Professional Documents
Culture Documents
Corrigendum 6 NIT231
Corrigendum 6 NIT231
Sub: - Construction of line / covered Drain, Street light Service Road, Foot Over Bridge Pedestrian
Guided Rail , Slope Protection and Safety items on Four Laning of Bhojpur to Buxar Section from Km.
27.370 to Km. 75.000 of NH-84 (Design Chainage Km. 77.100 to Km. 125.000) (Design Length- 47.900
Km.) in the State of Bihar on EPC Mode