COST ESTIMATES OF MATERIALS

S/N DESCRIPTION QTY GATE HOUSE, SUITES + TOTAL N


CHANGE ROD N

1 REINFORCEMENT BARS
(ROD)

a 20mm 10pcs 7,200 72,200

b 16mm 614 pcs 4,900 3,008,600

c 12mm 2,789pc 2,900 8,088,100

b 10mm 123pcs 2,100 258,300

e 8mm 290pcs 1,500 435,000

TOTAL 11,862,200

f BRC Mesh 25rolls 20,000 500,000

G Nails 25bags 10,000 150,000

h Binding Wire 5pcs 10,000 50,000

TOTAL 700,000

2 BLOCKS

a 9” 6300 280 1,764,000

b 6” 23,500 180 4,230,000

TOTAL 5,994,000

3 CEMENT 2530 3,800 9,614,000

4 GRANITE 39 Trips 270,000 10,530,000

5 SAND 34 Trips 30,000 1,020,000

TOTAL 11,550,000

6 WOODS (PLANKS)

a 2x3 930 400 372,000

b 1x12 2,370 1300 3,081,000


TOTAL 3,453,000

GRAND TOTAL 43,052,700

LABOUR 11,000,000

GRAND TOTAL 54,166,700


COST ESTIMATES OF MATERIALS

S/N DESCRIPTION MAIN GATE SWIMMING FENCE TOTAL


BUILDING HOUSE, POOL
QTY SUITES +
CHANGE
ROD

1 REINFORCEMENT BARS
(ROD)

a 20mm 10 10pcs

b 16mm 614 614 pcs

c 12mm 2,619 50 120 2,789pc

b 10mm 120 1 2 123pcs

e 8mm 270 20 290pcs

f BRC Mesh 25rolls 25rolls

G Nails 15 bags 15bags

h Binding Wire 4 1 5pcs

2 BLOCKS

a 9” 6300 6300pcs

b 6” 18,000 4000 1500 23,500pcs

3 CEMENT 2030 80 1 419 2530bags

4 GRANITE 37 1 1 39 Trips

5 SAND 29Trips 3 2 34 Trips

6 WOODS (PLANKS)

a 2x3 790 40 100 930

b 1x12 1470 600 300 2,370