ATT.1 - Telecom Loads Under UPS & Generator Supply
ATT.1 - Telecom Loads Under UPS & Generator Supply
ATT.1 - Telecom Loads Under UPS & Generator Supply
General Information
Date 16/7/2020
Project Name/ No: QP- New Laboratory
Prepared by : Eng.Islam Kamel
Checked By : Eng. Ahmed Hegy
UPS / Emergency
Switches Load Heat Dissipation
No. System Equipment Power (W) No. of units Total (W) Feed Ref Drawing Ref Room
(W) (BTU/hr)
(Yes/No)
LAB Building
1 Structure Cabling System Data Rack ‐ Passive Components 200 2 400 Yes 4154‐25‐16‐11‐560‐001 TER Room (B1‐GF‐39)
2 Structure Cabling System Data Rack ‐ Ac ve Components 10000 10000 2 20000 Yes 4154‐25‐16‐11‐560‐001 TER Room (B1‐GF‐39)
3 Structure Cabling System Data Rack ‐ Ac ve Components 200 2 400 Yes 4154‐25‐16‐11‐560‐001 TER Room (B1‐GF‐39)
4 CCTV System CCTV Rack 4000 4000 1 4000 Yes Control Room ((B1‐GF‐40)
5 CCTV System Server & NVR 3000 1 3000 Yes Control Room ((B1‐GF‐40)
6 CCTV System Workstation + Screen 1000 1 1000 Yes 4154‐25‐16‐11‐351‐001 Control Room (B1‐GF‐40)
8 CCTV System LED Screen 300 3 900 Yes 4154‐25‐16‐11‐351‐001 Control Room (B1‐GF‐40)
9 Access Control System ACP 200 1 200 No 4154‐25‐16‐11‐451‐001 TER Room (B1‐GF‐39)
10 Access Control System Dual Reader interface Module 200 14 2800 No 4154‐25‐16‐11‐451‐001 _
12 Public Address System PA\GA Rack 1000 1 1000 Yes 4154‐25‐16‐11‐560‐001 TER Room (B1‐GF‐39)
4154‐25‐16‐11‐560‐001,
13 BMS DDC 300 9 2700 No _
4154‐25‐16‐11‐561‐001
14 Audio Video System Audio Visual Rack 1000 2 2000 No 4154‐25‐16‐11‐560‐001 B1‐GF‐41 & B1‐GF‐42
2 Access Control System Dual Reader interface Module 200 2 400 Yes