GATE MN: STRATEGY AND PLAN FOR GATE 2024

MINE GATE
Section Subject Completion Time (in Hr)
GA General Aptitude 60
Section: 1 Engg. Mathematics 50

Mining Geology 10
Section: 2 Mine Development 35
Mine Surveying 40
Engineering Mechanics 25
Section:3 Rock Mechanics (Geomechanics, 60
Ground Control) Now Ihave 140 days
If you study daily 8 Hr 560/8-7O Day
Mining Methods 60
If youstudy daily 10 Hr 560/10 =56 Day
Section:4
Mining Machinery 40
Surface Environment 25
Section:5 Mine Ventilation 50
UG Hazards 25
Mineral Economics 15
Section: 6 Mine Planning 30

Systems Engineering 35

Grand Total 560