Letter No Regarding Proposal of Boundary Wall 1

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

REF: GIS/BRO/CL-9/AE/2023-24/ Date:

TO,
The Project Director
HQ, 45 BRTF
C/O 56 APO
PIN – 930045.

Subject: “Construction and improvement of Road Bakhasar-Mavasari from


Km 0.00 to Km 32.49 (Design Length=31.703 Km) from existing CL-9
specification to NHDL specification under 45 BRTF of Project Chetak in
Rajasthan and Gujarat State" – Regarding Proposal of Boundary Wall.

Ref: -
1. MKCIL/BM-Road/BRO/2022-23/282, Dated 08.03.2024
2. Your Letter No 90030/CA-CTK-01/22-23/B-3/63/EPC, Dated
02.04.2024

Dear Sir,
We are in receipt of letter reference no. (1) 90030/CA-CTK-01/22-23/B-
M/63/EPC & (2) MKCIL/BM-Road/BRO/2022-23/282, regarding proposal
of boundary wall, we have reviewed the proposal and our comments are as
below:

1. Now days it is common practice in NHAI Greenfield Projects involves the


installation of boundary walls within the Right of Way (ROW).

2. Safety: Boundary walls serve as robust barriers, significantly reducing the


risk of accidents by preventing unauthorized access to the highway. This
ensures the safety of both motorists and pedestrians, promoting secure
passage along the roadway. It prevents animal and other unauthorized
vehicles entry in main carriageway.

3. Aesthetic Enhancement: well-designed boundary walls can contribute to


the overall aesthetic appeal of the project surroundings, by integrating
landscaping elements into the wall design, visually pleasing boundaries can
be create that complement the surrounding environment and enhance the
overall project aesthetics.
1 | Page
4. Optimization Land Use and preventing encroachment: Boundary walls
provides the boundaries of the highway ROW, optimizing land use and
preventing encroachments onto the designated right-of-way. This ensures
that the highway corridor remains unobstructed and allows for efficient
maintenance and expansion of the transportation network as needed in the
future.
By providing the Boundary walls into ROW aligns to prioritizing safety,
security in all aspects of the project.

We are forwarding the proposal submitted contractor for further necessary


action from your end.

This is for your information and necessary action please.

Assuring you our best services all the times.


With best regards.

Authorized Signatory

For Global Infra Solutions


Sukh Sagar apartment,
Trilanga Bhopal, MP

Copy:
1. , HQ, Chief Engineer Project Chetak Pin – 931707 For kind information
please

2 | Page

You might also like