Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

HOUSEKEEPING SCHEDULE

EQUIPMENT TYPE Multi- Tester


EQUIPMENT CODE EIM0015
LOCATION Practical Work Area

Schedule for the Month


ACTIVITIES Responsible of March 2024
Person

Monthly
Remarks

Weekly
Other
Every

Every
Daily

15th
Day
day
1. Calibrate the Trainees or / Done
multimeter at Maintenance before
frequent and after
intervals. every use.
2. Protect the Trainees or / Done
instruments Maintenance before
from dust, and after
fumes, every use.
moisture, and
heat
3. Change or Trainees or / Done
replace the Maintenance before
ohmmeter and after
battery (if every use.
necessary
needed).
4. When checking Trainees or / Done
the resistance Maintenance before
of the circuit, and after
make sure to every use.
switch off the
power to the
circuit.
5. Start with the Trainees or / Done
highest range Maintenance before
of and after
measurement every use.
and move down
successively to
prevent
overload of the
water.
6. Ensure the Trainees or / Done
polarity of the Maintenance before
circuit before and after
connecting. every use.
7. Make all Trainees or / Done
resistance Maintenance before
readings in the and after
uncrowded every use.
portion on the
scale.
8. Choose the volt Trainees or / Done
meter range. Maintenance before
and after
every use.
Inspected by: Date:

Fernando Q. Cabalona March 27, 2024


Inspector

You might also like