Integration Test activity –

The Subsystem is THE

Building Management
LEAD of the activity

System For TSS and Wayside shelters the MEP system will be connected directly to the DSPM Integration Test activity –
system delivering the required functionalities. The Subsystem is NOT THE
LEAD of the activity

Energization from LV
System Located in TPS or
from LV System From OCS
LV Power
Electrical Distribution &

PAC DSPM
Lighting

Installation Test of the main Test of the full


IRN PCC PAC DSPM / Electrical
Building Installation Verification Electrical Electrical System in
(PICO)
Elec
Component/Funct.
Elec
one Building
Elec Tests

TSS/ or LV Power
Per main
Wayside Per Building
Component
Shelter
MECAHNICAL, ELECTRICAL, PLUMBING & FIRE LIFE SAFETY (MEP)

HVAC (Air/ Chilled


Water)

Installation Test of the main Test of the full


IRN PCC PAC DSPM / Mechanical AC
Building Installation Verification Mechanical Mechanical System
(PICO)
Mech
Component/Funct.
Mech
in one Building
Mech Tests MEP

TSS/ or LV Power
Per main
Wayside Per Building
Component
Shelter
Per Building
Plumbing & Drainage

Installation Test of the main Test of the full


IRN PCC PAC DSPM / Plumbing
Building Installation Verification Plumbing Plumbing System in
(PICO)
Plmb
Component/Funct.
Plmb
one Building
Plmb Tests

TSS/ or LV Power
Per main
Wayside Per Building
Component
Shelter FLS/Mechanical
Tests
Fire Fighting & Clean

FLS/Electrical DSPM / FLS Tests


Agent Protection

Tests

FLS/Clean Agent
Installation Test of the full FLS
IRN Test of the main FLS PCC PAC
Building Installation Verification System in one
FLS Component/Funct. FLS FLS
(PICO) Building
TSS/ or LV Power Per main FLS/Firefighting
Wayside Component Per Building
Shelter (i.e.: FACP)

MEP Stage 2 MEP Stage 3 MEP Stage 4 MEP Stage 5


T&C Phase 2 T&C Phase 3