1. Both back sights and fore sights in leveling are ready in the same horizontal line defined by a level machine. 2. Dumpy, tilt, automatic levels need non-coded staffs to record differences in heights between two points. 3. For the ordinary loop leveling, Misclosure is given by (12 K ) mm where K is the distance in Km. 4. In leveling geoid is the same the level surface but not equipotential surface 5. In plane table surveying both distances and angles are plotted. 6. In surveying both gross and systematic errors have the same treatments since they obey physical laws. 7. Inter-visibility is one of the factor that need to be considered when choosing a baseline for survey. 8. Radiation, Intersection, Traversing and Resection are methods of surveying with plane table. 9. The plane table surveying is the fast method of surveying because plotting of the plan and field observations can be done simultaneously. 10.When surveying with plane table either a chain or tape is not important.