NO DATE LOCATION OBSERVATION EVIDENCE ACTION TAKEN PIC DUE DATE STATUS EVIDENCE AFTER CORRECTIVE ACTION
End of
Dec, 01 TKI 1 Observed there is no glass Instruct maintenance
9 Maintenance December Close
2021 Workshop 1 case on the spotlights to repair the spotlights
2021
Dec, 01 TKI 1 & 3 There was found no SWL Provide the SWL mark
10 Fabrication Dec 6, 21 Close
2021 Workshop 1 mark on the spreaderbar on the spreaderbar
Instruct to supervisor
There is no flashback to installed flashback End of
Dec, 08 TKI 1,
19 arrestors in portable arrestor to the Fabrication December Close
2022 Workshop 1
cutting machine portable cutting 2021
machine
Propose to make a
Observed the muster point muster point sign
Dec, 08 Middle of
20 TKI 1 & TKI 3 sign has no standard according to PERMEN HSE Team Close
2023 January 22
design as per regulation PUPR-14 tahun 2017
and ISO 7010
Coordinated with
Observed there is no
engineering team to
Dec, 15 TKI 1, design calculation and SWL (Raffrizal)
22 calculated and then 15-Jan-22 Close
2021 Workshop 2. mark on the rack of Engineering
put SWL mark on the
cylinder
rack
Instruct to supervisor
Observed there is no soap
to provide the soap
Dec, 22 TKI 3, water to check leakage of
30 water, and should be Indra Yasril Dec 29, 21 Close
2021 Workshop 1 regulator or valve of
in cylinder storage
cylinder
area
Inform to
maintenance and Indra Yasril /
Dec, 22 TKI 3, It was found the spotlights
31 fabrication to provide Dedi Dec 29, 21 Close
2021 Workshop 1 has no stanchion (leg)
the stanchion of Miswantoni
spotlights
Inform to
Dec, 22 TKI 3, Observed the safety latch Dedi
34 maintenance to repair Dec 29, 21 Close
2021 Workshop 1 has damaged Miswantoni
the safety latch
On the Spot
Jan 6, TKI 3, Observed lever block has Move the lever block
38 Indra Yasril Jan 6, 2022 Action
2022 Workshop 1 not in proper place in the lifting gear rack
(Close)
Observed the hook for use tiger hook with
Jan 6, TKI 3, End of
39 lifting does't have manufacture Indra Yasril Close
2022 Workshop 2 January 2022
manufacture certificate certificate
Inform to transport
Jan 13, TKI 1, Observed the scrap box team and move the
43 Rahmat Jan 17. 2022 Close
2022 Workshop 2 was over capacity scrap box to scrap
area
Coordinated with
Observed there is no
Jan 13, TKI 1, engineering team to Raffrizal End of
44 design calculation for Close
2022 Workshop 2 calculated the cutting (Engineering) January 2022
cutting table
table
Instruct to supervisor
There is no flashback to installed flashback
Jan 27, TKI 3,
51 arrestors in portable arrestor to the Indra Yasril Feb 2, 2022 Close
2026 Workshop 1
cutting machine portable cutting
machine
On the Spot
Jan 27, TKI 3, Observed lever block has Move the lever block
52 Indra Yasril Jan 27, 2022 Action
2027 Workshop 1 not in proper place on the work table
(Close)
Feb 10, TKI 1, Observed the air hose has Instruct maintenance Dedi
55 Feb 16, 2022 Close
2022 Workshop 2 leakage to repair Miswantoni
On the spot
Mar 31, TKI 3, Observed the lighting Instruct electrician to Dedi
75 Mar 31, 2022 action
2022 Workshop 1 cable has no insulation put insulation Miswantoni
(Close)
On the spot
April 7, TKI 3, Observed the manifold air Provide the whip
76 Indra Yasril April 7, 2022 action
2022 Workshop 1 hose has no whip check check on air hose
(Close)
On the spot
April 7, TKI 3, Observed any potential Install the C clamp in
77 Indra Yasril April 7, 2022 action
2022 Workshop 1 collaps of plate girder other side
(Close)
On the spot
April 7, TKI 3, Observed the rubbish Change the rubbish
78 Indra Yasril April 7, 2022 action
2022 Workshop 1 bins has broken bins
(Close)
Coordinated with to
Observed the rack of LPG fabrication to
April 14, TKI 3, Indra Yasril / May 18,
80 still not modified as modified the rack as Close
2022 Workshop 1 Arya M 2022
previous finding per engineering
calculation
Inform to group
leader
It was observed that daily
to remind the On the spot
April 21, TKI 3, checklist of gantry crane Indra Yasril / April 21,
82 operator action
2022 Workshop 1 has no filled up. Romdoni 2022
crane for check (Close)
(TKI-GC-18)
before
start the job
Coordinated with
Observed the bandsaw
May 12, TKI 3, engineering team to End of May
92 table has no SWL and Raffrizal Close
2022 Workshop 3 calculated the 2022
engineering calculation
bandsaw table
Observed the
Covered the
May 12, TKI 3, screen/partition for spark Indra Yasril / End of May
93 screen/partition with On Going
2022 Workshop 2 protection has made by Romdoni 2022
fire blanket