System Details

kW DC = 18.43 MWp
kW AC = 16.10 MW

8m offset from the


fences for roads

GRID-TIED PV SYSTEM
SITE PLAN - 2
Area for the MV transmission
systems and interconnection
2000sq.m

REVISIONS

1 SITE PLAN
PV-2 SCALE: NTS
PV-2
CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS
GENERAL ELECTRICAL NOTES
CURRENT-CARRYING MAX.
CONT. CURRENT VOLTAGE
ID CONDUCTOR CONDUIT CONDUCTORS IN OCPD EGC LENGTH UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL
CURRENT DROP
(125%)

1 6 SQ.MM PV WIRE, COPPER EMT CONDUIT


CONDUIT

1 N/A 2.5 SQ.MM, COPPER 14.27A 17.83A 200 mtr 1.6%


1 PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED
AT THE SERVICE ENTRANCE.
System Details
2 150 SQ.MM XLPO/PVC, CU TRAY 1 SET PER PHASE 320A 35 SQ.MM, COPPER 254A 317.5A 100 mtr 1.2%

3 300 SQ.MM XLPO/PVC, CU TRAY 22 SET PER PHASE 4000A 120 SQ.MM, COPPER 11684A 14605A 100 mtr 1.4% CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE
4 240 SQ.MM XLPO/PVC, CU TRAY 2 SET PER PHASE 630A 70 SQ.MM, COPPER 467.3A 584.2A 200 mtr 0.1% 2 LISTED AS SUNLIGHT RESISTANT PER NEC ARTICLE kW DC = 18.43 MWp
300.6 (C) (1) AND ARTICLE 310.10 (D).
kW AC = 16.10 MW
CONDUCTORS EXPOSED TO WET LOCATIONS SHALL
3 BE SUITABLE FOR USE IN WET LOCATIONS PER NEC
ARTICLE 310.10 (C).

GROUNDING NOTES
GRID
ALL EQUIPMENT SHALL BE PROPERLY GROUNDED
1 PER THE REQUIREMENTS OF NEC ARTICLES 250 &
690

PV MODULES SHALL BE GROUNDED TO MOUNTING

GRID-TIED PV SYSTEM
RAILS USING MODULE LUGS OR RACKING
INTEGRATED GROUNDING CLAMPS AS ALLOWED BY
2
LOCAL JURISDICTION. ALL OTHER
EXPOSED METAL PARTS SHALL BE GROUNDED
USING UL-LISTED LAY-IN LUGS.

INSTALLER SHALL CONFIRM THAT MOUNTING


SYSTEM HAS BEEN EVALUATED FOR COMPLIANCE
3
WITH UL 2703 "GROUNDING AND BONDING" WHEN
(N) MV TRAFO
USED WITH PROPOSED PV MODULE.
POINT OF INTERCONNECTION 5MVA X 4Nos
AT PRIMARY SIDE OF THE 0.8/20 KV
TRANSFORMER IF THE EXISTING MAIN SERVICE PANEL DOES NOT
HAVE A VERIFIABLE GROUNDING ELECTRODE, IT IS
4
THE USER'S RESPONSIBILITY TO INSTALL A
SUPPLEMENTAL GROUNDING ELECTRODE

AC SYSTEM GROUNDING ELECTRODE CONDUCTOR


5 (GEC) SHALL BE A MINIMUM SIZE 4 SQ.MM WHEN
INSULATED

EQUIPMENT GROUNDING CONDUCTORS SHALL BE


6 SIZED ACCORDING TO NEC ARTICLE 690.45, AND BE
A MINIMUM OF 2.5 SQ.MM

5000A 5000A 5000A


(N) PV COMBINER PANEL
GROUNDING AND BONDING CONDUCTORS, IF
15KA, 800V, 3Ø, 7 INSULATED, SHALL BE COLOR CODED GREEN, OR
MARKED GREEN IF 25 SQ.MM OR LARGER
320A 320A 320A 320A

MODULES

QTY 29500

MODEL Jinko Solar JKM625N-78HL4-BDV (625W)

PMAX 625W

ISC 14.27A

IMP 13.56A

VOC 55.72V
INVERTER-1 INVERTER-6 INVERTER-7 INVERTER-24
VMP 46.10V
SUNGROW SUNGROW SUNGROW SUNGROW
SG-350HX
350kW, 800V
SG-350HX
350kW, 800V
SG-350HX
350kW, 800V
SG-350HX
350kW, 800V TEMP. COEFF. OF Voc SINGLE LINE DIAGRAM
-0.25 %/C

FUSE RATING

30A

INVERTER

14 INVERTERS 28 INVERTERS QTY 46


22 Strings 22 Strings 23 Strings 23 Strings

MODEL Sungrow SG350-HX

MODULE COUNT: MODULE COUNT: MODULE COUNT: MODULE COUNT:


AC VOLTAGE 800V

JINKO SOLAR
JKM625N-78HL4-BDV(625W)
JINKO SOLAR
JKM625N-78HL4-BDV(625W)
JINKO SOLAR
JKM625N-78HL4-BDV(625W)
JINKO SOLAR
JKM625N-78HL4-BDV(625W)
GROUND SOLIDLY GROUNDED REVISIONS
25 STRINGS OF 25 MODULES 25 STRINGS OF 25 MODULES 26 STRINGS OF 25 MODULES 26 STRINGS OF 25 MODULES
RATED POWER 350kW

MAX OUTPUT CURRENT 254A

MAX INPUT CURRENT 12 x 40A

1 SINGLE-LINE DIAGRAM
MAX INPUT VOLTAGE 1500Vdc

MAXIMUM EFFICIENCY 98.8%


PV-3 SCALE: NTS