Professional Documents
Culture Documents
Environmental Engineering Project S3 1st Semester 2024
Environmental Engineering Project S3 1st Semester 2024
PROJECT
1. PROJECT BRIEF
Background:
Waste management in South Africa
Project Activities:
The South African government has been working on developing and implementing a National
Waste Management Strategy to address key issues in waste management, including recycling,
landfill management, and public awareness. Various recycling initiatives and programs aim to
increase recycling rates and reduce the amount of waste sent to landfills. These initiatives may
involve partnerships with local communities, businesses, and NGOs. Efforts to improve
landfill management practices, closure of illegal dumpsites, and rehabilitation of degraded
areas continue to be part of waste management activities in South Africa.
QUESTION
Conduct a comprehensive study on the waste management practices at eThekwini municipality
in South Africa. Evaluate the efficiency of waste collection, recycling initiatives, and landfill
management. Provide recommendations for improvement based on your findings.
The technical project report must be typed and not more than 8 pages long.
The following format must be adhered to:
6. Conclusion
Summarize the most important findings and its meanings.
2
7. Source list and method of reference in the text
At the end of the report you have to compile a source list with complete details of the
references used.
The HARVARD METHOD must be used to refer to sources (see Burger, 1992).
Report Structure 20
Format - Technical Report/ Contents/
Introduction/Summary/ Font sizes of paragraphs/Writing
style(language/grammar)
Theoretical correctness Design/Calculations/Methods 40
Complexity 20
Diagrams/Layout drawings/ New technology/ Original work
Comprehensiveness 20
Concise explanation/Description and calculations(no cut
and paste!)/Conclusion & recommendations
Mark 100