1 Date of PM (mm/dd/yyyy)
23/3/2023
2 Site ID
fjwr07
2 First Aid kit and fire extinguisher (DCP) are available with PM Select Status
team
First Aid kit and fire extinguisher
3 Site specific risk assessment has been conducted with Select Status
appropriate control measures implemented
Site specific risk assessment has been conducted
4 Company ID cards and Proof of trainngs available for site Select Status
team (Nokia Health and Safety induction, electrical safety
certificates, etc.)
Company ID cards and Proof of trainngs
5 Safety Climbing system (on tower) correctly installed (fixing Select Status
elements, connection screws, fall arrestors,)
Safety Climbing system (on tower)
6 Adequate lifting equipment / tools (rope and pulleys etc) are Select Status
used and fit for purpose
Adequate lifting equipment
7 Is the team aware of Nokia's Life Saving Rules and Nokia Select Status
Non-negotiables for work at height. Are they familiar with
FASTEN?
Team aware of Nokia's Life Saving Rules, FASTEN?
8 Are all climbers certified by NOKIA and medically fit for Select Status
working at heights?
Provide Picture of Nokia certificate for WAH
10 Did you perform a Daily Vehicle Inspection and completed Select Status
Journey Management Plan?
Daily Vehicle Inspection and completed Journey Management Plan
B: Rectifier
No Activity Status/Comments
1 OMO Power Status Select option:
11 Rectifier-1 Capacity
18Kw
Rectifier-2 Brand
28 Rectifier-2 Capacity
Rectifier-3 Brand
45 Rectifier-3 Capacity
Rectifier-4 Brand
62 Rectifier-4 Capacity
No of
faulty
Rectif
ier Comments
Back
plane
/Slots
C: Battery Bank
No Activity Status/Comments
1 QTY of Battery Banks Select option:
Battery Bank-2 Temp Sensor Extended from Rectifier to Battery Bank Cabinet
Battery Bank-3 Temp Sensor Extended from Rectifier to Battery Bank Cabinet
No Activity Status/Comments
1 Fire/Smoke Detection Select option:
Fire/Smoke Detection
No Activity Status/Comments
1 AC Failure Select option:
AC Failure
No Activity Status/Comments
1 BTS Cabinet Hex Fan Cleaning Select option:
XIF Alarm
13 Any supporting rod missing for 1.2 m dish or above than 1.2 Select option:
m
Any supporting rod missing for 1.2 m dish or above than 1.2 m
14 Check all nuts and bolts of diversity frame, GSM antenna Select option:
mounts and poles, U-bolts etc
Nuts and bolts of diversity frame, GSM antenna mounts and poles,
U-bolts etc
15 Remove rust from all nutts and bolts of diversity frame, Select option:
GSM/MW antenna mounts and poles, U-bolts etc
17 Any substandard material ( U-bolts, any nutts and bolts, Select option:
brackets etc.)
18 IF and Feeder Cables Properly Routed and Tied Up With Select option:
Tower
IF and Feeder Cables Properly Routed and Tied Up With Tower
No Activity Status/Comments
1 Site Cleaning Done (Vegetation Removal) Select option:
11 Check Fire Alarm board and battery of the Fire System Select option:
OB Light Status
Safety Sign