Passing Tg Raden, Eta Muara Jawa 12/12/23 16.00 Lt
Arrival Muara Jawa
Selesai Berlabuh jangkar
Fwe
Standby waiting info disch (at Anchorage Muara Jawa)
Sbe Hibob jangkar
Jangkar Up Bergerak Sandar
Tiba di MV.Munqidz
Inpossy MV.Munqidz/langsung Bongkar
Fwe
Sbe Prepare Cast Off
Komplit Bongkar
Cast Off MV.MUNQIDZ
Document On Board/Continue To Pulau Buaya
Passing Muara Kembang, Eta Pulau Buaya 14/12/23 14.00 LT
Sbe Hibob Jangkar
Jangkar Up lanjut Ngolong
Ngolong Mahkota II
Ngolong Mahakam
Document Turun /Continue Sail to Muara kaman
Ngolong Mahulu
Ngolong Tenggarong
Posisi Passing Kmp Separi, Eta Muara Kaman 15/12/23 19.00 LT
Arrival Muara Kaman, Continue Tambatan Fortune
Clear Tambat di Fortune
Fwe
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune, Muara Kaman)
Sbe Prepare Lepas Tambat
Lepas Tambatan Fortune, Continue naik Kedang Kepala
Tiba Di Kedang Kepala
Pandu Senyiur Naik
Masuk Alur Kedang Kepala, Eta Senyiur 17/12/23 11.30 LT
Passing KM 95, Eta Senyiur 17/12/23 11.30 LT
Arrival KM 99
Proses Tambat Tongkang
Selesai Tambat di KM 99
Fwe
Sbe Prepare Lepas Tambat
Lepas Tambatan KM 99
Tiba Area Jetty Senyiur
Selesai Ikat diAtas BL 01
Fwe
Sbe Prepare Lepas Tambat
In position BL 01
Fwe
Comence Loading Cargo
Sbe Prepare Cast Off
Complete Loading Cargo, Total Cargo 7.500 MT
Cast Off jetty BL 01/Continue Turun Muara Kaman, Eta Muara Kaman 18/12/23 08.00 LT
Posisi Passing KM 07 Muara siran, Eta Muara Kaman 18/12/23 08.00 LT
Bebas Alur Kedang kepala
Arrival Muara Kaman, Lanjut Turun Harapan Baru
Ngolong Jembatan Tenggarong
Ngolong Mahulu
Arrival Harapan Baru
Selesai Tambat di Fery" HB
Fwe
Standby waiting Pengolongan dibuka (at Tambatan Harapan Baru)
Sbe Prepare Ngolong
Lepas Tambat Fery" HB
Ngolong Mahakam
Ngolong Mahkota II/Continue Sail to Ma Berau, Eta Muara Berau 20/12/23 22.00 LT
Passing Tg Bayur, Eta Muara Berau 20/12/23 22.00 LT
Arrival Muara Berau/Continue Berlabuh Jangkar
Selesai Berlabuh Jangkar
Fwe
Sbe Hibob Jangkar
Jangkar Up/Bergerak Sandar Di MV.MUMTAZ
In position at MV.MUMTAZ
Fwe
Start Bongkar (at Muara Berau)
Komplit Bongkar
Sbe Prepare Cast Off
Cast OFF MV.Mumtaz, Continue FW to P.Buaya, Eta Pulau Buaya 22/12/23 07.00 LT
Tiba di Pulau Buaya lanjut labuh depan TPK Palaran
Start Engine, Continue Pengolongan Jemb Mahakam
Sbe Hibob Jangkar
Jangkar Up Lanjut Ngolong Naik
Ngolong J.Mahkota II
Ngolong J.Mahakam, Lanjut Naik Muara Kaman
Ngolong J.Mahulu
Ngolong Tenggarong
Posisi Passing Kp.SELERONG, Eta Muara kaman 24/12/23 10.55 LT
Arrival Muara Kaman, Nunggu info dri Pos 1
Bergerak Ke Kedang Kepala
Tiba Di Kedang Kepala
Masuk Alur Kedang kepala , cont Senyiur, Eta Senyiur 25/12/23 13.00 LT
Arrival KM 98
Proses Tambat Tongkang
Clear Tambat TK di KM 98
Fwe
Sbe Lepas Tambat
Lepas Tambat KM 98/Lanjut Bergerak ke Area Jetty
Selesai Ikat Dibawah BL 03
Fwe
Sbe Prepare Sandar
In Position BL 03
Fwe/Langsung Muat
Loading Progress 95% (at Jetty Senyiur)
Sbe Prepare Lepas Tambat
Lepas tambat KM 13/Lnjut turun Muara Kaman, Eta Muara Kaman 27/12/23 09.00 LT
Bebas Alur Kedang Kepala/Lanjut Turun Harapan Baru
Arrival Harapan Baru
Selesai Tambat di tambatan Patung Harapan Baru
Fwe
Sbe prepare Ngolong
lepas tambat Lanjut ikut Pengolongan J.Mahakam
Ngolong Mahakam
Ngolong Mahkota II/Lanjut turun Pulau Buaya
Arrival Pulau Buaya
Selesai Tambat Tongkang
Fwe
Standby waiting info Vessel, Vessel arrived Muara Jawa Est 02/01/23 (at Tambatan Pulau Buaya)
Standby waiting info Vessel, Vessel arrived Muara Jawa Est 02/01/23 (at Tambatan Pulau Buaya)
Standby waiting info Vessel, Vessel arrived Muara Jawa Est 02/01/23 (at Tambatan Pulau Buaya)
Standby waiting info Vessel, Vessel arrived Muara Jawa Est 02/01/23 (at Tambatan Pulau Buaya)
mendekati tempat berlabuh di Muara Jawa
Arrival Muara jawa/ apung"nunggu SB 10 selesai berlabuh
Bergerak Ke Tongkang SB 10
Selesai Ikat di Tongkang SB 10/HH 3003
Fwe
Sbe Lepas Tali dari BG HH 3003
Tiba Di Buritan MV.MUNQIDZ
In position MV.MUNQIDZ/FC CALYPSO
Comence Discharge
Fwe
Komplit Discharge
Sbe Prepare Cast Off
Cast Off MV.MUNQIDZ/Full Away Muara Jawa to Pulau Buaya, Eta Pulau Buaya 03/01/24 16.00 LT
Passing Buoy 7 Muara Pegah, Eta Pulau Buaya 03/01/24 16.00 LT
Arrival Pulau Buaya
Selesai Tambat Tongkang
Bergerak Ke Kutai Lama
Fwe/Tiba di Kutai Lama
Star Isi Air tawar
Selesai Isi FW sbnyk 60 Ton
Sbe Kembali Ke Tongkang
Tiba di Pulau Buaya
Fwe
Start Bunker
Finish Bunker HSD 45.000 Ltr
Standby waitin info pengolongan dibuka (at Tambatan Pulau Buaya)
Sbe Prepare Ngolong Naik
Lepas Tambatan P.Buaya
Ngolong J.Mahkota II
Ngolong J.Mahakam / Continue Sail Naik Muara kaman, Eta Muara Kaman 05/01/24 20.30 LT
Ngolong J.Tenggarong
Posisi Passing PLTU EMBALUT, Eta Muara Kaman 05/01/24 20.30 LT
Arrival Muara Kaman
Selesai Tambat Di Fortune
Fwe
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Sbe Prepare Lepas Tambat
Lepas Tambat Lanjut Naik Kedang Kepala
Masuk Alur Kedang Kepala
Arrival KM 100/Putar Barge
Selesai Putar Tongkang
Tiba Di Area Jetty
In position Jetty BL 02
Fwe, Standby waiting info Start Loading (at Jetty Senyiur)
Comence Loading Cargo 7.500 MT
Sbe Prepare Cast Off
Komplit Loading Cargo, Total Cargo 7.500 MT
Cast Off BL 02 continue Turun Muara Kaman, Eta Muara Kaman 08/01/24 02.00 Lt
Arrival KM 70/Proses Tambat
Selesai Tambat Tongkang di KM 70
Fwe
Sbe Prepare Lepas Tambat 70
Lepas Tambatan KM 70/Lanjut turun Muara Kaman, Eta Muara Kaman 08/01/24 08.30 Lt
Passing KM 5, Eta Muara Kaman 08/01/24 08.30 Lt
Bebas Alur Kedang Kepala
Arrival Muara Kaman Lanjut turun Harapan Baru
Ngolong tenggarong
Arrival Mahulu/Putar Barge Nunggu Pengolongan Buka
Ngolong Mahulu
Arrival Harapan baru
Selesai Tambat Di Tambatan Patung Hrpan Baru
Fwe
Standby waiting Pengolongan di buka (at Tambatan Harapan Baru)
Sbe Prepare Lepas Tambat
Lepas Tambatan Patung HB
Ngolong Mahakam
Ngolong Mahkota II
Tiba Di Pulau buaya
Selesai Tambat tongkang
Fwe
Standby waiting info vessel, Est Vessel arrival 13/01/24 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Est Vessel arrival 13/01/24 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Est Vessel arrival 13/01/24 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Est Vessel arrival 16/01/24 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Est Vessel arrival 16/01/24 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Est Vessel arrival 17/01/24 (at Tambatan Pulau Buaya)
SBE, Persiapan lepas tambat
Sbe Prepare Lepas Tambat
Lepas Tambat P.buaya/Continue to Muara Jawa, Eta Muara Jawa
Arrival Muara Jawa
Selesai Gantung Di Barge SB 10
Fwe
Standby waiting info disch (at Anchorage Muara Jawa)
Sbe Prepare Sandar
LepaS Tali dari Barge SB 10
Tiba di MV.GUNALEILA
In position At MV.GUNALEILA
Fwe
Comence Discharge Cargo BG.PB 3016
Completed disch (at Muara Jawa)
Konek Secon Towing
Cast Off fr MV.GUNALEILA Continue Sail to P.Buaya
Arrival Pulau Buaya
Proses Tambat tongkang
Selesai Tambat Di P.Buaya
Fwe
Standby waiting info Over Towing with PB 3028 (at Tambatan Pulau Buaya)
Standby waiting info Pengolongan dibuka (at Tambatan Pulau Buaya)
Over Towing PB 3028 to PB 3016
Dokumen turun dari kapal
SBE
Lepas dari tambatan pulau buaya
Ngolong mahkota 2
Ngolong Mahakam
Passing Yupa Besar, Eta Muara Kaman 21/01/24 16.25 LT
Arrival At Muara Kaman
Clear tambat Fortune M.Kaman
Fwe
Standby waiting info Pos 1 to Semyiur (at Tambatan Fortune)
Sbe persiapan
Lepas tambatan Fortune M.Kaman conti to Kedang kepala
Masuk Alur Kedang kepala to Senyiur, Eta Senyiur 23/01/24 11.30 LT
Arrival Km.99 putar BG.PB 3016
Conti to Jetty BL 3
In Possy Jetty BL 3
Start Loading
Fwe
Finish Loading, Total Cargo 5.227.664 MT
Sbe to BL 1 Assist Dani 46 Connect Barge
Clear Assist D46 to BL 3
Connect 2nd toing BG.PB 3016
Connect Assist Tanjung Pura
Cast Off fr BL 3 Senyiur to CTB penambahan
Arrival at Km.32
Clear tambat Km.32
Fwe
SBE
Cast off dari tambatan km32
Passing KM 15, Eta Muara Kaman 24/01/24 08.30 LT
Bebas alur Kedang kepala
Clear tambat Bawah CTB 1
Fwe
Standby waiting info penambahan cargo (at Tambatan Fortune)
Sbe persiapan
Lepas tambat bawah Ctb 1
In Possy Ctb 1
Comance Loading
Fwe
Sbe connect 2nd toing
Finish Loading, Total Cargo 7.500 MT
Cast Off fr CTB 1 to HB, Eta Harapan Baru 26/01/24 06.00 LT
Ngolong Jemb Tenggarong
Ngolong jemb Mahulu
Arrival harapan Baru
Ngapung2 Running, Cont antrian Pengolongan Jemb Mahakam
Proses tambat
Tambatan Fery" Harapan Baru
Fwe
Sbe persiapan lepas Tambatan Fery" Harapan Baru
Lepas Tambat Fery" Harapan baru
Ngolong Jemb Mahakam
Ngolong Jemb Mahkota ll conti to Muara jawa, Eta Muara Jawa 28/01/24 09.30 LT
Arrival area M.jawa
In possy MV.Nur Awilia M.Jawa
Fwe
Standby waiting Commenced disch (at Muara Jawa)
Star Disch Mv. Nur Awliya
Sbe persiapan
Finish Bongkar
Cast off fr MV.Nur Awlia Muara Jawa
Dokumen on board conti to Samarinda Pulau Buaya, Eta Pulau Buaya 29/01/24 07.30 LT
passing buoy 16, Eta Pulau Buaya 08.15 LT
Arrival se'i Mariam
Clear tambatan P.Buaya
Fwe
Sbe
clear tambat docking Syukur p.atas
Fwe
Connect Bg.PB 3037 galangan Syukur p.atas
clear tambat BG.PB 3036 docking Syukur p.atas lanjut
Sandar Beaching
Fwe
OT Sanle 29 - PB 3016 & Sanle 25 - PB 3037 menjadi Sanle 29 - PB 3037 & Sanle 25 - PB 3016
Slsai bongkar
SBE, connect 2nd towing
Cast off dr MV Mubasyir
Tiba dock syukur
Sanle 29 connect di tongkang
Ikat di Jetty dock
FWE
Slsai tambat tongkang
OT Sanle 25 - PB 3037 & Sanle 29 - PB 3016 menjadi Sanle 25 - PB 3016 & Sanle 29 - PB 3037
Standby waiting pengolongan naik dibuka (at Anchorage TPK Palaran)
SBE, persiapan lepas tambat
Lepas tambat p.buaya
Lanjut naik to m. Kaman
Pengolongan mahkota 2
Pengolongan Mahakam
Pandu alam on board
Dokumen diambil agen
Pengolongan Mahulu, ETA muara Kaman 31/01/24 16.00 LT
Passing Tg Harapan, ETA muara Kaman 31/01/24 16.00 LT
Tiba muara Kaman
Tambat di tambatan Fortune
FWE
proses ganti 2nd towing
SBE, lepas tambatan Fortune
Masuk alur Kedang kepala, ETA Senyiur 01/02/24 17.00 LT
Sailing empty to Senyiur, Eta Senyiur 01/02/24 15.00 LT
SBE, proses tambatkan tongkang di km 99
Slsai tambatkan tongkang, kapal bergerak turun mengikuti WGM 202 ke tempat tambat
menjemput PB 3016
Sailing Load to Muara Kaman, Eta Muara Kaman 02/02/24 16.30 LT
SBE, connect 2nd towing Tk. PB 3016
Lepas tambat km 80 turun ke muara kaman
Bebas muara Kedang kepala
Proses tambat di MKP
Slsai tambat
FWE
Start Engine
Lepas tambat
Inposition CTB 1
Start loading
FWE
Complete loading, Total Cargo 7.500 MT
SBE, persiapan cast off
Cast off dari CTB 1
Tiba harapan baru
Proses tambat
Slsai tambat
FWE
Proses pengolongan Jemb Mahakam
SBE, lepas tambat Loa buah
Apung² antri pengolongan
Pengolongan Mahakam
Pengolongan mahkota 2 Lanjut to muara Jawa, ETA Muara jawa, 05/01/24 09.30 LT
Tiba muara Jawa
Drop jangkar kapal
FWE, Standy waiting info disch (at Anchorage Muara Jawa)
Standy waiting info disch (at Anchorage Muara Jawa)
SBE, hibob jangkar
Jangkar up, to MV. Gunaleila
Tiba MV proses longside
Inposition
FWE
Start Disch
Disch Progress 25% (at Muara Jawa)
Selesai bongkar
SBE, connect 2nd towing
Cast off dr MV Gunaleila
Tiba pulau buaya
Tambat di pulau buaya
FWE (at Tambatan Pulau Buaya)
SBE, lepas tambat p. Buaya
Lanjut naik pengolongan
SBE, lepas tambat p. Buaya
Lanjut naik pengolongan
Pengolongan mahkota 2
Pengolongan Mahakam
Dokumen diambil agen
Pengolongan Mahulu, ETA Muara Kaman 10/02/24 10.30 LT
Passing Ulak Besar, ETA Muara Kaman 10/02/24 10.30 LT
Tiba muara Kaman
Survey pos 1
Assist connect/ POB
Masuk alur Kedang kepala
Tiba senyiur km 99
Putar tongkang PB 3016
Proses longside di BL3
Inposition
Start loading
FWE (at Jetty Senyiur)
Complete loading, Total Cargo 7.500 MT
SBE, connect 2nd towing
Cast off dr Jetty BL3 to muara Kaman
Tambat di km 23
FWE
SBE, lepas tambat km 23 to muara Kaman, ETA Muara Kaman 12/02/24 10.00 LT
Bebas alur Kedang kepala
Melintang muara Kaman
Pengolongan tenggarong
Pengolongan mahulu
Proses tambat
Tambat di loa buah
FWE
Standby waiting antrian Pengolongan Jembt Mahakam
SBE, lepas tambat loa buah turun pengolongan
Dokumen on board
Pengolongan Mahakam
Pengolongan mahkota 2
Tiba tambatan pulau buaya
Slsai tambat di pulau buaya
FWE
Standby waiting info vessel, Est 15/02/24 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Est 20/02/24 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Est 20/02/24 (at Tambatan Pulau Buaya)
Standby waiting info vessel, Est 20/02/24 (at Tambatan Pulau Buaya)
SBE, persiapan lepas tambat
Lepas tambatan buaya
Lanjut to muara Jawam ETA Muara Jawa 19/02/24 03.00 LT
SBE, persiapan lepas tambat
Lepas tambatan buaya
Lanjut to muara Jawam ETA Muara Jawa 19/02/24 03.00 LT
Tiba muara Jawa
Drop jangkar kapal
FWE
Standby waiting info disch (at Anchorage Muara Jawa)
Standby waiting info disch (at Anchorage Muara Jawa)
SBE, hibob jangkar
Jangkar up to MV. RAFA
Tiba di MV RAFA
WGM 202 connect
Proses longside
Inposition
WGM 202 disconnect
FWE, Standby waiting info disch (at Muara Jawa)
Commence discharge
Clear discharge
SBE, connect 2nd towing
Cast off dari MV. Rafa
Drop jangkar kapal
Standby waiting info doc Onboard (at Anchorage Muara Jawa)
Dokumen on board
SBE, hibob jangkar
Jangkar up, lanjut to Samarinda
Tiba pulau buaya
Tambat di sumber mas, Kapal ke tmpat bunker
Ikat di tmpat bunker
FWE, Start Bunker HSD
Finish Bunker HSD 15.000 Ltr
Standby waiting info pengolongan dibuka
SBE, lepas tmpat bunker to tambatan sumber mas
Tiba tambatan connect 2nd towing
Lepas tambat naik pengolongan
Pengolongan mahkota 2
Pengolongan Mahakam
Pengolongan Mahulu, ETA Muara Kaman 24/02/24 16.00 LT
Passing Kp Serbuk Kayu, Eta Muara Kaman 24/02/24 12.00 LT
Tiba muara Kaman
Tambat di tambatan Fortune
FWE
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
Standby waiting info Pos 1 to Senyiur (at Tambatan Fortune)
SBE, lepas tambat persiapan sandar
Tiba CTB 2 proses longside
Inposition
FWE
Commence loading (at CTB 2)
SBE, connect 2nd towing
Finish loading, Total Cargo 7.500 MT
Cast off from CTB 2
Passing muara Kaman, ETA Samarinda 10/03/24 09.00 LT
Pengolongan tenggarong
Passing loa buah, ETA Samarinda 10/03/24 09.00 LT
Pengolongan mahulu
Putar tongkang proses tambat
Slsai tambat di Loa buah, 00° 33. 040' S / 117° 04. 918' E
FWE
Finish UnLoading
Sbe Connect 2nd toing
Cast off fr MV.Mubashir M.Jawa To Pulau Buaya, Eta Pulau Buaya 11/03/24 08.00 LT
Prosess antrian pengolongan Mahakam
Lanjut to muara jawa
Dokumen on board
Pengolongan Mahakam
Pengolongan mahkota 2, ETA Muara jawa 12/03/24 08.00 LT
5 NM to Muara Jawa, ETA Muara jawa 12/03/24 09.00 LT
SBE, lanjut ke muara jawa
Tiba muara Jawa to MV. LGH PROSPER
Dokumen diambil agen
Proses longside
Inposition
FWE
Commence discharge
Completed disch
Cast off fm vessel to Anchorage Area
Standby waiting doc (at Anchorage Muara Jawa)
Dokumen on board Lanjut to Samarinda
Tiba pulau buaya
Slsai tambat di pulau buaya
FWE
Start Bunker HSD
Bunker HSD 30 KL
SBE, kapal ke Kutai lama
Ikat di tmpat Supply air tawar
FWE
Start isi FW
Selesai Isi FW 53 ton
SBE, kapal balik ke Pulau buaya
Kapal ikat samping tongkang
FWE, Standby waiting pengolongan dibuka (at Pulau Buaya)
Dokumen diambil agen
SBE, lepas tambatan p. buaya
Lanjut to pengolongan jembatan
Dokumen diambil agen
SBE, lepas tambatan p. buaya
Lanjut pengolongan jembatan
Pengolongan mahkota 2
Pengolongan Mahakam
Pengolongan mahulu Lanjut to rembayan, ETA Rembayan 17/03/24 02.00 LT
Passing Kp Sebulu, ETA Rembayan 17/03/24 02.00 LT
Passing kuyung, ETA Rembayan 17/03/24 06.00 LT
Tiba Jetty MBL area
Drop crew di tongkang proses tambat
Slsai tambat di atas Jetty MBL
Kapal ikat di tambatan
FWE, Standby waiting info Loading (at Tambatan Jt MBL)
SBE, lepas tambat to Jetty MBL
Proses longside
Inposition
Kapal ikat di buritan tongkang
FWE
Start loading
Muatan sekitar 50% (at Jetty MBL)
Complete loading, Total Cargo 7,405.924 MT
Cast off dr Jetty MBL to Samarinda, ETA harapan baru 21/03/24 03.00 LT
Passing Jemb Liang, Eta Harapan Baru 20/03/24 04.00 LT
Pengolongan tenggarong
Pengolongan Mahulu
Proses tambat di loa buah
Slsai tambat di tambatan arayan loa buah
FWE
Standby waiting Pengolongan Jembt Mahakam dibuka (at Tambatan Loa Buah)
SBE, lepas tambat loa buah
Pengolongan Mahakam
Pengolongan mahkota 2 lanjut to muara Berau, ETA Muara Berau 22/03/24 06.00 LT
Passing Buoy 11, ETA Muara Berau 21/03/24 06.00 LT
Pendekkan tali towing lanjut to tempat berlabuh/MV African leopard
Arrival muara Berau to MV African Leopard
Drop crew at barge
Proses longside
Inposition
FWE
Commence discharge
Finish discharge
SBE, connect seken towing
Cast off dr MV African Leopard to Samarinda, ETA pulau buaya 23/03/24 19.00 LT
Tiba pulau buaya
Proses tambat tongkang
Slsai tambat tongkang
FWE
Standby waiting info Pengolongan Jemb Mahakam dibuka (at Tambatan Pulau Buaya)
SBE, lepas tambat pulau buaya
Lanjut pengolongan jembatan
Pengolongan mahkota 2
Pengolongan Mahakam
Pengolongan mahulu, ETA Muara Kaman 25/03/24 14.00 LT
Passing Rantau Empang, ETA Muara Kaman 25/03/24 14.00 LT
Arrival muara Kaman
Tambat di muara kaman
FWE
Standby waiting info Pos 1 (at Tambatan Muara Kaman)
HSD
765
32,590
17,550
TIME SHEET
NAMA KAPAL : TB. PRIME 162 / PB 3020
DESCRIPTION
DESCRIPTION
DESCRIPTION
DESCRIPTION
Document on board
Start M/E
Hibob jangkar
Jangkar UP
Full away
Passing Tanjung Uban Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing P Lingga, Sailing empty to POL Kolaka From Batam,ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Pangkal Pinang, Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Tg Pandan ,Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Pulau Belitung, Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Kuala Jelai Kalbar, Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Pangkalan Bun, Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Pagatan, Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Kandangan, Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Pulau Matasiri, Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:00 LT
Passing Pulau Matasiri (Shelter Bad Weather), Sailing empty to POL Kolaka From Batam, ETA Lasusua Kolaka 21.07.2023 at 02:
06:00 Passing Pulau Matasiri (Shelter Bad Weather), Sailing empty to POL Kolaka From Batam,
06:00 Passing Pulau Matasiri (Shelter Bad Weather), Sailing empty to POL Kolaka From Batam,
Start M.E ( Pindah Tempat Shelter & Bunker )
Angkat jangkar
Jangkar UP,continue
Panjang towing
Full away to P.laut
Arrival Di IBT area/ P Laut
Pendek tali
Drop crew ke tongkang
Labuh jangkar
Selesai labuh jangkar
Stop M/E
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
09:00 Start ME
09:15 Hibob Jangkar
10:10 Jangkar Up
10:25 Panjang Towing
10:40 Full Away to Lasusua
13:30 Putar Balik / Bad Weather
14:00 Pendek Tali
14:30 Lego Jangkar
15:00 Fwe
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Standby at P Laut Shelter Bad Weather, (Sailing empty to POL Kolaka From Batam)
Star M/E
Angkat Jangkar
Jangkar up
Full Away to Lasusua
Passing Selat Makasar, Sailing empty to POL Kolaka,ETA 05.08.2023 at 18:00 (Sailing empty to POL Kolaka From Batam)
Passing Selat Makasar, Sailing empty to POL Kolaka,ETA 05.08.2023 at 18:00 (Sailing empty to POL Kolaka From Batam)
Passing Selat Makasar Sailing empty to POL Kolaka,ETA 05.08.2023 at 18:00 (Sailing empty to POL Kolaka From Batam)
Passing Jeneponto, Sailing empty to POL Kolaka,ETA 05.08.2023 at 18:00 (Sailing empty to POL Kolaka From Batam)
Passing Balampangi, Sailing empty to POL Kolaka,ETA 05.08.2023 at 18:00 (Sailing empty to POL Kolaka From Batam)
Passing Woimenda, Sailing empty to POL Kolaka,ETA 05.08.2023 at 18:00 (Sailing empty to POL Kolaka From Batam)
Pendek tali towing/drop crew ke tongkang
Lanjut ke area jetty Lasusua
Tiba di area jetty Lasusua
Selesai labuh jangkar
Fwe
Start ME
Angkat jangkar
Jangkar UP/Continue gerak sandar
Berthing
Fwe
at Lasusua Kolaka Utara Waiting Loading
Commence Loading
at Lasusua Loading Progress Progress 47%
Complete Loading, Total Cargo 10.087.278 MT
Waiting Doc Onboard For Departure to POD
Selesai tutup terpal/Start ME
Cast off jetty 2
Panjang tali
Full away to Morowali
Passing Towari, Sailing Load to POD Morowali,ETA 14.08.2023 AM
Passing Selat Tioro, Sailing Load to POD Morowali,ETA 14.08.2023 AM
Passing Selat Rumba, Sailing Load to POD Morowali,ETA 14.08.2023 AM
Passing Matarape, Sailing Load to POD Morowali,ETA 14.08.2023 AM
Arrival Morowali
Selesai labuh jangkar
Fwe
Start ME
Angkat jangkar
Jangkar UP,/Continue to long side jetty
Tiba area jetty/proses sandar
BG.PB 3107 in pos
Fwe
at Morowali Prepare Disch
Overtowing dengan TB.Sanle 26
at Morowali Disch Progress 50%
Completed bongkar.
Cast Off Jetty 19 BDM
Connect Asist TB.BINA MARINE 5
Disconnect Assist
Drop Anchore di area labota.
Fwe / Waiting Bunker and Doc Onboard
SBE, Continue ke tempat Bunker
Tiba di tempat bunker
FWE, Lanjut bunker
SBE, Selesai bunker
Continue ke BG.PB 3107, Lanjut Heave Up jangkar
Document OB
Anchore Up
Panjangkan Tali Towing
Full Away Sailing to Jetty WKM Halmahera, Sailing empty to POL WKM Subaim,ETA 22.08.2023 at 19:54
Passing P Banggai, Sailing empty to POL WKM Subaim,ETA 22.08.2023 at 19:54
Passing Taliabu, Sailing empty to POL WKM Subaim,ETA 22.08.2023 at 19:54
Passing Ternate, Sailing empty to POL WKM Subaim,ETA 22.08.2023 at 19:54
Passing Sidangoli, Sailing empty to POL WKM Subaim,ETA 22.08.2023 at 19:54
Passing Saramaake, Sailing empty to POL WKM Subaim,ETA 22.08.2023 at 11:00
Arrival Jetty WKM Subaim
Anchorage
at Subaim Waiting Berthing & Loading
at Subaim Waiting Berthing & Loading
SBE, Persiapan heave up jangkar
Heave Up jangkar
Anchore Up, Continue ke jetty untuk sandar.
Inpost Sandar di jetty WKM Gate.02
at Subaim Waiting Loading
Commence Loading
at Subaim Loading Progress 35%
at Subaim Loading Progress 80%
at Subaim Loading Progress 95%
Complete Loading, Total Cargo 10.000.544 MT
at Subaim Waiting Doc onboard for depart to POD
SBE Persiapan Cast Off Jetty.
Cast Off Jetty WKM
Drop Anchore
FWE, Standby menunggu Document
SBE, Continue ke Jetty Ambil Document.
Document OB
Continue ke PB 3107
Heave Up jangkar.
Anchore Up
Panjang tali towing.
Full Away Sailing to Weda
Passing Sidangoli, Sailing Load to POD Weda,ETA 01.09.2023 at 07:12
Pendek tali towing, persiapan berlabuh cari tempat berlindung karna cuaca buruk arus kuat dan angin.
Drop Anchore, GPS: 01*.26'.223 N/128*.42'.603"E, Posisi : Teluk Akelamo
Shelter at Sidangoli/Bad Weather
SBE, Persiapan heave up jangkar
Anchore Up
Panjang tali towing
Full Away sailing to Weda
Passing Laut Halmahera, Sailing Load to POD Weda,ETA 02.09.2023 PM
Passing Tanjung Marigapi, Sailing Load to POD Weda,ETA 02.09.2023 PM
Tiba di Weda
Selesai pendek tali towing
Drop Anchore di area berlabuh jetty EOS
FWE
at Weda Waiting Schedule Berthing and Disch
Start Engine persiapan heave up jangkar.
Anchore Up, continue ke jetty EOS.
Assist connect
Inpost sandar beaching
Commence Disch
at Weda Disch Progress 20%
Start M/E Persiapan Cast off jetty
Completed bongkar.
Cast off jetty EOS, Slot.12
Drop anchore di area berlabuh jetty EOS.
Document OB
SBE Persiapan heave up jangkar.
Anchore Up
Panjang tali towing.
Full Away sailing to Subaim jetty WKM.
Passing Patani, Sailing empty to POL Subaim ETA 08.09.2023 at 06:30
Passing Teluk Kau, Sailing empty to POL Subaim ETA 08.09.2023 at 06:30
Arrival Subaim
Selesai Pendek Tali
Berthing
Fwe
at Subaim Prepare Loading
Commence Loading
at Subaim Loading Progress 30%
06:00 at Subaim Loading Progress 60%
06:00 at Subaim Loading Progress 90%
Completed loading, Total Cargo 10.001.141 MT
SBE, Persiapan cast off jetty WKM
Cast off jetty WKM Gate.3
Drop Anchore
FWE,Standby menunggu Document
SBE, Jemput document ke jetty.
Document OB
FWE, Ikat di tongkang PB 3107
SBE, Persiapan heave up jangkar.
Anchore Up
Panjang tali towing
Full Away sailing to Weda, Sailing Load to POD Weda,ETA 15.09.2023 PM
06:00 Passing Teluk Kau, Sailing Load to POD Weda,ETA 15.09.2023 PM
06:00 Passing Laut Halmahera, Sailing Load to POD Weda,ETA 15.09.2023 PM
06:00 Passing Patani, Sailing Load to POD Weda,ETA 15.09.2023 PM
Tiba di Weda area jetty EOS
Selesai pendek tali towing
Surveyor selesai cek Draft
Inpost sandar di jetty EOS Slot.11
Commence Disch
06:00 at Weda Disch Progress 10%
06:00 at Weda Disch Progress 50%
SBE, Persiapan cast off jetty EOS
Completed bongkar
Cast off jetty EOS Slot.1
Drop anchore
Fwe
Surveyor OB
Selesai Final Draft.
at Weda Prepare Repair M/E, Estimate Complete Repair 21.09.2023 PM
at Weda Repair M/E Stbdside & Portside, Estimate Complete Repair 21.09.2023 PM
at Weda Proses Hibob Jangkar and Departure to POL Subaim
SBE, Continue ke tongkang PB.3107, untuk persiapan heave jangkar.
Anchore Up,
Selesai panjang tali towing.
Full Away sailing to Subaim
Passing Sidangoli Timur, Sailing empty to POL Subaim,ETA 24.09.2023 at 05:00
Passing Tg Lelai, Sailing empty to POL Subaim,ETA 24.09.2023 at 05:00
Tiba di area Jetty PT.WKM,Subaim
Selesai pendek tali towing
Continue ke Jetty PT.WKM untuk sandar
Inpost sandar di jetty PT.WKM Gate.3
FWE
at Subaim Prepare Loading
at Subaim Prepare Loading
at Subaim Prepare Loading
Commence Loading
at Subaim Loading Progress 8%
at Subaim Loading Progress 55%
at Subaim Loading Progress 92%
Complete Loading, Total Cargo 10.000.129 MT
at Subaim Prosess Cast Off From Jetty And Prepare Departure to POD Weda
SBE, Persiapan Cast Off Jetty
Cast Off Jetty PT.WKM
Panjang Tali Towing
Full Away Sailing to Weda
Passing Teluk Kau, Sailing Load to POD Weda,ETA 04.10.2023 at 22:30 ETA Weda, Rabu. 04 Oktober 2023 At 22:30
Passing Laut Halmahera Sailing Load to POD Weda,ETA 04.10.2023 at 22:30
Passing Teluk Buli, Sailing Load to POD Weda,ETA 04.10.2023 at 22:30
Tiba di area jetty Yashi Weda
Selesai pendek tali towing
Surveyor tiba cek Draft
Selesai cek draft PB 3107
Berthing
Commence Disch
at Weda Disch Progress 10%
at Weda Disch Progress 98%
Complete Disch
SBE
Document OB
Cast Off
Panjang tali towing
Full Away sailing tu Subaim
Passing Teluk Buli, Sailing empty to POL Subaim,ETA 08.10.2023 07:30
Passing Laut Halmahera, Sailing empty to POL Subaim,ETA 08.10.2023 07:30
Tiba di area jetty WKM Subaim
Selesai pendek tali towing
Drop Anchore
Fwe
at Subaim Waiting berthing and Loading
SBE, Persiapan heave up jangkar
Anchore Up, continue ke jetty PT.WKM
Inpost sandar di jetty Gate.3
Fwe
Commence Loading
at Subaim Loading Progress 40%
at Subaim Loading Progress 95%
Complete Loading, Total Cargo 10.003.533 MT
Sbe, Persiapan cast off jetty PT.WKM
Cast off jetty PT.WKM Gate.3
Panjang tali towing
Full away sailing to Weda, Sailing Load to POD Weda,ETA 14.10.2023 at 16:00
Passing Sidangoli, Sailing Load to POD Weda,ETA 14.10.2023 at 16:00
Passing Pulau Sayafi, Sailing Load to POD Weda,ETA 14.10.2023 at 16:00
Passing Tg Mesa, Sailing Load to POD Weda,ETA 14.10.2023 at 16:00
Tiba di area jetty yashi weda
Selesai pendek tali towing
Surveyor tiba cek draft
Selesai cek draft
Inpost sandar di jetty yashi weda
Start bongkar.
at Weda Disch Progress 55%
SBE, Persiapan cast off jetty yashi
Completed bongkar
Cast off jetty
Surveyor initial draft
Selesai final draft
Panjang tali towing
Full away sailing to PT.WKM Subaim
Passing Patani, Sailing empty to Subaim,ETA 18.10.2023 at 09:00
Passing Laut Halmahera, Sailing empty to Subaim,ETA 18.10.2023 at 09:00
Tiba di area jetty PT.WKM
Selesai pendek tali
Berthing
Commence Loading
at Subaim Loading Progress 65%
Complete Loading, Total Cargo 10.001.760 MT
Final Draft
Waiting Doc Onboard For Depart to POD Weda
SBE,Persiapan cast off jetty PT.WKM
Document OB
Cast off jetty
Panjang tali towing
Full away sailing to Weda
Passing Teluk Kau, Sailing Load to POD Weda,ETA 23.10.2023 at 24:00
Passing Laut Halmahera, Sailing Load to POD Weda,ETA 23.10.2023 at 24:00
Passing Moreala, Sailing Load to POD Weda,ETA 23.10.2023 at 24:00
Arrival Weda
Pendek tali towing
Selesai pendek tali towing
Selesai draft survey
Inpost sandar di jetty EOS slot.11
Fwe
Commence Disch
at Weda Disch Progress 20%
Document OB
Complate bongkar
SBE
Cast off ,from jetty eos slot 11
Surveyor check draf tongkang
Finish check draf
Departure to POL Subaim, Sailing empty to POL Subaim,ETA 27.10.2023 AM
Passing Laut Halmahera, Sailing empty to POL Subaim,ETA 27.10.2023 AM
Passing Teluk Subaim, Sailing empty to POL Subaim,ETA 27.10.2023 at 12:00
Arrival Subaim
Short Towing Line
Anchore
Stop M/E
at Subaim Waiting Berthing and Loading
at Subaim Waiting Berthing and Loading
Start M/E
Hibob Jangkar
Jangkar Up
Assist Connect
Berthing
Assist Disconnect
Stop M/E
Pasang lamdor
Start loading
at Subaim Loading Progress 25%
at Subaim Loading Progress 80%
Complete loading, Total Cargo 10.001.888 MT
Star m/e
Cast off
Anchorage
Fwe
at Subaim Waiting Doc Omboard For Depart to POD
Start M/E
Document OB
Second towing coneck
Hibob jangkar
Jangkar up
Full away to weda
Passing Pulau Tetero, Sailing Load to POD Weda,ETA 04.11.2023 at 23:00
Passing Laut Halmahera, Sailing Load to POD Weda,ETA 04.11.2023 at 23:00
Passing P Muor, Sailing Load to POD Weda,ETA 04.11.2023 at 23:00
Arrival Weda
Pendek tali
Selesai pendek tali
Tiba di depan jetty eos
Selesai Draft Survey
Assist Connect
Berthing
Stop M/E
Commence Disch
at Weda Disch Progress 55%
Document Ob
Complate bongkar
Sbe prepare cast off
Cast off dari jetty eos
Ngapung2 nunggu initial draft
Selesai initial draft
Full away
Passing Moreala, Sailing empty to POL Subaim,ETA 09.11.2023 At 09:00
Passing Laut Halmahera, Sailing empty to POL Subaim,ETA 09.11.2023 At 09:00
Passing Teluk Subaim, Sailing empty to POL Subaim,ETA 09.11.2023 At 09:00
Pendek tali
Selesai pendek tali
Tiba di area jetty wkm
Assist connect Mdm bengkayang
inpos/ sandar di jetty wkm
Assist disconect
Stop M/E
Commence Loading
at Subaim Loading Progress 40%
at Subaim Loading Progress 80%
Complate loading, Total Cargo 10.118.335 MT
Finish draft
Start M/E prepare cast off
Cast off
Prepare start mesin jangkar
Selesai berlabuh jangkar
Stop M/E
at Subaim Waiting Doc Onboard
Start m/e untuk ambil document ke jetty
Document Ob
Second towing connect
Preses up jangkar tongkang
Jangkar up
Full away to weda
Passing Teluk Kau, Sailing Load to POD Weda,ETA 16.11.2023 at 00:20
Passing Laut Halmahera, Sailing Load to POD Weda,ETA 16.11.2023 at 00:20
Passing Patani, Sailing Load to POD Weda,ETA 16.11.2023 at 00:20
Pendek tali
Selesai pendek Tali
Tiba depan jetty eos
Selesai Draft Survey
Assist ConnectTb Terus daya 303
inpos in jetty eos slot 8
Assist disconeck
Start Bongkar
Next asisi Tb perkasa /Bg Mega armada 1
Tali coneck di Tk Mega armada 1
Tali disconeck from Tk mega armada 1
Stop M/E
Commence Disch
at Weda Disch Progress 20%
Complate bongkar
Start m/e prepare cash off
Cast off from jetty eos slot 8
Selesai Berlabuh
Stop m/e
Document Onboard, At Weda Prepare Departure to POL Subaim
Document Ob
Start M/E
Jangkar Up
Full away to subaim
Passing P Muor, Sailing empty to POL Subaim,ETA 19.11.2023 at 15:00
Passing Teluk Subaim, Sailing empty to POL Subaim,ETA 19.11.2023 at 15:00
Pendek tali
Selesai pendek tali
Tiba diarea jetty wkm
Kapal melambung antar crew ke Tongkang
Prepare start mesin jangkar untuk berlabu
Selesai berlabu jangkar
Stop M/E
at Subaim Waiting Berthing And Loading
at Subaim Waiting Berthing And Loading
Sbe prepare longside
At jangkar
Asis coneck Tb bengkayang
inpos
Asis disconeck
Fwe
Commence Loading
at Subaim Loading Progress 25%
at Subaim Loading Progress 80%
Complete Loading, Total Cargo 10.025.745 MT
Sbe prepare cast off from jetty wkm
Cast off
Drof anchor
Fwe
Sbe prepare take document to jetty wkm
Dob
Second towing connect
Prepare up anchor
Anchor up
Full away to weda
Passing Teluk Kau, Sailing Load to POD Weda,ETA 27.11.2023 at 08:00
Passing Laut Halmahera, Sailing Load to POD Weda,ETA 27.11.2023 at 08:00
Passing Pulau Sayafi, Sailing Load to POD Weda,ETA 27.11.2023 at 08:00
Tiba di area jetty eos
Pendek tali
Selesai pendek tali
Selesai initial draft
Asis coneck Tb mimi 02
Inpos di slot 8 jetty eos
Asis diconeck
Stop M/E
Start bongkar
at Weda Disch Progress 60%
complate bongkar
Cast off dari jetty eos slot 8
Drof anchor
Fwe
Dob
Start M/E
Prepare up anchor
Anchor up
Full away
Passing Patani, Sailing empty to POL Subaim,ETA 01.12.2023 at 03:00
Passing Laut Halmahera, Sailing empty to POL Subaim,ETA 01.12.2023 at 03:00
Tiba di Subaim,Jetty WKM
Proses pendek tali
Selesai pendek tali
Selesai berlabu
Fwe
at Subaim Waiting Berthing And Loading
at Subaim Waiting Berthing And Loading
at Subaim Waiting Berthing And Loading
Sbe
Prepare up anchor
Anchor up
Asis coneck Tb bengkayang
inposition in slot 2
Asisst disconnect
Fwe
Commence Loading
at Subaim Loading Progress 35%
at Subaim Loading Progress 85%
Complete Loading, Total Cargo 10.005.425 MT
at Subaim Waiting Doc Onboard For Depart to POD
Document Onboard
Sbe
Coneck second towing
Prepare up anchor
Anchor up
Full away to morosi
Passing Morotai, Sailing Load to POD Morosi,ETA 15.12.2023 at 15:00
Passing Laut Halmahera, Sailing Load to POD Morosi,ETA 15.12.2023 at 15:00
Passing Laut Maluku, Sailing Load to POD Morosi,ETA 15.12.2023 at 15:00
Passing Laut Maluku, Sailing Load to POD Morosi,ETA 15.12.2023 at 15:00
Passing Pulau Taliabu, Sailing Load to POD Morosi,ETA 15.12.2023 at 15:00
Passing Laut Banda, Sailing Load to POD Morosi,ETA 15.12.2023 at 15:00
Passing Laut Banda, Sailing Load to POD Morosi,ETA 15.12.2023 at 15:00
Pendek tali
Selesai pendek tali
Tiba at Morosi
Selesai Berlabuh jangkar
Stop M/E
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
at Morosi Waiting Berthing and Disch
Start M/e
Coneck second towing
Proses hibob jangkar
Up jangkar
Assist connect Tb wrp 07 and Tb Buper 3
inposition / sandar at slot 79
Assit disconnect
Fwe/at Morosi Prepare Disch
at Morosi Waiting Disch
at Morosi Waiting Disch
Commence Disch
at Morosi Disch Progress 15%
at Morosi Disch Progress 75%
Complete bongkar
Sbe
Second towing connect
Assist coneck Tb Nrp 07
Cast Off
Assist Disconnect
Anchorage
Fwe
at Morosi Waiting Doc Onboard For Depart to POL
at Morosi Waiting Doc Onboard For Depart to POL
at Morosi Waiting Doc Onboard For Depart to POL
at Morosi Waiting Doc Onboard For Depart to POL
at Morosi Waiting Doc Onboard For Depart to POL
at Morosi Waiting Doc Onboard For Depart to POL
at Morosi Waiting Doc Onboard For Depart to POL
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
at Morosi Waiting info Next Port
Document Onboard
Start M/e
Proses up jangkar
Jangkar up
Full away to kabaena
Passing Selat Tioro, Sailing empty to POL Kabaena ETA 27.01.2024 at 21:00
Arrival Kabaena
Drop anchor
Fwe
at Kabaena Waiting Berthing and Loading
Star m/e
Up jangkar
Assis connect
Sandar di jetty tms 2 ambil lamdor
Cast off
Assist coneck Tb bina merine
Sandar di jetty Tms 1
Assist disconnect
Stop m/e
Connect Rampdoor
Commence Loading
at Tinangea Loading Progress 30%
Complete Loading, Total cargo 10.008.377 MT
Start M/E
Cast Off
Drof anchor
Fwe
Start M/Eprepare ambil document
Kembali ke Tongkang
Up anchor
Full away To morosi
Passing Selat Tioro Sailing Load to POD Morosi,ETA 31.01.2024 at 16:35
Passing Tambeana Sailing Load to POD Morosi,ETA 31.01.2024 at 16:35
Pendek tali
Selesai pendek tali
Tiba depan jetty morosi
Drof achor
Fwe
Start M/E
Proses up anchor
Anchor up
Berthing
Fwe
at Morosi Prepare Disch
Commence Disch
at Morosi Disch Progress 20%
at Morosi Disch Progress 60%
at Morosi Disch Progress 92%
at Morosi Disch Progress 98%
Complate bongkar
Start m/e prepare cash Off
Assist coneck Tb mrp
xCast off from jetty Apn
Full away
Passing Selat Tioro Sailing empty to POL Kabaena,ETA 06.02.2024 at 15:40
Tiba di ob Kabaena
Selesai pendek Tali
Selesai berlabuh
Stop M/E
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
Start M/E
Proses up anchor
up anchor
Asist conect Tb harmony 35
Longside / inposition at Jetty Tms1
Asist disconeck
Fwe
Lamdor coneck
at Kabaena Waiting Loading
Commence Loading
Complete Loading, Total Cargo 10.005.492 MT At Kabaena waiting doc onboard for depart to POD Morosi
Start M/E prepare cast off
Cast off at jetty Tms 1
Drof Anchor
Fwe
Start M/E
Document Onboard
Second Towing conneck
Prepare up Anchor
Anchor up
Full away to morosi
Passing Selat Tioro, Sailing load to POD Morosi,ETA 24.02.2024 at 05:10
Passing Kendari, Sailing load to POD Morosi,ETA 24.02.2024 at 10:00
Arrival morosi
Short Towing Line
Anchorage
Stop M/E
Start M/E
Socond Towing coneck
Prepare up Anchor
Up Anchor
Assist connect
Berthing
Assist Dosconnect
Fwe
at Morosi Waiting Disch
at Morosi Waiting Disch
Commence Disch
at Morosi Disch Progress 27 %
at Morosi Disch Progress 35%
at Morosi Disch Progress 85%
Document Onboard
Complate Disch
Start M/E prepare cast off
Second towing Connect and assit connect
Cast off from jetty apn slot 79
Asist disconnect
Full away To Buli
Passing Selat Tioro, Sailing empty to POL Buli,ETA 06.03 2024 at 00:20
Passing Laut Banda, Sailing empty to POL Buli,ETA 06.03 2024 at 00:20
Passing P Sanana, Sailing empty to POL Buli,ETA 06.03 2024 at 00:20
Passing P Obi, Sailing empty to POL Buli,ETA 06.03 2024 at 00:20
Passing Selat Labuha, Sailing empty to POL Buli,ETA 06.03 2024 at 00:20
Arrival Pakal Buli
Prepare Short towing
Clear short Towing next to anchor area
Drof Anchor
Fwe
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
Start M/E
Prepare up Anchor
Anchor up
Assist Connect Tb ansanus
Berthing at jetty pakal
Asist disconeck
Fwe
Commence Loading
at Buli Loading Progress 25%
at Buli Loading Progress 60%
Complete Loading, Total Cargo 10.059.341 MT
at Buli Waiting Doc Onboard For Depart to POD
Document Onboard
Start M/E
Cast off from jetty pakal
Full away to weda
Passing P Sayafi, Sailing Load to POD Weda,ETA 14.03.2024 at 03:00
Passing Gemaf, Sailing Load to POD Weda,ETA 14.03.2024 at 08:00
Arrival jetty Eos weda
Prepare short towing
Clear short towing
Ngapung2 wait draft survey
Clear Cek draft
Assist Connect Tb mimi L 02
Bg pb 3107 Berthing
Asist disconeck
Fwe
Rampdor Connect / Commence Disch
at Weda Disch Progress 50%
Complate bongkar
Start M/E
Cast of from jetty Eos slot 8
Drop Anchor
Fwe
DOB
Start M/E
Second towing connect
Prepare up Anchor
Anchor up
Full away to bu
Passing Moreala, Sailing empty to POL Buli,ETA 17.03.2024 at 03:00
Passing Moreala, Sailing empty to POL Buli,ETA 17.03.2024 at 08:00
Arrival Buli
Proses short Towing Line
Clear short Towing Line
Drof Anchor
Fwe
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
Start M/e prepare longside
Second towing conneck
prepare up Anchor
Anchor up
Asist Conneck
Inposition / Sandar
Asist disconneck
Fwe
Prepare connect Rampdor
Rampdor connect
at Buli Prepare Loading
Commence Loading
at Buli Loading Progress 70%
HSD
TIME SHEET
NAMA KAPAL : TB. SANLE 27 / PB 3105
DESCRIPTION
DESCRIPTION HSD
DESCRIPTION HSD
DESCRIPTION
Anchore at Pomala ( Trouble Kelistrikan ) Waiting Accu and Electrician For Repair.Estimate Repair Today PM ( Sailing From Las
Anchore at Pomala ( Trouble Kelistrikan ) Accu sudah onboard dan Prosess Perbaikan ( Sailing From Lasusua - Morowali )
Anchore at Pomala ( Trouble Kelistrikan ) Accu sudah onboard dan Prosess Perbaikan ( Sailing From Lasusua - Morowali )
Star M/E continue perjalanan persiapan hibob jangkar
Jangkar Up
Full away to morowali, Saling Load to POD Morowali,ETA 26.08.2023 at 20:00
Passing P Magati, Saling Load to POD Morowali,ETA 26.08.2023 at 20:00
Passing Tampo, Saling Load to POD Morowali,ETA 27.08.2023 at 03:00
Passing Morosi, Saling Load to POD Morowali,ETA 27.08.2023 at 03:00
Passing Morosi, Saling Load to POD Morowali,ETA 27.08.2023 at 09:00
Arrival OB morowali continue pendek tali
Clear pendek tali continue tempat berlabuh
Clear berlabuh Fwe
at Morowali Waiting Schedule Berthing and Disch
at Morowali Trouble Mesin Jangkar tongkang.
Star M/E persiapan sandar at jetty bdm
Arrival di jetty
Inpost di jetty
Fwe
Commence Disch
at Morowali Disch Progress 5%
Star M/E persiapan cast off
Complete Disch
Cast off jetty
Clear berlabuh
Clear ikat at kapal bungker Fwe
Complete Bunker FO
at Morowali,Wait doc onboard & Electrician For Depart to Subaim
at Morowali,Prosess Hibob Jangkar and Prepare Departure to POL Angfang
at Morowali,Prosess Hibob Jangkar and Prepare Departure to POL Angfang
Sbe,Continue Departure to POL Angfang
Star M/E persiapan hibob jangkar to lalampu
Clear hibob
Arrival Ob lalampu continue sandar
Clear sandar di jetty ang fang
Fwe
continue pasang ramdor/Loading
Complete Loading, Cargo Alat Berat Dozer 3 Unit
at Morowali Prosess Replace Crew and Repair Electrical
at Morowali Repair Electrical
Star M/E persiapan Cast off dari jetty
Cast off dari jetty angfang
Full away to wkm
Passing Laut Banda, Sailing Empty to POL Subaim,ETA 13.09.2023 at 06:00
Passing Taliabu, Sailing Empty to POL Subaim,ETA 13.09.2023 at 06:00
Passing Laut Maluku, Sailing Empty to POL Subaim,ETA 13.09.2023 at 06:00
Passing Laut Maluku, Sailing Empty to POL Subaim,ETA 13.09.2023 at 06:00
Passing Ternate, Sailing Empty to POL Subaim,ETA 13.09.2023 at 06:00
Passing Pulau Salangadeke, Sailing Empty to POL Subaim,ETA 13.09.2023 at 06:00
Passing Pulau Teluk Kau, Sailing Empty to POL Subaim,ETA 12.09.2023 at 18:00
Arrival Subaim
Clear Berlabuh jangkar
Fwe
at Subaim Waiting Schedule berthing & Loading
at Subaim Waiting Schedule berthing & Loading
at Subaim Waiting Schedule berthing & Loading
at Subaim Waiting Schedule berthing & Loading
Star M/E hibob jangkar
Jangkar up
inpost jetty clear sandar
FWE
Clear pasang ramdor continue turnkan alat berat
Commence Loading
at Subaim Loading Progress 5%
at Subaim Loading Progress 80%
at Subaim Loading Progress 90%
Complete Loading, Total Cargo 10.500.867 MT
Document Onboard
at Subaim Prepare Departure to POD Weda
Star M/E persiapan cast off
Cast Off dari jetty WKM
Full away to weda
Passing Tg Bobolo, Sailing Load to POD Weda,ETA 23.09.2023 at 07:30
Passing Teluk Kau, Sailing Load to POD Weda,ETA 23.09.2023 at 07:30
Passing Pulau Sayafi, Sailing Load to POD Weda,ETA 23.09.2023 at 07:30
Passing Tg Mesa, Sailing Load to POD Weda,ETA 24.09.2023 at 17:00
Arrival Weda
Pendek Tali
Clear Pendek Tali
Menuju Depan Jetty
Tiba depan Jetty Tunggu Draft Survey
Clear Draft Survey
Berthing
Stop M/E
Clear Pasang Rampdoor
Commence Disch
at Weda Disch Progress 5%
Complete Disch
at Weda Prepare Cast Off
Star M/E persiapan cast off
Cast off
Menuju tempat berlabuh
Drop anchor
Stop M/E
Star M/E persiapn bunker bbm
Arrival tmpat bunker Fwe
at Weda Waiting Bunker FW
Bunker air tawar
Clear bungker air tawar
Documen on board
Star M/E to tongkang
Arrival tongkang
Full away to wkm Subaim
Passing Banemo, Sailing empty to POL Subaim,ETA 30.09.2023 at 15:50 LT
Passing Laut Halmahera , Sailing empty to POL Subaim,ETA 30.09.2023 at 15:50 LT
Passing P Bobale, Sailing empty to POL Subaim,ETA 30.09.2023 at 15:50 LT
Arrival Subaim continue pendek tali
Clear pendek tali continue tempat berlabuh
Clear berlabuh jangkar
Fwe
at Subaim Waiting Berthing and Loading
at Subaim Waiting Berthing and Loading
Star m/e persiapan sandar
Jangkar upp.
Assist connect
Berthing
Fwe
at Subaim Waiting Loading
Commence Loading
at Subaim Loading Progress 20%
at Subaim Loading Progress 65%
at Subaim Loading Progress 99%
Complete Loading, Total Cargo 10.505.676 MT
at Subaim Prepare Departure to POD Weda
Doc onboard
Sbe proses angkt jangkar
Hibob jangkar
Jangkar up
Full away weda, Sailing load to POD Weda,ETA 12.10.2023 at 17:00
Passing Teluk Kau, Sailing load to POD Weda,ETA 12.10.2023 at 17:00
Passing Laut Halmahera, Sailing load to POD Weda,ETA 12.10.2023 at 17:00
Passing Pulau Sajafi, Sailing load to POD Weda,ETA 12.10.2023 at 17:00
Passing Pulau Patani, Sailing load to POD Weda,ETA 13.10.2023 at 06:30
Arrival weda
Persiapan pendek tali
Clear per pendek tali
Arrival jetty yashi
kapal apung"
Draft surve
Clear Draf survey
Asist connect
Bergerak ke jetty
inpoist jetty Get1
FWE
Commence Disch
at Weda Disch Progress 50%
Document on board
Complete Disch
Apung " Didepan jetty nunggu final draf
Gerak ke tempat berlabuh
Selesai berlabuh masih nunggu final draf
Fwe
Sbe persiapan up jangkar
Jangkar up
Full away subaim jetty ara
Passing Moreala, Sailing empty to POL Subaim,ETA 17.10.2023,12:00
Passing Pulau Sayafi, Sailing empty to POL Subaim,ETA 17.10.2023,12:00
Passing Dorosago, Sailing empty to POL Subaim,ETA 17.10.2023,12:00
Tiba di jetty ara
Persiapan pendek tali
Selesai pendek tali
imposisi tk 3305
Fwe
at Subaim Waiting Loading
at Subaim Waiting Loading
at Subaim Waiting Loading
Commence Loading
at Subaim Loading Progress 60%
Complete Loading, Total Cargo 10.502.805 MT
Final Draft
at Subaim Waiting Doc Onboard For Depart to POD
Document onboard
Departure to POD Weda, Sailing Load to POD Weda,ETA 28.10.2023 at 17:00
06:30 Cancel Departure / Trouble Mesin Jangkar
at Subaim Prosess Repair mesin jangkar tongkang,Estimasi Complete Repair Today PM
at Subaim Prosess Repair mesin jangkar tongkang,Estimasi Complete Repair Today PM
at Subaim Prosess Repair mesin jangkar tongkang,
at Subaim Prosess Repair mesin jangkar tongkang,
Panjang Tali
Full Away to Weda, Sailing Load to POD Weda,ETA 02.10.2023 at 15:00
Passing Teluk Akelamo, Sailing Load to POD Weda,ETA 02.10.2023 at 15:00
Passing Laut Halmahera, Sailing Load to POD Weda,ETA 02.11.2023 at 15:00
Passing Patani, Sailing Load to POD Weda,ETA 02.11.2023 at 15:00
Passing Sagea, Sailing Load to POD Weda,ETA 02.11.2023 at 15:00
Arrival Weda
Persiapan pendek tali
Selesai pendek tali
Gerak ke jetty
Tiba di jetty yashi
Apung"tunggu draf survey
Proses menuju jetty yashi, asist connect
inposisi jetty yashi gete 3
Fwe
Commence Disch
at Weda Disch Progress 45%
Complete bongkar
Sbe persiapan crew naik tongkang
Proses tarik tk 3305
Cast off dari jetty yashi slot3
inter medit /final draf
Full away subaim
Passing Moreala, Sailing empty to POL Subaim,ETA 08.11.2023 at 12:00
Passing Pulau Sayafi, Sailing empty to POL Subaim,ETA 08.11.2023 at 12:00
Passing Laut Halmahera, Sailing empty to POL Subaim,ETA 08.11.2023 at 12:00
Pendek tali
Selesai pendek tali continue gerak ke jetty
Tiba di jetty ara
Selesai drop jangkar
at Subaim waiting berthing and loading
Sbe persiapan jangkar up
Asist connet Tb. MDM Batulicin
Jangkar up
Bergerak menuju jetty arah
Tiba jetty arah
asist Disconnet
inposisi jetty arah
FWE
Commence Loading
at Subaim Loading Progress 45%
at Subaim Loading Progress 85%
Complete Loading, Total Cargo 10.531.261 MT
Final Draft
Sbe
Cast off jetty
Berlabuh Jangkar Kapal
at Subaim Waiting Document Onboard
Document Onboard
Sbe,Connect Second towing
Clear jemput crew
proses panjang tali
Full away weda
Passing Teluk Kau, Sailing Load to POD Weda,ETA 14.11 2023 at 07:20
Passing Laut Halmahera, Sailing Load to POD Weda,ETA 14.11 2023 at 07:20
Passing Pulau Muor, Sailing Load to POD Weda,ETA 14.11 2023 at 07:20
Passing Tg Waleh, Sailing Load to POD Weda,ETA 14.11 2023 at 12:00
Pendek tali
Selesai pendek tali continue jetty
Tiba di jetty
Assist Connect
Berthing
Commence Disch
continue menuju TB MDM untuk Assit
Selesai assist disconnect
Fwe kapal tender di
at Weda Disch Progress 40%
Complete Disch
at weda Prepare Cast Off From Jetty and Depart to POL
Complete bongkar
Sbe
Cast off dari jetty
Selesai final draft
Full away subaim
Passing Patani, Sailing Load to POL Subaim,ETA 19.11.2023 at 20:40
Passing Laut Halmahera, Sailing empty to POL Subaim,ETA 19.11.2023 at 20:40
Passing Teluk Kau, Sailing empty to POL Subaim,ETA 19.11.2023 at 20:40
Tiba subaim
Pendek tali
Selesai pendek tali
Continue gerak jetty ara
Naikan crew ke tk 3305
Selesai antar crew ke tk
Connect assist tb. Mdm batulicin
Proses sandar tk 3305
inposisi BG. TGH 3305
Kapal tender Tk 3305 .FWE
Commence Loading
at Subaim Loading Progress 35%
at Subaim Loading Progress 95%
Complete Loading, Total Cargo 10.504,526 MT
Sbe persiapan crew naik keTK
Tali cabang Connect
Cast off dari jetty
Full away weda, Sailing load to POD Weda,ETA 25.11.2023 at 20:40
Passing Teluk Kau, Sailing load to POD Weda,ETA 25.11.2023 at 20:40
Passing Laut Halmahera, Sailing load to POD Weda,ETA 25.11.2023 at 20:40
Passing P Sayafi, Sailing load to POD Weda,ETA 25.11.2023 at 20:40
Passing tg Mesa, Sailing load to POD Weda,ETA 26.11.2023 at 14:00
Proses pendek tali
Selesai pendek tali
Tiba jetty yashi
Proses cek draf
Selesai check draf
Proses drop jangkar
Selesai drop jangkar
Fwe
Sbe proses hidup jangkar
Selesai hibob jangkar
Assist Connet tb. Bengkayang
Assist tb. Tenau Connect
Proses sandarkan TK 3305
Berthing
Fwe
comment disch/at Weda Disch Progress
at Weda Disch Progress 55%
Complete bongkar
Sbe proses naikan crew ke TK 3305
Connect tali cabang buritan
Cast off dr jatty yashi
apung"nunggu draf survey
Proses cek draf
Clear final draf continue panjang tali
Clear panjang tali
Full away subaim
Passing Patani, Sailing empty to POL Subaim,ETA 02.03.2023 at 11:10
Passing Laut Halmahera, Sailing empty to POL Subaim,ETA 02.03.2023 at 11:10
Passing Teluk Subaim, Sailing empty to POL Subaim,ETA 02.03.2023 at 11:10
Tiba subaim
Proses pendek tali
Selesai pendek tali, cari tepat berlabuh
Melambung keTk 3305 naikan cruw
Selesai naikan crew gerak ke jetty
Berthing
Fwe
at Subaim Waiting Loading
Commence Loading
at Subaim Loading Progress 70%
at Subaim Loading Progress 90%
Complete Loading, Total Cargo 10.509.317 MT
at Subaim Waiting Doc Onboard For Depart to POD Weda
at Subaim Waiting Doc Onboard For Depart to POD Weda
at Subaim Waiting Doc Onboard For Depart to POD Weda
at Subaim Waiting Doc Onboard For Depart to POD Weda
Sbe
Doc Onboard
Pasang second towing
Clear hibob jangkar
Gerak maju bebaskan nelayan
Panjang tali
Full awaey weda
Passing Teluk Subaim, Sailing Load to POD Weda,ETA 13.12.2023 at 22:30
Passing Laut Halmahera, Sailing Load to POD Weda,ETA 13.12.2023 at 22:30
Passing Pulau Sayafi, Sailing Load to POD Weda,ETA 13.12.2023 at 22:30
Passing Tg Mesa, Sailing Load to POD Weda,ETA 13.12.2023 at 22:30
Proses pendek tali / Arrival Weda
Selesai pendek tali gerak ke jetty
Tiba jetty yashi
Clear cek draf survey
Assist 1 MDM balikpapan connet
Asssit 2 tb. Nassya connect buritan
inpost jetty yashi slot 4
Fwe
Commence Disch
at Weda Disch Progress 10%
at Weda Disch Progress 10%
Complete Discharge
Connect second towing
Cast off jetty yashi
Tunggu draf survey
Clear cek draf survey
Full away to subaim jetty ara
Passing Banemo, Sailing empty to POL Subaim,ETA 18.12.2023 at 03:00
Passing Wajamli, Sailing empty to POL Buli,ETA 17.12.2023 PM
Arrival Buli
Proses pendek tali
Selesai pendek tali
Proses drop jangkar
Clear drop jangkar
Fwe
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
Sbe
Clear jangkar naik continue ke jetty
Proses sandar
Berthing
Fwe
Commence Loading
at Buli Loading Progress 50%
Complete Loading, Total Cargo 10.527.917 MT
Final Draft
at Buli Waiting doc onboard for depart to POD
Sbe persiapan cruw ke TK 3305
Cast off jetty pakal
Proses lego jangkar
Selesai lego jangkar
Proses kapal melambung
Fwe,kapal tender di TGH 3305
at Buli Proses up jangkar and Prepare departure to POD Weda
SBE
Up Jangkar
Clear Up jangkar
Full away weda
Passing P Muor, Sailing Load to POD Weda,ETA 24.12.2023 at 14:00
Passing Tg Waleh, Sailing Load to POD Weda,ETA 24.12.2023 at 14:00
Proses pendek tali/Arrival Weda
Selesai pendek tali
Tiba jetty yashi
Selesai draft survey
Menuju tempat berlabuh
Antar crew ke TK
Proses lego
Selesai lego
Clear/Fwe
Sbe persiapan angkat jangkar
Selesai angkat jangkar, gerak kejetty
Assist connect MDM Banjar&tb tenau 1
Proses sandar
inpost TGH 3305
Fwe
at Weda Disch Progress 5%
at Weda Disch Progress 70%
Complete Disch
Cast off dari jetty
Connect seken towing TGH 3305 ke Sanle 27 / menuju tempat berlabuh jangkar
Anchorage
at Weda Standby Repair M/E
at Weda Standby Repair M/E,Proses Pengadaan Part
at Weda Standby Repair M/E,Proses Pengadaan Part
at Weda Standby Repair M/E,Proses Pengadaan Part.Estimasi Part Onboard Today PM
at Weda Proses Repair M/E,Estimate Complete Repair Today PM
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Proses Repair M/E
at Weda Conplete Repair and Waiting doc onboard for depart to POL Buli
at Weda Waiting info Next Port
at Weda Waiting info Next Port
at Weda Waiting info Next Port
at Weda Waiting Replace Master For Proses Clearance Out,Estimasi Pengganti Kapten Onboard Today PM.
Start M/E
Lepas pelabuhan umum Weda
Arrival iwip,TGH 3305 Larat dan Lanjut Pencarian
TGH 3305 di Ketemukan
Connect 2nd Towing
Proses hibob jangkar
Selesai hibob jangkar
Departure to POL Sorong
Passing P Gebe, Sailing Empty to POL Sorong,ETA 20.01.2024 at 09:00
Passing P Gag, Sailing Empty to POL Sorong,ETA 20.01.2024 at 09:00
Arrival Sorong
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
at Sorong Waiting Berthing and Loading
Sbe / Pilot Onboard
Berthing
Commence Loading
at Sorong Loading Progress 20%
at Sorong Loading Progress 95%
Complete Loading, Total Cargo 10.536.255 MT
Start M/E
Pilot Onboard
Cast Off
Anchorage
Stop M/E
at Sorong Waiting Doc Onboard For Depart to POD Weda
at Sorong Waiting Doc Onboard For Depart to POD Weda
at Sorong Waiting Doc Onboard For Depart to POD Weda
at Sorong Waiting Doc Onboard For Depart to POD Weda
Document Onboard
Start M/E
Jangkar Up
Full away
Passing Raja Ampat, Sailing empty to POD Weda,ETA 27.02.2024 at 20:00
Passing P Gag, Sailing empty to POD Weda,ETA 27.02.2024 at 20:00
Passing P Gebe, Sailing empty to POD Weda,ETA 27.02.2024 at 20:00
Passing Banemo, Sailing empty to POD Weda,ETA 27.02.2024 at 20:00
Arrival Weda
Pendek tali
Selesai pendek tali
Ngapung2 depan jetty
Proses sandar
Berthing
Stop M/E .At Weda Prepare Disch
Commence Disch
at Weda Disch Progress 40%
at Weda Disch Progress 90%
Complete Disch
Start M/E
Cast Off
Proses berlabuh
Selesai berlabuh
Stop M/E
at Weda Repair M/E & A/E
at Weda Repair M/E & A/E
at Weda Repair M/E & A/E
at Weda Repair M/E & A/E
at Weda Repair M/E & A/E
at Weda Complete Repair And Prepare Departure to POL
Document Onboard
Waiting Bunker FW and Prepare departure to POL
Mulai isi air di pelabuhan umum weda
Selesai isi air
Start me menuju tgh 3305
Tiba di tgh 3305 langsung hibob jangkar
Selesai hibob jangkar
Full away
Passing Moreala, Sailing empty to POL Buli,ETA 11.03.2024 at 16:00
Passing Patani, Sailing empty to POL Buli,ETA 11.03.2024 at 16:00
Passing P Sayafi, Sailing empty to POL Buli,ETA 11.03.2024 at 16:00
Pendek tali
Arrival ob buli
Selesai berlabuh
Stop M/E
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
at Buli Waiting Berthing and Loading
Star M/E
Hibob jangkar
Selesai sandar jetty pakal
Stop M/E
at buli Waiting Loading
at buli Waiting Loading
at buli Waiting Loading
at buli Waiting Loading
Commence Loading
at Buli Loading Progress 45%
Complete Loading, Total cargo 10.533.413 MT
Waiting Doc Onboard For Depart to POD
Preapre Depart to POD Weda
Departure to Weda
Passing P Sayafi, Sailing Load to POD Weda,ETA 25.03.2024 at 24:00
Passing Patani, Sailing Load to POD Weda,ETA 25.03.2024 at 24:00
Passing Gemaf, Sailing Load to POD Weda,ETA 26.03.2024 at 10:00
HSD
TIME SHEET
NAMA KAPAL : TB. PB 241 / PB 3102
2.2024 at 14:30 LT
esik,ETA 13.02.2024 at 14:30 LT
.2024 at 14:30 LT
4.02.2024 at 14:30 LT
DESCRIPTION HSD
DESCRIPTION HSD
DESCRIPTION
DESCRIPTION HSD
at Batam Proses Repair Mesin Jangkar, Schedule onhire dengan Five Star Today PM
at Batam Proses Repair Mesin Jangkar.
at Batam Proses Repair Mesin Jangkar.
at Batam Proses Repair Mesin Jangkar.
at Batam Standby Waiting Tug For Operate
at Batam Proses Clearance out to Lasusua kolaka utara
Depart to POL Lasusua Kolaka Utara
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Continue Sailing Empty, Sailing empty to POL Lasusua Kolaka Utara,ETA 28.12.2023 PM
Arrival OB Kolaka
Short Towing Line
Berthing
Stop M/E
Connect Rampdoor
Commence Loading
at Kolaka Loading Progress 30%
at Kolaka Loading Progress 60%
Complete Loading, Total Cargo 10.004.147 MT
Final Draft
at Kolaka Waiting doc Onboard For Depart to POD
Document Onboard
at Kolaka Waiting Cast off from jetty For Depart to POD
Trouble Mesin Jangkar PB 3108
at Kolaka Proses Repair Mesin Jangkar PB 3108
Start M/E
Proses Panjang Tali
Full Away
Passing Kolaka, Sailung Load to POD Morowali,ETA 06.01.2023 at 15:00
Passing Selat Tioro, Sailing Load to POD Morowali,ETA 06.01.2023 at 15:00
Passing Selat Wowoni, Sailing Load to POD Morowali,ETA 06.01.2023 at 15:00
Passing Motui, Sailing Load to POD Morowali,ETA 06.01.2023 at 15:00
Arrival Morowali
Short Towing Line
Berthing
Commence Disch
Fwe
at Morowali Disch Progress 90%
Complete Disch
Cast Off
Anchorage
Stop M/E
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
at Morowali Standby Waiting info Next Port
Start M/E
Connect Tali
Full Away
Arrival Angfang
Berthing
Stop M/E
at Kodal Waiting Loading
at Kodal Waiting Loading
at Kodal Waiting Loading
at Kodal Waiting Loading
at Kodal Waiting Loading
Commence Laoding
at Kodal Waiting Loading
Complete Loading, total cargo 10.036.623 MT
at Kodal Waiting doc onboard for depart to POD
Sbe
Cast Off
Full Away to Morosi
Passing Motui Sailing Load to POD Morosi,ETA 30.01.2024 at 12:00
Arrival Morosi
Anchorage
Up Anchore
Berthing
at Morosi Waiting Discharging
Commence Disch
at Morosi Discharging Progress 15%
at Morosi Discharging Progress 80%
at Morosi Discharging Progress 80%
at Morosi Discharging Progress 95%
Complete Disch
Cast Off
Full Away to Kabaena
Passing Selat Tioro Sailing empty to POL Kabaena,ETA 05.02.2024 at 10:00
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
at Kabaena waiting berthing and Loading
Sbe
Anchore Up
Berthing
at Kabaena waiting Loading
Commence Loading
at Kabaena waiting Loading
at Kabaena Loading Progress 95%
Complete Loading, Total cargo 10.010.754 MT
Cast Off
Full Away
Passing Selat Tioro Sailing load to POD Morosi,ETA 21.02.2024 at 08:05
Passing Kendari, Sailing load to POD Morosi,ETA 21.02.2024 at 13:05
Arrival Morosi
Anchorage
Anchore Up
Berthing
at Morosi Waiting Disch
at Morosi Waiting Disch
Commence Disch
at Morosi Disch Progress 70%
Complete Disch
Cast Off
Full Away
Passing Selat Wowoni, Sailing empty to POL Kabaena,ETA 25.02 2024 at 22:30
Arrival Kabaena
Anchorage
at Kabaena Waiting Berthing and Loading
at Kabaena Waiting Berthing and Loading
Start M/E
Jangkar Up
Berthing
Commence Loading
at Kabaena Waiting Loading Progress 40%
Complete Loading, Total Cargo 10.008.585 MT
Cast Off
Anchorage
Anchore Up
Full Away
Passing Selat Tioro, Sailing Load to POD Morosi,ETA 01.03.2024 at 11:00
Passing Kendari, Sailing Load to POD Morosi,ETA 01.03.2024 at 11:00
Arrival Morosi
Anchorage
at Morosi Waiting Berthing and Disch
Sbe
Berthing
at Morosi Waiting Disch
at Morosi Waiting Disch
at Morosi Waiting Disch
Sbe
Berthing
Commence Disch
at Morosi Disch Progress 80%
Complete Disch
Sbe,Cast Off
Full Away
Passing Morowali, Sailing empty to POL Kodal,ETA 07.03 2024 at 12:00
Arrival Angfang Kodal
Anchorage
at Kodal Waiting Berthing and Loading
at Kodal Waiting Berthing and Loading
at Kodal Waiting Berthing and Loading
at Kodal Waiting Berthing and Loading
Sbe/Jangkar Up
Berthing
Fwe
at Kodal Waiting Loading
at Kodal Waiting Loading
at Kodal Waiting Loading
at Kodal Waiting Loading
at Kodal Waiting Loading
Commence Loading
at Kodal Loading Progress 20%
at Kodal Loading Progress 60%
at Kodal Loading Progress 80%
at Kodal Loading Progress 85%
at Kodal Loading Progress 90%
Complete Loading, total cargo 10.014.439 MT
Cast Off
00:30 Full Away
Passing P Dua, Sailing Load to POD Morosi,ETA 22.03.2024 at 22:00
Arrival Morosi
Anchorage
at Morosi Waiting Berthing and Disch
SBE
Berthing
Commence Disch
at Morosi Disch Progress 25%
at Morosi Disch Progress 70%
at Morosi Disch Progress 95%
TIME SHEET
NAMA KAPAL : TB. TENAU 1 / PB 3003
DESCRIPTION HSD
DESCRIPTION
DESCRIPTION
16,938
16,818
16,558
16,403
16,283
16,163
ng at Dock Orella Gresik)
ng at Dock Orella Gresik)
DESCRIPTION HSD
DESCRIPTION HSD
DESCRIPTION HSD
5 Feb 2024 07.00 hrs Position 03° 55' 660"S / 115° 34' 301"E, Eta Bunati 05/02/24 07.30 LT
08.25 hrs tiba di area BUNATI
08.30 hrs pendek tali
08.55 hrs selesai pendek tali,continue tempat berlabuh
09.40 hrs selesai berlabuh Jangkar
09.50 hrs F.W.E
11.00 hrs Over Towing with WGM 201
6 Feb 2024 01.20 hrs dokumen on board
01.30 hrs S.B.E
01.35 hrs hibob Jangkar
01.55 hrs up Jangkar
02.00 hrs full away to banjarmasin, ETA BANJARMASIN 07/02/24 02.00 LT
07.00 hrs Sailing Lenggang to Banjarmasin
10.00 tiba OB BANJARMASIN
10.30 masuk alur
7 Feb 2024 01.25 selesai sandar di pangkalan
01.30 F.W.E
07.00 Standby waiting next info (at Tambatan Sei Telan)
8 Feb 2024 07.00 Standby waiting next info (at Tambatan Sei Telan)
9 Feb 2024 07.00 Standby waiting next info (at Tambatan Sei Telan)
10 Feb 2024 07.00 Standby waiting next info (at Tambatan Sei Telan)
11 Feb 2024 07.00 Standby waiting next info (at Tambatan Sei Telan)
12 Feb 2024 07.00 Standby waiting next info (at Tambatan Sei Telan)
13 Feb 2024 07.00 Standby waiting next info (at Tambatan Sei Telan)