17LG0121 Contract

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

~--- .. - . -.... - - - ...

Department of Public Works and Highways (DPWH)


Contract ID : 17LG0121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
Location of the Contract: San Isidro, Davao Oriental

CONTRACT AND AGREEMENT

THIS AGREEMENT, made this 2(111 day of December, 2017 between,


CYNTHIA GRACE C. TIU, OIC - District Engineer, Department of Public Works and
Highways, Davao Oriental2od District Engineering Office, Mati, Davao Oriental (hereinafter
called the "Entity") and RENATO R. CASTANEDA, Proprietor, Rely Construction & Supply,
with business address at Km. 7 Tigatto Road, Buhangin Davao City ,(hereinafter called the
"CONTRACTOR").

WHEREAS, the ENTITY is desirous that the CONTRACTOR execute the works under the
Construction of 2 Storey Workshop Building, San Isidro NHS (Regular Workshop)
San Isidro, Davao Oriental and the Entity has accepted the Bid for the execution and
mpletion of such works calculated in the unit prices shown in the attached Bill of
uantities, a total Bid price of Thirty Seven Million Seven Hundred Eighty Seven
Thousand Six Hundred Thirty Four Pesos & 161100 (P 37, 787.634.16) to be completed
within One Hundred Eighty (180) calendar days.


NOW THIS CONTRACT AGREEMENT WITNESSETH AS FOLLOWS:

1. In this CONTRACT AGREEMENT, words and expressions shall have the same
meanings as are respectively assigned to them in the Conditions of Contract
hereinafter referred to.

2. The following documents shall be attached. deemed to form. and be read and
construed as part of this CONTRACT AGREEMENT:

a. Bidding Documents for the Contract (Annex "A")

(1) General Conditions of Contract


(2) Special Conditions of Contract
(3) Drawings
(4) Specifications
(5) Invitation to Bid
(6) Instructions to Bidders
(7) Bid Data Sheet
(8) SupplementallBid Bulletins (Addenda)

10f18 1
Department of Public Works and Highways (DPWH)
Contract ID : 17LG0121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
Location of the Contract: San Isidro, Davao Oriental

b. CONTRACTOR'S Calculated Bid in the Form of Bid including its technical and
Financial Proposal (Annex "B")

c. CONTRACTOR'S Letter of Intent for eligibility and Contractor's Information from


the DPWH Registry (Annex "C")

d. Notice of Award of Contract and the CONTRACTOR's "conforme' (Annex "0")

e. Performance Security (Annex HE")

f. Credit Line certificate (Annex "F")

g. PERT/CPM Diagram and Bar Chart with S-Curve, Manpower & equipment
Utilization Schedule (Annex "G")
~
w h. Construction Methods
'Z

~-
~L-
(1)0 i. Construction Safety and Health Program duly approved by the DOtE
«u
oe!
·c
0::0
OU 3. In consideration of the payments to be made by the ENTITY to the
~
z
CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby
W covenants with the ENTITY to execute and complete the Works and remedy
0:: any defects therein in conformity with the provisions of the CONTRACT
AGREEMENT in all respects.

20f18 2
Department of Public Works and Highways (DPWH)
Contract ID : 17LG0121
« Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
Q ..... (Regular Workshop)
Wo
120 Location of the Contract: San Isidro, Davao Oriental
«~
1-­
f1JC
«0
(.)U
.... The following are the quantities and items of Work included in the scope of work
A o::.e
Vvi{- ITEM NO. DESCRIPTION QUANTITY UNIT COST TOTAL COST
« E I------~------------------------~------------~------~~--------~
~~ A.) ConstrucHon of 2 Storey Workshop Building 1
~
a:: Construction of Field Office for the Engineer
A.1.1.3 (12x 12m) 1.00 1.5. 40,200.00 40,200.00

1~ B.3 Permits and Clearances 1.00 I.s. 40.200.00 40,200.00


t; B.5 Project Billboard/Signboard 1.00 each 6,030.00 6,030.00
w-
~ I. i ~ B.7 Occupational Safety and Health Program 2.63 mo. 13,249.50 34,846.18
Vi ~~~ ~ Mobilization & Demobilization (Hauling
~~ ~ :; ~ B.9 Cost)
1.00 Ls. 36,300.90 36,300.90
"~o ~~~
~ ~~~8_00~(2~)~C_le_a_n_ng~a_n_d_G_r_Ub_b_in~g____________~___2_1_3._75~_c_u._m_.~___5_4_5._70~____1_16_,_M_3_.3~7
........... )303 (1 /a Structure Excavation 196.98 cU.m. 491.84 96.882.64
804(1)a EmbanKment from Structure Excavation 105.37 cU.m. 612.96 64.587.59
c:§ 804 (l)b Embankment (selected borrow) 111.83 cU.m. 570.37 63.784.47
W
'z 804 (4) Gravel Fill 33.92 cU.m. 1,655.19 56,144.04

~-
~ ....
f1JO Structural Concrete (Footings and Slab on
«0 900 (1) c2 RII), Class A, 28 days 50.71 cU.m. 7,011.37 355,546.57
(.)~
·c
o 900 (I) c3 Structural Concrete (Footing Tie Beams),
OU 17.28 cU.m. 7,484.77 129.336.82
Class A, 28 days
!;(
z 900 ( ) Structural Concrete (Columns), Class A, 28
W
1 c4 days 25.89 cU.m. 7,288.04 188,687.35
a::
900 (1 Structural Concrete [Suspended Slab). Class
) c5 A, 28 days 27.61 cU.m. 7,643.90 211,048.07

900 (1) c6 Structural Concrete (Beams), Class A, 28 day 30.44 cU.m. 7,203.55 219,276.06
" .... 902 (l) al Reinforcing Steel, Grade 40 27,248.42 kgs. 69.14 1.883,955.75

'--~ ~ e 1~(~ l :II~JJ ::~~:~i:lseWab 1.00


115.00
I.s.
liters
12,100.00
423.50
12,100.00
48,702.50
~ $~ ~~ 1046 (2) al lcx:>mm ~HB
Non Load Bearing lind 88.00 sq.m. 689.70 60,693.60
2~ ~ ~ ~ ReinforCing Steel)
~ ~ ~$ o(~\ 0 2 2 150mm CHB Non Load Bearing (Ind
~ t/) ~~ i=1g"\ 1 46! ) a Reinforcing Steel) 400.00 sq.m. 1,210.00 484,000.00

~~ ~... e:..a::
i' ~ ~0
0
1002 (3) a8 100 mm dia. G.!. Pipe - (Exit Staircase) 6.40 m. 701.80 4,491.52
1003 (9) Carpentry and Joinery Works (Blackboard) 4.00 piece 2,585.77 10.343.08
lOO4(2)a Locksets 8.00 set 1,815.00 14.520.00
l004(2)c Bolts 5.00 sets 60.50 302.50

30f18 3
Department of Public Works and Highways (DPWH)
Contract ID . 17LG0121
~ : Construction of 2 Storey Workshop Building, San Isidro NHS
wa Contract Name
IZ 1:5 (Regular Workshop)
t:! C
l!!
Location of the Contract: San Isidro, Davao Oriental
~ u
0
0 L..
a:.g The following are the quantities and items of Work included in the scope of work
f/)

L j CC!>
f/)

VVi5 ~
ITEM NO.
:::::I DESCRIPTION QUANTITY UNIT COST TOTAL COST
f~ 1004(2)e Knobs 5.00 sets L815.00 9,075.00
l004(2)f Handles 10.00 sets 302.50 3.025.00
0=
0::­
- 1004 [2)g Hinges 85.00 pc. 363.00 30.855.00

a (J)~
....

~§8 1004(2)i Grab Bar 1.00 unit 121.00 ILI.UU


. ~z 1005 (1) Steel Casement Window 48.96 sq.m. 1,229.84 60,212.96
:v="'~~
~
--.; UD '.~::Z:
l005{5)
l009(1)a
Window Grill
Jalousie Window
252.00
24.05
kas.
sq.m.
121.00
695.06
JUAYL.UU
16,716.19

~~ NOlO (2)a Flush Door 12.21 sq.m. 775.05 9,463.36


~01O(2) b Wood Panel 15.12 sq.m. 1.237.85 18,716.29
1021(l)c Plain Cement Finish with Floor Hardener 424.17 sq.m. 423.50 179,635.99
«
c 1027(1) Plain Cement Plaster Finish 1,699.22 sq.m. 377.10 640,775.86
w
'z 1053(3)a1 38mm dia. G.I. Pipe Railings 132.00 legs. l,21O.go 159)20.00
t:!.~....
b~0: ~§
50mm0 G.!. Pipe Handrail Fully Welded
1053(3)a2 398.00 legs. 1,210.00 481,580.00
on Vertical Railing on 19mm bar

gu 1003(1)al
1038(1)
Fiber Cement Board on Metal Frame
Reflective Insulation
237.86
315.48
sq.m.
sq.m.
898.89
772.03
213,809.97
243,560.02
.Q
\j
.$
>.
~
it
1018(1) Glazed TIles & Trims 83.92 sq.m. 570.63 47,887.26
c: 1018(2) Unglazed TIles 28.92 sq.m. 664.24 19,209.82
G)
U)

~ 1032(I)a Painting Works (Masonry/Concrete) 1.239.81 sq.m. 501.57 621,851.50


Q.
G)
0:: 1032(I)b Painting Works (Wood) 50.15 sq.m. 442.08 22,170.31

1032 (I) c Painting Works (Steel) 611.84 sq.m. 519.60 317,912.06


, ~ .... C!>
C!> 1014(I)b2
Prepainted Metal Sheets, long Span,
290.20 sq.m. 292.85 84,985.07

~~
~ w 'c;,
C Corrugated, 0.50mm thle.
C
Til () w Fabricated Metal Roofing Accessory
~ >. « 1:5 'C
1013(2)a
(Ridge Roll, 0.6mm thle)
24.20 m. 786.50 19,033.30
iL.Q

~
~
.E::_
G) «
_
Fabricated Metal Roofing Accessory
-c: :t: 1013(2)b 26.21 m. 484.00 12,685,64
'0 ~ I­ (Flashing, 0.6mm thk)
~~ Z 0
«l Q. > Fabricated Metal Roofing Accessory
e::..~ () 1013(2)c 47.80 m. 363.00 17,351.40
(Gutter, 0.6mm thle)

40f18 4
Department of Public Works and Highways (DPWH)
Contract ID : 17LG0121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
Location of the Contract: San Isidro, Davao Oriental

The following are the quantities and items of Work included in the scope of work

~
ITEM NO. DESCRIPTION QUANTITY UNIT COST TOTAL COST

~=
1047(1)a Structural Steel, Trusses 6,672.96 kgs. 121.00. 807,428.16,... ~
--­
(I):: l003(l1)b Fascia Board 20.00 pcs. 484.00 9.680.00 k

~ ~~ ,:3
l001(6)bl Catch Basin
(8) Sewer Line WorKs
1.00
1.00
Is.
Is.
12,100.00
84.700.00
12,100.00
84,700.00... ~.
~

:;:: ).:(8
Iil ~~() 1001(9) Storm Drainage and Downspout 1.00 Is. 72.600.0..0­ 72.600.00
(J.) ~
t £~ " 1002(8) Plumbing Fixtures 1.00 Is. 96.800.00­ 96,800.00 ~

~ ,,002 (28) Cold Water Line Works 1.00 Is. 48.400.Og. 48.400.00.. ~
...... 120111) Water Pumping System 1.00 Is. 605.000.00 605.000.00 k
1202 (23) Fire Hose Cabinet 1.00 set 5.445.00 5.445.00
e(
C 1100 (19) Conduits. Boxes and Fittings 1.00 Is. 48.400.00 48,400.00 I-­
W
·z 1101 (18) Wires and Wiring Devices 1.00 Is. 108.900.00 108,900.00 I--­

~
r
....
~~
g
1102 (1) bl Panelboard with Main & Branch Breaker 1.00 Is. 60.500.00 • 60.500.00 ~

c:: 1102 (10) b Pole Mounted Transformer (DISC) 1.00 Is. 66.500.00 66.500.00 /
D:! 0
()
0 1103 (1) Lighting Fixtures 1.00 Is. 60.550.0Q. . 60.550.00
l-
e(
Z 1210(1) Fire Alarm System 1.00 Is. 36.300.00 36.300.00 !0­
~ W
"0
(J.)
0::: Sub·Totall 9,562.771.11< ",
'E
(J.)
<I)

~ B.) Construction of 2 Storey Workshop Building 2


e..
(J.)
cr: 800 (2) Clearing and Grubbing 213.75 cU.m. ~ 116,643.37/
545.70
~.
803 (1)0 Structure Excavation 196.98 cU.m. 491.84 96.882.64t
804 (1) a Embankment from Structure Excavation 105.37 cU.m. 612.96 I­ 64.587.59 v·

, :;:j
i= "­
Q)
Q)
804 (l)b
804 (4)
Embankment (selected borrow)
uravel Fill
Structural Concrete (Footings and Slab on
111.83
33.92
cU.m.
cU.m.
570.3l­
1.655.19 I­
63,784.4;z..
56.144.04 V
~
.!;;; 900(I)c2 50.71 cU.m. 7.011.37
Fill). Class A. 28 days ..... 355.546.57

.Clit
.-.. UJ Cl
c::
iii 0 W Structural Concrete (Footing Tie Beams).
~>- '0 900 (1) c3 17.28 cU.m. 7.484.77 V­
Class A. 28 days 129.336.82"
u:::.o (!)
(J.)
:5­
~ «- 900 (1) c4
Structural Concrete (Columns). Class A. 28
25.89 cU.m. 7.288.04­
days 188.687.35
-~
Ot/)
::r:
....
()
~~ Z 0 Structural Concrete (Suspended Slab). /

me.. >­ 900 (1) c5 27.61 cU.m. 7.643.90


~£ U Class A. 28 days .....­ 211,048.07
Structural Concrete (Beams), Class A. 28
900 (II c6 days 30.44 cU.m. 7.203.S§"1­ 219.276.06­

50f18 5
Department of Public Works and Highways (DPWH)
Contract ID : 17LG0121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
Location of the Contract: San Isidro, Davao Oriental

The following are the quantities and items of Work included in the scope of work

0::
ITEM NO. DESCRlP1"ION QUANTITY UNIT COST TOTAL COST

r ~ 902 (1) a1 Reinforcing Steel, Grade 40 27,248.4 kgs. 69.14 1.883.955.75

c::
Z ::J
-
~ffi:::ljY-c:: 903 (2)
1000(1)
Forms and Falseworks
Soil Poisoning
l.oo
115.00
I.s.
liters
12,100.00
423.50
12,100.00
48.702.50

D ~ ~~ ~§ ~
1046 (2) al
100mm CHB Non Load Bearing (IncL
Reinforcing Steel)
88.00 sq.m. 689.70 60.693.60

-....
G)
.s:
0
u.. \~~ 1046 (2) a2 150mm CHB Non Load Bearing (Inc!.
400.00 sq.m. 1.210.00 484.000.00
Reinforcing Steel)

1oo2(3)a8 100 mm dia. G.!. Pipe - (Exit Staircase) 6.40 m. 701.80 4.491.52
«C 1003 (9) Carpentry and Joinery Works (Blackboard) 4.00 piece 2.585.77 10,343.08
w
1004 (2)a Locksets 8.00 set 1.815.00 14.520.00

~~<3 ~
. r/J

~
1004(2jc Bolts
1004(2)e Knobs
5.00
5.00
sets
sets
60.50
1.815.®
302.50
9.075.00
a:: c::
0 1004(2)f Handles 10.00 sets 302.50 3.025.00
u
;,.:,
«~z 1oo4(2)g Hinges 85.00 pc. 363.00 30.855.00
.0 W 1004 (2)i Grab Bar 1.00 unit 121.00 121.00
"0 0::
.!!
c: 1005(1) Steel Casement Window 48.96 sq.m. 1.229.84 60,212.96
G)

'"a.~ loo5!5] Window Grill 252.00 kgs. 121.00 30,492.00


G)
a::: lOO9(1)a Jalousie Window 24.05 sq.m. 695.06 16.716.19
1010 (2)a Flush Door 12.21 sq.m. 834.51 10.189.36
1010 (2) b Wood Panel 15.12 sq.m. 1.237.85 18.716.29
1021(1)c Plain Cement Finish with Floor Hardener 424.17 sq.m. 423.50 179.635.99
( ;2
I-(\) ~ 1027(1) Plain Cement Plaster Finish 1.699.22 sq.m. 377.10 640.775.86

-u:.o.01~illi
1053(3)al 38mm dia. G.I. Pipe Railings 132.00 kgs. 1.210.00 159.720.00
.... we>
i <..) 50mmel G.!. Pipe Handrail Fully Welded
Il.. .­ 1053(3)a2 398.00 kgs. 1.210.00 481,580.00
f;,.:, (.)
·c on Vertical Railing on 19mm bar
1oo3(1)a1 Fiber Cement Board on Metal Frame 237.86 sq.m. 898.89 213.809.97
~~
-c: «~
­ 1038(1) Reflective Insulation 315.48 sq.m. 772.03 243.560.02
" - G) :::t: U
~e
ilia.
~O

1018(1) Glazed Tiles & Trims 83.92 sq.m. 570.63 47.887.26
!?:-~ <..) 1018(2) Unglazed Tiles 28.92 664.24 19.209.82
1032(1)a Painting Works (Masonry/Concrete) 1.239.81 sq.m. 501.57 621.851.50
1032('1)b Painting Works (Wood) 50.15 sq.m. 442~ 22,170.31

60f18 6
Department of Public Works and Highways (DPWH)
ContractID . 17LG0121
~ Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
w "-
'z t50 (Regular Workshop)
:!m ~c: Location of the Contract: San Isidro, Davao Oriental
~. u"-
0

The following are the quantities and items of Work included in the scope of work
-11 ~ ~
.e
V~ ~ ITEM NO. DESCRIPTION QUANTITY UNIT COST TOTAL COST
~
:::» ~
a: 1032 (1) c Painting Works (Steel) 611.84 sq.m. 519.60 317.912.06
Prepainted Metal Sheets. Long Span.
1014(1)b2 290.20 sq.m. 292.85 84,985.07
Corrugated. 0.50mm thk.
I~ Fabricated Metal Roofing Accessory
1-= 1013(2)a 24.20 m. 786.50 19.033.30
m= (Ridge Ron. 0.6mm thk)

~~ Fabricated Metal Roofing Accessory


12.685.64
~~~"8
1013(2)b 26.21 m. 484.00
(Flashing. 0.6mm thk)

Q)
~~~ ..;:~ 1013(2Jc
Fabricated Metal Roofing Accessory
47.80 m. 363.00 17.351.40
l~' ~7(IJa
"
(Gutter. 0.6mm thk)
t
~ , Structural Steel. Trusses
'l603(11)b Fascia Board
6.672.96
20.00
kgs.
pcs.
121.00
484.00
807.428.16
9.680.00
"'---­ l00lj6)bl Catch Basin 1.00 Is. 12.100.00 12.100.00
«
0
1001 (8) Sewer Line Works 1.00 Is. 72.600.00 72.600.00
w 1001(9) Storm Drainage and Downspout 1.00 Is. 72.600.00 72.600.00
'Z •

~i -
"- 1002(8) Plumbing Fixtures 1.00 Is. 96.800.00 96.800.00
~ 1002 (28) Cold Water line Works 1.00 Is. 48.400.00 48.400.00
~
c:
a: 0 1201(1) Water Pumping System 1.00 Is. 605.000.00 605.000.00
0 U 1202 (23) Fire Hose Cabinet 1.00 set 5.445.00 5.445.00
I-
>.
«
z 1100 (19) Conduits. Boxes and Fittings 1.00 Is. 48.400.00
.c
48.400.00
W
""0
.sc: a: 1101 (18) Wires and Wiring Devices 1.00 Is. 108.900.00 108.900.00
Q)
f/) 1102(I)bl Panel board with Main & Branch Breaker 1.00 Is. 60.500.00 60.500.00
~
0..
Q) 11102 (10) b Pole Mounted Transformer (OISC) 1.00 Is. 60.500.00 60.500.00
a::
1 1103 (1) lighting Fixtures 1.00 Is. 72.600.00 72.600.00
;:) 36.300.00
1210 (1) Fire Alarm System 1.00 Is. 36.300.00
'" i=.(])
'-
(])

.c1
c: Sub-Total 2 9.399,870.09

~
'6)
c:
m 0 W
C.) Construction of 2 Storey Workshop Building 3
~ >. tS
ct .c:
800 (2) Clearing and Grubbing 213.75 cU.m. 545.70 116,643.37

~
u:::.c
s=_
Q) a; ct
_ 803 {l)a Structure Excavation 196.98 cU.m. 491.84 96.882.64
-c: :::t
03: I­ 804 (1) a Embankment from Structure Excavation 105.37 cU.m. 612.96 64,587.59
~~ Z (5
m 0.. >­ 804 (l)b Embankment (selected borrow) 111.83 cU.m. 570.37 63.784.47
e::.~ 0 804(4) Gravel Fin 33.92 cU.m. 1.655.19 56.144.04
Structural Concrete (Footings and Slab on
900 (1) c2 50.71 cU.m. 7.011.37 355.546.57
FiliI. Class A. 28 days

70f18 7
Department of Public Works and Highways (DPWH)
«
Q
Contract ID : 17LGOl21
w ..... Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
IZ -§ (Regular Workshop)

~. -
!!!
c: Location of the Contract: San Isidro, Davao Oriental
0
()

Q. .9 The following are the quantities and items of Work included in the scope of work
119 ~

~ ~ ITEM NO.
:l
DESCRIPTION QUANTITY UNIT COST TOTAL COST
0:::
Structural Concrete (Footing Tie Beams).
900 (1) c3 17.28 cU.m. 7,484.77 129.336.82
Class A. 28 days

~" 900 (I) c4


Structural Concrete (Columns). Class A. 28
days
25.89 cU.m. 7.288.04 188.687.35

f; ·~B
~ ~~~~
we:
900 III c5
Structural Concrete (Suspended Slab).
Class A. 28 days
27.61 cU.m. 7.643.90 211.048.07

Structural Concrete (Beams). Class A. 28

~ IJ~~
900 (I) c6 30.44 cU.m. 7.203.55 219.276.06
days
902 (1) al Reinforcing Steel, Grade 40 27.248.42 kgs. 69.14 1.883.955.75
u. '­ I 903 (2) Forms and Falseworks 1.00 I.s. 12.100.00 12.100.00
1000(1) Soil Poisoning 115.00 liters 423.50 48.702.50
«
Q l00mm CHB Non Load Bearing (Inci.
1046 (2) a1 88.00 sq.m. 689.70 60.693.(1)

-Y
Reinforcing Steel)

~ .... 1046 (2) a2


150mm CHB Non Load Bearing (Incl.
Reinforcing Steel)
400.00 sq.m. 1.089.00

435.600.00

ti
H 1002 (3) a8 100 mm dia. G.I. Pipe - (Exit Staircase)
c: 6.40 m. 701.80 4.491.52
0
()
0 1003 (9) Carpentry and Joinery Works (Blackboard) 4.00 piece 2.585.77 10.343.08

>.
«
Z lOO4(2)a Locksets 8.00 set 1.815.00 14.520.00
.Q
W
-0 0::: l004(2)c Bolts 5.00 sets 60.50 302.50
~Q) l004(2)e Knobs 5.00 sets 1,815.00 9.075.00
<II
~ 1004 (2)f Handles 10.00 sets 302.50 3.025.00
a.
<I)
0::: 1004(2)9 Hinges 85.00 pc. 363.00 30.855.00
l004(2)i Grab Bar 1.00 unit 121.00 121.00
1005 (1) Steel Casement Window 48.96 sq.m. 1.229.84 60.212.96

( 2 ~ 1005(5) Window Grill 252.00 kgs. 121.00 30,492.00

~~
1009(1)0 Jalousie Window 24.05 sq.m. 695.06 16.716.19
c:
.­ '81 1010 (2)a Flush Door 12.21 sq.m. 775.05 9,463.36
1ij
a. ~&Ii
_ 1010 (2) b Wood Panel 15.12 sq.m. ltl.716.'B
_ 0 1.237.85

~Q)~~
=......
"I!
«
­ t
1021 (l)c Plain Cement Finish with Floor Hardener
1027(1) Plain Cement Plaster Finish
424.17
1.699.22
sq.m.
sq.m.
423.50
377.10
179.635.99
640,775.86
- i :::r:.: () 1053(3)01 38mm dia. G.!. Pipe Railings 132.00 kgs. 1.210.00 159)20.00
;~ !z>­ 6 50mm0 G.I. Pipe Handrail Fully Welded
III a. 1053(3)a2 398.00 kgs. 1,331.00 529,738.00
~~ () on Vertical Railing on 19mm bar
1003(1)01 Fiber Cement Board on Metal Frame 237.86 sq.m. 898.89 213,809.97
1038(1 ) Reflective Insulation 315.48 sq.m. 772.03 243.560.02

80f18 8
Department of Public Works and Highways (DPWH)
c=!i
ContractID : 17LG0121
w.... Contract Name
: Construction of 2 Storey Workshop Building, San Isidro NHS
IZ .9
~~ (Regular Workshop)
(J)- Location of the Contract: San Isidro, Davao Oriental
«5
00
~! The following are the quantities and items of Work included in the scope of work

~~
§ > ITEM NO. DESCRIPTION QUANTITY UNIT COST TOTAL COST
0::
1018(1) Glazed Tiles & Trims 83.92 sq.m. 570.63 47,887.26
'0 1018(2) Unglazed Tiles 28.92 sq.m. 664
-------i
19,209.82

~w~
:::) .!!}
1032(1)a Painting Works (Masonry/Concrete)
1032(l)b Painting Works (Wood)
1,239.81
50.15
sq.m.
sq.m.
501.57
442.08
621,851.50
22,170.31
~ >~ § 1032 (1) c Painting Works (Steel) 611.84 sq.m. 519.60 317,912.06
=~ :~ IOI4(l)b2 Prepoinled Melal Sheels, long Spon, 290.20 sq.m. 292.85 84,985.07
~~ ~ Corrugated, O.50mm thk.
IL \.' \ ' ' ­ \013[2)0 Fabricated Metal Roofing Accessory
24.20 m. 786.50 19,033.30
""-.,1)1 (Ridge Roll, 0.6mm thk)
Fabricated Metal Roofing Accessory
1013(2)b (Flashing, 0.6mm thk) 26.21 m. 484.00 12,685.64

Fabricated Metal Roofing Accessory


1013(2)c (Gutter, 0.6mm thk) 47.80 m. 363.00 • 17,351.40

1047(1)0 Structural Steel. Trusses 6,672.96 kgs. 121.00 807,428.16


1oo3(II)b Fascia Board 20.00 pes. 484.00 9,680.00
1001(6)b 1 Catch Basin 1.00 Is. 12,100.00 12,100.00
1001 (8) Sewer Une Works 1.00 Is. 84,700.00 84)00.00
1001 (9) Storm Drainage and Downspout 1.00 Is. 72,600.00 72,600.00
1002(8) Plumbing Fixtures 1.00 Is. 96,800.00 96,800.00
1002 (28) Cold Water Une Works 1.00 Is. 48.400.00 48.400.00
1201 (1) Water Pumping System 1.00 Is. 605,000.00 605,000.00
1202 (23) Fire Hose Cabinet 1.00 set 5,445.00 5.445.00

1-1<0 ~ ~ 0 ~ 1102 (1) b 1 Panelboard with Main & Branch Breaker 1.00 Is. 60,500.00 60,500.00

~~
:t

~~ ",..
H <,~
~ '5 :g
:;:
~
u

0
1102 (10) b Pole Mounted Transformer (OISC)
1--1_10_3..;.,(1..;.,)-+-UQ
1210 (1) FireAlarmSystem
1---..;...;.-+------=---------+----+----+----+------1
1.00
;;;.h_ti...;nQ:;.....Fix_tu_re_s_ _ _ _ _ _ _-+___
Is. 60,500.00 60,500.00
1.oo--+__,_s._+-_72_,600_.oo-+___7_2';...600_.00---i
1.00 Is. 37,510.00 37,510.00
~~ ~ i ~0 Sub-TotalS 9,412,212.09
o ~ e::-~ 0

90f18 9
Department of Public Works and Highways (DPWH)
«
0
Contract ill : 17LG0121
w '- Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
IZ
~ (Regular Workshop)
I
~« 0
~
C Location of the Contract: San Isidro, Davao Oriental
(.) t)

-,4i, >- ~
0
.2
~
The following are the quantities and items of Work included in the scope of work

::l
;: ITEM NO. DESCRlP"nON QUANTITY UNIT COST TOTAL COST
0:::
C.) Construction of 2 Storey Workshop Bundlng 3
I
I~ 800 (2) Clearing and Grubbing 213.75 cU.m. 545.70 116,643.37

pJ. -
t; - 803 (lJa Structure Excavation 196.98 cU.m. 491.84 96,882.64
w r.:: 804(lla Embankment from Structure Excavation 105.37 cU.m. 612.96 64,587.59
zr.::
::l!!!
804 (lIb Embankment (selected borrow) 111.83 cU.m. 570.37 63,784.47
. 'JIIC"~...:~
_~ 804 (4) Gravel Fill 33.92 cU.m. 1.655.19 56,144.04
o
w «
~ ~ o~
Structural Concrete (Footings and Slab on

~
«
0
" )
900 (1) c2

900 (I) c3
Fill). Class A, 28 days
Structural Concrete (Footing Tie Beams),
Class A, 28 days
Structural Concrete (Columns), Class A. 28
SO.71

17.28
cU.m.

cU.m.
7.011.37

7.484.77
355.546.57

129,336.82

w 900 (I) c4 25.89 cU.m. 7,288.04 188,687.35


'Z days

~
'­ Structural Concrete (Suspended Slab), •
~
"D
900 (1) c5 27.61 cU.m. 7,643.90 211.048.07
Class A, 28 days
~
r.::
Ii 0 Structural Concrete (Beams), Class A. 28
t) 9OO[I}c6 30.44 cU.m. 7,203.55 219.276.06
0 days
~ 902 (1) a1 Reinforcing Steel, Grade 40 27.248.42 kgs. 69.14 1,883,955.75
k z
W
"C 0::: 903 (2) Forms and FalsewOl1cs 1.00 I.s. 12,789.70 12,789.70
J!!
c:
11) 1000(1) Soil Poisoning 115.00 liters 423.SO 48,702.SO
til
e
Q. l00mm CHB Non Load Bearing (Incl.
11) 1046 (2) al 88.00 sq.m. 786.SO 69,212.00
0::. Reinforcing Steel)
lSOmm CHB Non Load Bearing (Incl.
1046 (2) a2 400.00 sq.m. 1.210.00 484,000.00
Reinforcing Steel)
:J 1002 (3) a8 100 mm dia. G.I. Pipe ­ (Exit Staircase) 6.40 m. 701.80 4,491.52

~ '0

( (I)
(I)
r.:: 1003 (9) Carpentry and Joinery Works [Blackboard) 4.00 piece 2,585.77 10,343.08

POl
~.. (.) 1:)
w
r.:: 1oo4(2)a Locksets
1004(2)c Bolts
8.00
5.00
set
sets
L815.oo
60.50
14,520.00
302.50

~
.... >-.
u::.a loo4(2}e Knobs 5.00 sets 1.815.00 9,075.00
11)-g
.J::_ or:(
_
-c: ::I: loo4(2)f Handles 10.00 sets 302.50 3,025.00
'5~ ~
~e z 0 1oo4(2)g Hinges 85.00 pc. 363.00 30.855.00
t'\l Q. >­
e:.~ (.) loo4(2)i Grab Bar 1.00 unit 121.00 121.00

100f 18 10
Department of Public Works and Highways (DPWH)
Contract ID : 17LG0121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
Location of the Contract: San Isidro, Davao Oriental

The following are the quantities and items of Work included in the scope of work

~F
Q
:::::l S ITEM NO. DESCRIPTION QUANTITY UNIT COST TOTAL COST
0::
1005(1) Steel Casement Window 48.96 sq.m. 1,229.84 60,212.96
I
p/o 1005[5) Window Grllll 252.00 kgs. 121.00 30.492.00
~ cn­
~=
We
1009(1 )a Jalousie Window 24.05 sq.m. 695.06 16.716.19
1010 (2)a Flush Door 12.21 sq.m. 775.05 9.463.36
{ : ~~>=>s
z c
~ .. ~ci§ 1010 (2) b Wood Panel 15.12 sq.m. 1,237.85 18.716.29

~ ~~r
~ (..,,,
1021(1 )c Plain Cement Finish with Floor Hardener
1027(1 ) Plain Cement Plaster Finish
424.17
1,699.22
sq.m.
sq.m.
423.50
377.10
179,635.99
640,775.86
L1.
~1053(3Jal 38mm dia. G.l. Pipe Railings 132.00 kgs. 1,210.00 159.720.00

- «
Q
W
.z
1053(3)a2
50mm0 G.!. Pipe Handrail Fully Welded
on Vertical Railing on 19mm bar
l003(1)al Fiber Cement Board on Metal Frame
398.00

237.86
kgs.

sq.m.
1.331.00

898.89
529.738.00

213,809.97

~~

1038(1] Reflective Insulation 315.48 sq.m. 772.03 • 243,560.02
~
~ 101811) Glazed Tiles &Trims 83.92 sq.m. 570.63 47,887.26
§ 1018(2) Unglazed Tiles 28.92 sq.m. 664.24 19,209.82
aI­ 0
« 103211)a Painting Works (Masonry/Concrete) 1,239.81 sq.m. 501.57 621,851.50
>.
..c
z 1032(1 )b Painting Works [Wood] 50.15 sq.m. 442.08 22,170.31
W
"C 0::
.sc:: 103211) c Painting Works (Steel) 611.84 sq.m. 519.60 317,912.06
Q)
t:/)
I!! Prepainted Metal Sheets, Long Span, 290.20 sq.m. 292.85 84,985.07
c.
CIl 1014(I)b2
a::: Corrugated, O.50mm thk.
Fabricated Metal Roofing Accessory 24.20 m. 786.50 19,033.30
1013(2)a
(Ridge Roll, O.6mm thkJ
:;:) Fabricated Metal Roofing Accessory 26.21 m. 484.00 12,685.64

t~ ~

(JJ 1013(2)b
(JJ
c
[Flashing. 0.6mm thk)
'0,
c Fabricated Metal Roofing Accessory 47.80 m. 363.00 17,351.40
w 1013(2)c
'0 [Gutter, 0.6mm thk)
iI:~
CIl'i <c 1047(I)a Structural Steel. Trusses 6,672.96 kgs. 121.00 807.428.16
:5- ­ 20.00 pes. 484.00 9.680.00
-i ::J: l003!1l)b Fascia Board
Ot:/) I­ 0
~I!! Z (5 1001l6)bl Catch Basin 1.00 Is. 12,100.00 12,100.00
a:J c. >­
e::.~ 0 1001 (8) Sewer line Works 1.00 Is. 84)00.00 84)00.00
1001 (9) Storm Drainage and Downspout 1.00 15. 72.600.00 72,600.00

11 of 18 11
Department of Public Works and Highways (DPWH)
Contract ID : 17LG0121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
Location of the Contract: San Isidro, Davao Oriental

The following are the quantities and items of Work included in the scope of work

!/~
>- ~
0 ~ ITEM NO. DESCRIPTION QUANTITY UNIT COST TOTAL COST
:::l
0::
1002(8) Plumbing Fixtures 1.00 Is. 96,800.00 96,800.00
1002 (28) Cold Water Line Works 1.00 Is. 48.400.00 48,400.00
0
Water Pumping System Is. 605,000.00 605,000.00
I~ - 1201 (l) 1.00

'"w !!Cc 1202 (23) Fire Hose Cabinet 1.00 set 5,445.00

t .~ §
1100 (19) Conduits, Boxes and Fittings
1101 (18) Wires and Wiring Devices
li3 ~ 1l02(l)bl Panelboard with Main & Branch Breaker
1.00
1.00
1.00
Is.
Is.
Is.
48Aoo.oo
108,900.00
60,500.00
48.400.00
108,900.00
60,500.00
w~ -....... N.l02 (10) b Pole Mounted Transformer (OISC) 1.00 Is. 60,500.00 60,500.00
Is. 72,600.00 72,600.00

'"
'1103/ll UQhtinQ Fixtures 1.00
V1210 11) Fire Alarm System 1.00 Is. 37,510.00 37,510.00
Sub·Total3 9,412.212.09
<C
0
w D.} Construction of 2 Storey Workshop Building 4 ,.
'z 116,04.,.",

~~
.... 800 [2) ClearinQ and GrubbinQ 213.75 cU.m . 545.70
.g 803/1)0 Structure Excavation 196.98 cU.m. 491.84 96,882.64
~
c 804 (1) a Embankment from Structure Excavation 105.37 cU.m. 612.96 64,587.59
0
804 (l)b Embankment (selected borrow) cU.m. 570.37 63.784.47
0 u 111.83
~ 804 (4) Gravel Fill 33.92 cU.m. 1.655.19 56,144.04
z
w Structural Concrete (Footings and Slab on
0:: 900 (1) c2 50.71 cU.m. 7,011.37 355,546.57
Fill), Class A, 28 days
Structural Concrete (Footing Tie Beams),
900 (1) c3 17.28 cU.m. 7A84.77 129,336.82
Class A. 28 days
Structural Concrete (Columns), Class A, 28
900 (1) c4 25.89 cU.m. 7,288.04 188.687.35

I ::::>
i=~
U.S:
.4)
900 (1) c5
days
Structural Concrete (Suspended Slab),
Class A, 28 days
27.61 cU.m. 7,643.90 211,048.07
w c0'1
w
.~ ·c
'0 Structural Concrete (Beams). Class A, 28
cU.m. 219,276.06
900 (1) c6 30.44 7.203.55
k days

- .... ~
't:I
Q)
~ 902 (1) 01 Reinforcing Steel, Grade 40 27,248.42 kgs. 69.14 1,883.955.75
c::
Q) ::t:
."
903 (2) Forms and Falseworl::s 1.00 I.s. 12}89.70 12}89.70
ea. z 0
Q)
cr:

U 1000(1) Soil Poisoning 115.00 liters 423.50 48,702.50
100mm CHBNbn Lood Bearing lind.
1046 (2) 01 88.00 sq.m. 786.50 69,212.00
Reinforcing Steel)

120f 18 12
Department of Public Works and Highways (DPWH)
ContractID : 17LG0121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
Location of the Contract: San Isidro, Davao Oriental

The following are the quantities and items of Work included in the scope of work

!I~
Q
::)
0:
~ ITEM NO. DESCRIPTION QUANTITY UNIT COST TOTAL COST

150mm CHB Non load Bearing (Incl.


0 1046 (2) 02 400.00 sq.m. 1,210.00 484,000.00
Reinforcing Steel)
r~~ 1002 (3) 08 100 mm dia. G.!. Pipe ­ [Exit Staircase) 6.40 m. 701.80 4,491.52
C
~ >< ~~
ct §
1003 (9) Carpentry and Joinery Works (Blackboard) 4.00 piece 2,585.77 10,343.08

i ~~r\
1004(2)0 Locksets 8.00 set 1,815.00 14,520.00
l004(2)c Bolts 5.00 sets 60.50 302.50
~ l004(2)e Knobs 5.00 sets 1,815.00 9,075.00
LL " ~ 1004(2)f Handles 10.00 sets 302.50 3,025.00
ct
Q 1004 (2)g Hinges 85.00 pc. 363.00 30,855.00
w
IZ
~ '­
l004(2)i Grab Bar 1.00 unit 121.00 121.00

~- . c
0:0

~
1005 (1) Steel Casement Window
1005(5) Window Grilli
48.96
252.00
sq.m.
kgs.
1.229.84
121.00
60,212.96
30,492.00

~ 1009(1)0 Jalousie Window 24.05 sq.m. 695.06 16}16.19
~ Z
w 1010 (2)0 Flush Door 12.21 sq.m. 775.05 9,463.36
j 0:
c:
Q)
1010 (2) b Wood Panel 15.12 sq.m. 1,237.85 18}16.29
11'1
e0.. 1021 [I)c Plain Cement Finish with Floor Hardener 424.17 sq.m. 423.50 179,635.99
Q)
n:: 1027[1] Plain Cement Plaster Finish 1.699.22 sq.m. 396.53 673}9J .70

130f 18 13
Department of Public Works and Highways (DPWH)
Contract ID : 17LG0121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
Location of the Contract: San Isidro, Davao Oriental

The following are the quantities and items of Work included in the scope of work

>.5
0;:
::2 ITEM NO. DESCRIPTION QUANTITY UNIT COST TOTAL COST
~

1053(3]al 38mm dia. G.!. Pipe Railings 132.00 kgs. 1,210.00 159,720.00
('\ I~ 1053(3)a2
50mm0 G.I. Pipe Handrail Fully Welded
398.00 kgs. 1,210.00 481,580.00
~=
We
on Vertical Railing on 19mm bar
::2j'9 1003(1)al Fiber Cement Boord on Metal Frame 237.86 sq.m. 898.89 213,809.97

~~~!
1038(1) Reflective Insulation 315.48 sq.m. 772.03 243,560.02
1018(1) Glazed Tiles & Trims 83.92 sq.m. 570.63 47.887.26
~ o~ r.. 1018(2) Unglazed Tiles 28.92 sq.m. 664.24 19,209.82
LJ032(l)a Painting WorKs (Masonry/Concrete) 1,239.81 sq.m. 483.42 599,348.95
.f" "
1032{l)b Painting Works (Wood) 50.15 sq.m. 442.08 22,170.31
<C
0 103211) c Painting WorKs (Steel) 611.84 sq.m. 519.60 • 317,912.06
W
tZ
Prepainted Metal Sheets, Long Span,

~e
.... 1014(1]b2 290.20 sq.m. 292.85 84,985.07
~ 0.40mm thk.
~
e Fabricated Metal Roofing Accessory
0
(.) 1013(2)a 24.20 m. 786.50 19,033.30
(Ridge Roll, 0.6mm thk)
<C
>. Z Fabricated Metal Roofing Accessory
.0 W 1013(2jb 26.21 m. 484.00 12,685.64
'C 0:: (Flashing. 0.6mm thk]
$
c:
Q)
<II
!Q. Fabricated Metal Roofing Accessory
1013(2)c 47.80 m. 363.00 17,351.40
Q)
c::: (Gutter, 0.6mm thk)

'2
, ::::»
i= ....CD
U .5
W en
·CD

c:
1047(1]a Structural Steel. Trusses
loo3[lllb Fascia Board
1001(6)bl Catch Basin
1001(8) Sewer Line Works
6.672.96
20.00
1.00
1.00
kgs.
pcs.
Is.
Is.
121.00
484.00
12,100.00
84)00.00
807,428.16
9,680.00
12,100.00
84)00.00

u 1001(9) Storm Drainage and Downspout 1.00 Is. 72,600.00 72,600.00


-
111
fl.
<:t
W

140f 18 14
Department of Public Works and Highways (DPWH)
Contract ID : 17LG0121
~
W'­ Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
.2 0
«0 (Regular Workshop)
~l!!
(J)- Location of the Contract: San Isidro, Davao Oriental
«6
00
The following are the quantities and items of Work included in the scope of work

~
~~
c ~ DESCRIPTION QUANTITY
;:) ITEM NO. UNIT COST TOTAL COST
0:::

t=
1002(8) Plumbing Fixtures 1.00 Is. 96,800.00 96,800.00
1002 (28) Cold Water Line Works 1.00 Is. 48.400.00 48.400.00
f
~ v ;ec
;:).!!! 1201 (1) Water Pumping System 1.00 Is. 605,000.00 605,000.00

~~ ~ 1202 (23) Fire Hose Cabinet 1.00 set 5.445.00 5.445.00

~~~
1100 (l9) Conduits, Boxes and Fittings 1.00 Is. 48.400.00 48.400.00
1101 (18) Wires and Wiring Devices 1.00 Is. 108,900.00 108,900.00

«
c
w
.z
~
""

0
)102 (1) bl Panelboard with Main &Branch Breaker

1102 (10) b Pole Mounted Transformer (OISC)


1103 (1) Lighting Fixtures
1.00
1.00
1.00
Is.

Is.
Is.
54.450.00

60,500.00
60,500.00
54.450.00
60,500.00
60,500.00

~-
0 1210 (1) Fire Alarm System 1.00 Is. 36,265.33 36,265.33
l!!
c:
0
0
Sub·Total4 9,412.780.81
0
~
«
z
i w GRAND TOTAL 37,787,634.16
'U 0:::
.l!!
s:::
Q)
II)

~
Q.
Q)
Il::

:J
( i=.0)
0 c:

0)

150f18 15
C§ Department of Public Works and Highways (DPWH)
w ....
IZ 0 Contract ID : 17LG0121
In«1)~ Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
~ 8 (Regular Workshop)
l":::'--+--": Location of the Contract: San Isidro, Davao Oriental

4. The ENTITY hereby covenants to pay the CONTRACTOR in consideration of the


execution and completion of the Works, the unit prices in the CONTRACTOR'S
calculated bid as applied to the actual quantities accomplished as certified by the
PROCURING ENTITY under the provisions of the CONTRACT AGREEMENT at
the times and in the manner prescribed by this CONTRACT AGREEMENT.

5. The Contractor warrants that he has not given nor promised to give any money or
gift any employees of the ENTITY (or any Philippine Government Instrumentality)
to secure this contract.

160f18 16
IN WITNESS whereof the parties thereto have caused this CONTRACT
AGREEMENT to be executed the day and year first before written.

Signed, sealed, delivered by CYNTHIA GRACE C. TIU the OIC - District


Engineer DPWH 2nd DEO Mati, Davao Oriental (for the Procuring Entity)
Signed, sealed, delivered by RENATa R. CASTANEDA the Proprietor

Rely Construction & Supply


(for the Contractor)

Binding Signature of PROCURING ENTITY

Binding Signature of Contractor

rJ-
RENATa R. CASTANEDA .CASTA~EDA
Managing Partner Office ngineer

....,~a
Approved this Z,,- day of D€Z.e- M~ ,2017.

170f 18 17
Department of Public Works and Highways (DPWH)
ContractID : 17LG{)121
Contract Name : Construction of 2 Storey Workshop Building, San Isidro NHS
(Regular Workshop)
' ...o Location of the Contract: San Isidro, Davao Oriental

ACKNOWLEDGEMENT

Republic of the Philippines)


Davao Oriental... ............ )

Before me, A Notary Public for and in the Province of Davao Oriental personally
appeared:

NAME: COMM. TAX CERT. NO. DATE/PLACE


ISSUED

CYNTHIA GRACE C. TIU


RENATO R. CASTANEDA
Known to me and to me known to be the same persons who executed the foregoing
instruments which consists of eighteen (18) pages including this page on which this
acknowledgment is written and acknowledge to me that the same is their free and voluntary
act and deed.

WITNESS MY HAND AND SEAL on this 27.~ day of --"_.,--_ _ _ .2017


at__ DA\W? CITi

Doc. No. ~
Page No. ~
Book No.
Series of :.:tt2>~

180f18 18

You might also like