Report of Thorough Examination No. 550028-02
Report of Thorough Examination No. 550028-02
Report of Thorough Examination No. 550028-02
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 18. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-07ae6
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9900-P Pad Eye 0.25 AX-2014-1183 Polishing Filter 2 (Wellhead Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9900-P 44 Red Certificate missing 02. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 1 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 18. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-a7d7d
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9720-M Beam 2.00 AX-2014-1164 VFD Building Roof (Wellhead Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9720-M 60 Red Certificate missing 09. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 2 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 15. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-3de55
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9780-M Beam 4.00 AX-2014-1190 Water Injection Pump (Cellar Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9780-M 55 Red Certificate missing 09. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 3 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 15. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-9e8bd
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9770-M Beam 4.00 AX-2014-1191 Water Injection Pump (Cellar Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9770-M 54 Red Certificate missing 09. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 4 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 16. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-bf6f4
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9700-M Beam 5.00 AX-2014-1167 Booster Pump (Wellhead Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9700-M 62 Red Certificate missing 09. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 5 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 31. Dec. 2023 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 30. Dec. 2024 Report number: 202402281256-90db3
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9740-P Pad Eye 0.25 AX-2014-1189 Valve Access Platform (Wellhead Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9740-P 43 Red CERTIFICATE MISSING 31. Dec. 2023 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 6 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 16. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-b621f
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9790-M Beam 4.00 AX-2014-1212 Water Injection Pump (Cellar Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9790-M 56 Red Certificate missing 09. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 7 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 18. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-99519
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9900-M Beam 0.50 AX-2014-1165 Polishing Filter 2 (Wellhead Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9900-M 59 Red Certificate missing 09. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 8 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 15. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-27309
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9760-P Pad Eye 0.50 AX-2014-1222 Water Injection Pump (Cellar Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9760-P 46 Red Certificate missing 02. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 9 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-5bfd0
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9870-M Beam 2.00 AX-2014-1173 VFD Building Stair Porch (Cellar Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9870-M 52 Red Certificate missing 09. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 10 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 08. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-6af4c
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9740-M Beam 2.00 AX-2014-1166 Valve Access Platform (Wellhead Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9740-M 58 Red Certificate missing 09. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 11 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 16. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jul. 2024 Report number: 202402281256-5bc73
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9750 ZLG-5452-2 Trolley & Hoist Chester Hoist 2.00 AX-2014-723 Valve Access Platform (Cellar Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; 08. Oct. 2015
- particulars of any repair, renewal or alteration required to remedy it; See below
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
ZLG-5452-2 57 Red certificate missing 09. Jan. 2024 -
ZLG-5452-2 37 Amber Problems on moving sideways. Maintenance required. 16. Jul. 2015 08. Oct. 2015
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 12 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-5c6ad
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9840 Pad Eye 0.50 AX-2014-1179 Fire Water Pump 1 (Cellar Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9840 51 Red Certificate Missing 02. Jan. 2024 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 13 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 16. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 31. Dec. 2023 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 30. Dec. 2024 Report number: 202402281256-e9b53
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9710-P A Pad Eye 0.25 AX-2014-1187 Booster Pump (Wellhead Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9710-P A 42 Red Certificate missing 31. Dec. 2023 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 14 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 16. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 31. Dec. 2023 NOT safe to operate
The latest date by which the next thorough examination must be carried out: 30. Dec. 2024 Report number: 202402281256-80e4b
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9710-P B Pad Eye 0.25 AX-2014-1186 Booster Pump (Wellhead Deck) C Red
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
58-W-9710-P B 45 Red Certificate messing 31. Dec. 2023 -
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 15 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 08. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 16. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 15. Jan. 2016 Report number: 202402281256-b5b29
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley ZLG-5458-4M Trolley & Hoist Chester Hoist 4.00 AX-2014-1206 Water Injection Pump (Cellar Deck) C Amber
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* See below
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* See below
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; 08. Oct. 2015
- particulars of any repair, renewal or alteration required to remedy it; See below
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Serial# Finding# Status Defect Date Due date
ZLG-5458-4M 24 Amber Problems on moving sideways. Maintenance required. 16. Jul. 2015 08. Oct. 2015
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 16 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jul. 2024 Report number: 202402281256-9defc
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9870 AG-11539-2 Trolley & Hoist Chester Hoist 2.00 AX-2014-1158 VFD Building Stair Porch C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 17 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jul. 2024 Report number: 202402281256-cfe14
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9860 AG-11537-1.5 Trolley & Hoist Chester Hoist 1.50 AX-2014-1159 Sea Water Jockey Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 18 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 07. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 18. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 17. Jan. 2016 Report number: 202402281256-4bde1
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9890 AG-11541-5 Trolley & Hoist Chester Hoist 0.50 AX-2014-1152 Polishing Filter 1 (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 19 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 15. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 14. Jul. 2016 Report number: 202402281256-ce457
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9800-P Pad Eye 0.50 AX-2014-1217 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 20 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 16. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 15. Jul. 2016 Report number: 202402281256-6d93b
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9710-M Beam 2.00 AX-2014-1168 Booster Pump (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 21 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 15. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-29213
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9750-P Pad Eye 0.25 CTTE-1930-26-182 Valve Access Platform (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 22 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 18. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jul. 2024 Report number: 202402281256-433e8
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9900 AG-11543-5 Trolley & Hoist Chester Hoist 0.50 AX-2014-1154 Polishing Filter 2 (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 23 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-2e824
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye PA-58-W-9940-P Pad Eye 4.75 AX-2014-1177 Drill Water Pump 2 (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 24 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: - Date of report: 28. Feb. 2024 Date of Thorough Examination: 08. Nov. 2014 Safe to operate
The latest date by which the next thorough examination must be carried out: 07. May. 2015 Report number: 202402281256-0a6ff
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley ZLG-5459-4M Trolley & Hoist Chester Hoist 4.00 AX-2014-1207 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: gnascimento
To be defined
Client WO:
Page 25 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 08. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 17. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 16. Jan. 2016 Report number: 202402281256-97481
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9880 ZLG-5456-6 Trolley & Hoist Chester Hoist 6.00 AX-2014-1208 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 26 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-85e48
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9860-P Pad Eye 0.25 CTTE-1930-26-161 Sea Water Jockey Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 27 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 15. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-aae42
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9780-P Pad Eye 0.50 CTTE-1930-26-169 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 28 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 08. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 17. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 16. Jan. 2016 Report number: 202402281256-98ed8
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley ZLG-7214 Trolley & Hoist Chester Hoist 6.00 AX-2014-1210 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 29 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-13801
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9910 Pad Eye 3.25 CTTE-1930-26-167 Sea Water Lift Pump 1 (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 30 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 08. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 17. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 16. Jan. 2016 Report number: 202402281256-8f401
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley ZLG-7177 Trolley & Hoist Chester Hoist 4.00 AX-2014-1209 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 31 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-cfcd9
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9860-M Beam 1.50 CTTE-1930-26-183 Sea Water Jockey Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 32 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 17. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 16. Jul. 2016 Report number: 202402281256-e9f5f
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye PA-58-W-9920 Pad Eye 3.25 CTTE-1930-26-159 Sea Water Lift Pump 2 (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 33 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 08. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 17. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 16. Jan. 2016 Report number: 202402281256-2bc21
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9760 ZLG-5454-6 Trolley & Hoist Chester Hoist 6.00 AX-2014-1211 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 34 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-95e27
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9850-P Pad Eye 0.50 AX-2014-1180 Fire Water Pump 2 (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 35 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-2f66f
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9850-M Beam 5.00 CTTE-1930-26-186 Fire Water Pump 2 (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 36 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 15. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-efe98
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9770-P Pad Eye 0.50 AX-2014-1219 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 37 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 16. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 15. Jul. 2016 Report number: 202402281256-4b901
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9700-P Pad Eye 0.50 AX-2014-1188 Booster Pump (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 38 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jul. 2024 Report number: 202402281256-28650
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9700 ZLG 5446-5 Trolley & Hoist Chester Hoist 5.00 AX-2014-1156 Booster Pump (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 39 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 16. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 15. Jul. 2016 Report number: 202402281256-1497e
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9880-M Beam 6.00 AX-2014-1223 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 40 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 16. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 15. Jul. 2016 Report number: 202402281256-4f06b
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9800-M Beam 4.00 AX-2014-1214 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 41 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 17. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 16. Jul. 2016 Report number: 202402281256-0836f
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9870-P Pad Eye 0.25 AX-2014-1182 VFD Building Stair Porch (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 42 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 08. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jul. 2024 Report number: 202402281256-0dad6
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9850 AG-11536-5 Trolley & Hoist Chester Hoist 5.00 AX-2014-1160 Fire Water Pump 1 (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 43 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 15. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 14. Jul. 2016 Report number: 202402281256-7c31f
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9810-P Pad Eye 0.50 AX-2014-1216 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 44 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 16. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 15. Jul. 2016 Report number: 202402281256-ef2e7
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9810-M Beam 6.00 AX-2014-1213 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 45 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 15. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-9cc8e
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9790-P Pad Eye 0.50 AX-2014-1220 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 46 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 18. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jul. 2024 Report number: 202402281256-899bf
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9720 AG-11529-2 Trolley & Hoist Chester Hoist 2.00 AX-2014-1153 VFD Building Roof (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 47 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 18. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-40737
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9720-P Pad Eye 0.50 AX-2014-1185 VFD Building Roof (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 48 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-20f53
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9840-M Beam 5.00 AX-2014-1175 Fire Water Pump 1 (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 49 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 18. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-83514
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9890-P Pad Eye 0.25 CTTE-1930-26-101 Polishing Filter 1 (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 50 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 09. Nov. 2014 Date of report: 28. Feb. 2024 Date of Thorough Examination: 15. Jul. 2015 Safe to operate
The latest date by which the next thorough examination must be carried out: 14. Jul. 2016 Report number: 202402281256-2ffa1
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye 58-W-9880-P Pad Eye 0.50 AX-2014-1215 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: ldaquila
To be defined
Client WO:
Page 51 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jul. 2024 Report number: 202402281256-888e5
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9740 ZLG5450 Trolley & Hoist Chester Hoist 2.00 AX-2014-1155 Valve Access Platform (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 52 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jan. 2025 Report number: 202402281256-f79d4
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Attachment points
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Padeye PA-58-W-9930 Pad Eye 4.75 CTTE-1930-26-164 Drill Water Pump 1 (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 53 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 17. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 02. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 01. Jul. 2024 Report number: 202402281256-70158
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Lifting accessories and lifting components - Lifting accessories
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Trolley PA-58-W-9710 ZLG 5448-2 Trolley & Hoist Chester Hoist 2.00 AX-2014-1157 Booster Pump (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* NONE
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Flavio Henrique Ramos Guerra
To be defined
Client WO:
Page 54 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 15. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-65faf
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9760-M Beam 6.00 AX-2014-1205 Water Injection Pump (Cellar Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* See below
Serial# Finding# Status Defect Date Due
date
58- 53 Green Approved at the behest of Equinor's Pedro Almeida, who requested that all monorails that have no trolley associated with them be 09. Jan. -
W-9760-M considered in their respective manufacturing certificates as "lifting foundations" in accordance with NORSOK R-200 without the need for 2024
a load test every 5 years.
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Augusto Maia
To be defined
Client WO:
Page 55 of 56
Report of Thorough Examination
This report complies with the requirements of the LOLER 1998 SI No 2307
Date of last thorough examination: 18. Jul. 2015 Date of report: 28. Feb. 2024 Date of Thorough Examination: 09. Jan. 2024 Safe to operate
The latest date by which the next thorough examination must be carried out: 08. Jan. 2025 Report number: 202402281256-f709e
The name and address of the employer for whom the thorough examination was made: The address of the premises at which the thorough examination was made:
Equinor ASA - Peregrino A
Groupname and Subgroup name: Foundations and suspensions - Runway beams
Item type Tag# Serial# Description Manufactured SWL/WLL Cert# Location * Status
Fixed beam 58-W-9890-M Beam 0.50 AX-2014-1163 Polishing Filter 1 (Wellhead Deck) C Green
*Was the examination As first examination after installation or Within an interval Within an interval In accordance with an After the occurrence of
carried out: assembly at a new site or location: A of 6 months: B of 12 months: C examination scheme: D exceptional circumstances: E
Is this the first examination after installation or assembly at a new site or location? No
If the answer to the above question is YES has the equipment been installed correctly? -
Identification of any part found to have a defect which is or could become a danger to persons, and a description of the defect; *If none stat NONE* None
Is the above an existing or imminent danger to persons *Note-This is a reportable defect No
Particulars of any repair, renewal or alteration required to remedy a defect found to be a danger to persons; *If none stat NONE* None
In the case of a defect which is not yet but could become a danger to persons
- the time by which it could become such danger; NA
- particulars of any repair, renewal or alteration required to remedy it; NA
Where the thorough examination included testing, particulars of any test; *if none stat NONE* See below
Serial# Finding# Status Defect Date Due
date
58- 61 Green Approved at the behest of Equinor's Pedro Almeida, who requested that all monorails that have no trolley associated with them be 09. Jan. -
W-9890-M considered in their respective manufacturing certificates as "lifting foundations" in accordance with NORSOK R-200 without the need for 2024
a load test every 5 years.
Project number: The name & Qualifications of person making this report: Name of person Authenticating this report on behalf of it’s author:
550028-02 Company Appointed Examiner
PO number: Augusto Maia
To be defined
Client WO:
Page 56 of 56