Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

Leakage of Heat Exchanger Tube

Caused by Uniform Corrosion


By Eka Febriyanti

WORD COUNT 4772 TIME SUBMITTED 05-MAR-2024 05:51PM


PAPER ID 107343812
1

11

15
18

10
7
12

22

21
12
1
3

20

6
2

19

9
2

5
5
24

23

10
4
3

3
17 5

25

27

16

13

14

26
4

3
Leakage of Heat Exchanger Tube Caused by Uniform
Corrosion
ORIGINALITY REPORT

13%
SIMILARITY INDEX

PRIMARY SOURCES

1 catalog.lib.kyushu-u.ac.jp
Internet 63 words — 2%
2 Guofu Ou, Youjie Gu, Chenyang Yu, Haozhe Jin.
"Failure Analysis of Ammonium Chloride Salt
60 words — 2%
Coagulation Corrosion of U-tube Heat Exchanger in Diesel
Hydrogenation Unit", Engineering Failure Analysis, 2022
Crossref

3 Xiuyun Wang, Lijie Qiao, Lei Zhang. "Analysis of the


Causes of the Cracking of Tube Bundles of 316L
55 words — 1%
Stainless Steel Shell-and-Tube Heat Exchanger", Engineering
Failure Analysis, 2022
Crossref

4 Samroeng Netpu, Sorasutee Buapool. "Fatigue


Failure of the Input Shaft Used in Gearbox", Journal
36 words — 1%
of Failure Analysis and Prevention, 2023
Crossref

5 Jin-hui Zhai, Bei-bei Sun, Yang Zhou. "Failure analysis


on 304 stainless steel tube of semi water gas
29 words — 1%
preheater in coal chemical plant", Engineering Failure Analysis,
2021
Crossref
6 Shijie Liu, Haomin Wu, Qinxin Zhao, Zhiyuan Liang.
"Corrosion failure analysis of the heat exchanger in a
27 words — 1%
hot water heating boiler", Engineering Failure Analysis, 2022
Crossref

7 Milad Rezaei, Zeynab Mahidashti, Sajad Eftekhari,


Ehsan Abdi. "A corrosion failure analysis of heat
22 words — 1%
exchanger tubes operating in petrochemical refinery",
Engineering Failure Analysis, 2021
Crossref

8 link.springer.com
Internet 20 words — 1%
9 Jancler Adriano Pereira Nicacio, Fernando Castro
Oliveira, Marcello Rosa Dumont. "Failure analysis
16 words — < 1%
and electrochemical testing of ammonium chloride corrosion in
a heat exchanger in a diesel hydrotreating unit of a petroleum
refinery", Engineering Failure Analysis, 2024
Crossref

10 Si-Yuan Ma, Tong-Tong Bi, Yi Gong, Zhen-Guo


Yang. "Failure analysis on abnormal leakage of
16 words — < 1%
shell and tube heat exchanger in specialty chemical plant",
Engineering Failure Analysis, 2022
Crossref

11 www.tj.kyushu-u.ac.jp
Internet 14 words — < 1%
12 Ritesh Kumar Mallick, Manojit Ghosh, Abbas
Bahrami, Vahid Esmaeili. "Stress relaxation
13 words — < 1%
cracking failure in heat exchanger connection pipes in a
petrochemical plant", Engineering Failure Analysis, 2023
Crossref

13 pdfcookie.com
< 1%
Internet
12 words —

14 d-nb.info
Internet 11 words — < 1%
15 jurnal.unitri.ac.id
Internet 11 words — < 1%
16 Zapata, A.. "Evaluation of operating parameters
involved in solar photo-Fenton treatment of
10 words — < 1%
wastewater: Interdependence of initial pollutant concentration,
temperature and iron concentration", Applied Catalysis B,
Environmental, 20100609
Crossref

17 Chien-Chou Weng, Mei-Jiau Huang. "A simulation


study of automotive waste heat recovery using a
9 words — < 1%
thermoelectric power generator", International Journal of
Thermal Sciences, 2013
Crossref

18 Kapil Kumar Gupta, Rouhollah Yazdi, Mathias


Styrk-Geisler, Oleg V. Mishin, Rajan Ambat. " Effect
9 words — < 1%
of Microstructure of Low-Alloy Steel on Corrosion Propagation
in a Simulated CO Environment ", Journal of The
Electrochemical Society, 2022
Crossref

19 Suwarno Suwarno, Abdul Jabar I'jazurrohman,


Fajar Dwi Yudanto, Vivien S. Djanali. "Failure
9 words — < 1%
analysis of waste heat boiler tubing caused by a high local heat
flux", Engineering Failure Analysis, 2022
Crossref

20 Wei Hu, Song Xue, Hongchen Gao, Qiqi He, Rui


Deng, Shaoxiang He, Minglong Xu, Zenong Li.
9 words — < 1%
"Leakage failure analysis on water wall pipes of an ultra-
supercritical boiler", Engineering Failure Analysis, 2023
Crossref

21 Dinu Thomas Thekkuden, Abdel-Hamid Ismail


Mourad, Abdel-Hakim Bouzid. "Failures and leak
8 words — < 1%
inspection techniques of tube-to-tubesheet joints: A review",
Engineering Failure Analysis, 2021
Crossref

22 K. Chandra, Vivekanand Kain, S.K. Sinha, H.G.


Gujar. "Metallurgical investigation of a heat-
8 words — < 1%
exchanger tube of 70/30 cupronickel failed by fretting
corrosion", Engineering Failure Analysis, 2020
Crossref

23 Khalil Ranjbar, Emad Sharifi. "Failure Assessment of


Heat Exchanger Tubes Due to Grooving
8 words — < 1%
Corrosion", Journal of Failure Analysis and Prevention, 2023
Crossref

24 Marvin B. Schaffer. "Nuclear power for the twenty‐


first century", Foresight, 2003
8 words — < 1%
Crossref

25 www.mechanicaljournals.com
Internet 8 words — < 1%
26 www.researchgate.net
Internet 8 words — < 1%
27 H. X. Hu, Y. G. Zheng, Y. M. Zhang, C. Niu. "Failure
Analysis of a Reboiler in the Waste Water Stripping
7 words — < 1%
Tower of a Petrochemical Plant", Journal of Failure Analysis and
Prevention, 2015
Crossref
EXCLUDE QUOTES ON EXCLUDE SOURCES OFF
EXCLUDE BIBLIOGRAPHY ON EXCLUDE MATCHES OFF

You might also like