Performance Re-Qualification Blister Alu Alu
Performance Re-Qualification Blister Alu Alu
OF
ALU-ALU BLISTER MACHINE
NAME OF THE EQUIPMENT : Alu-Alu Blister Machine
EQUIPMENT NO. :
RQ PROTOCOL NO. :
RQ REPORT NO. :
MAKE :
CAPACITY :
LOCATION :
TABLE OF CONTENTS
S. No. TITLE PAGE No.
1.0 Pre Approval 3
Overview 4-5
2.1 Purpose 4
2.0 2.2 Background 4
2.3 Responsibility 4
2.4 Equipment Description 5
Performance Re-Qualification Procedure 6 -9
3.1 Training 7
3.2 Equipment Identification 7
3.0 3.3 Verification of Performance of the Alu-Alu Blister Machine 8
3.3.1 Performance Verification at Slow Speed/High Temperature 8
3.3.2 Performance Verification at Fast Speed/Low Temperature 9
3.4 Deviation and Corrective Action 10
4.0 Acceptance criteria 11
5.0 Summary and conclusion 11
6.0 Post approval signature 12
Appendix 13
7.0 7.1 Abbreviation 13
7.2 List of Document 13
JSA VALIDATION SERVICES
BADDI, H.P-BHARAT (INDIA)
Prepared by
Reviewed by
Approved by
Authorized by
JSA VALIDATION SERVICES
BADDI, H.P-BHARAT (INDIA)
2.0 OVERVIEW
The Performance Re-Qualification of Alu-Alu Blister Machine is carrying out in order to provide the
high degree of assurance that the equipment performed as intended and remain in the state of control.
2.1 PURPOSE
The purpose is to provide an outline for the Performance Re-Qualification of equipment for
performance attributes to verify that:
• The system meets the user requirement Specification.
• Document the verification that equipment performs consistently and in the state of control.
• Assure that Alu-Alu Blister Machine is adequate to support the process for which the system is
intended.
2.2 BACKGROUND
The Alu-Alu Blister Machine supplied by Rapid Pack, Equipment I.D. XXXXX installed in Alu Alu
Blister Packing Area at XYZ (Company Name). This protocol defines the methods and documentation
that shall be used to evaluate the performance attributes of Alu-Alu Blister Machine in accordance with
the user requirement specifications and intended use. The Reason for this requalification is
Periodic/Schedule Performance Requalification
2.3 RESPONSIBILITIES:
2.3.1 Quality Assurance:
• To prepare/Review and Approval of the Performance Re-Qualification protocol and report.
• To Impart the Training to the team before the execution of protocol
• To execute the Performance Re-Qualification protocol along with other department
• To monitor protocol completeness and technical accuracy.
2.3.2 User Department
• To Review of the Performance Re-Qualification Protocol/Report.
• To monitor the validation activities and ensuring performance attributes as per the protocol.
• To monitor protocol completeness and technical accuracy.
• To review the data and approved the qualification procedure, if found satisfactory.
• To provide personnel to assist in the execution of the protocol/report.
JSA VALIDATION SERVICES
BADDI, H.P-BHARAT (INDIA)
Overprinting Station: it consists of Ink cartridge, pressure roller and the stereo roller. This station is
used to have a batch code printed on the foil. Ink used is DIPL 39 and thinner is DIPL 20. The mixture
of 60:40 is used for putting on the ink roller.
3.0 Performance Re-Qualification Procedure
The following procedure shall be used for performance of Alu-Alu Blister Machine:
• Training shall be imparted to the concerned personal on Performance Re-Qualification protocol.
• Verification of performance of machine done at slow speed high temperature and fast speed and low
temperature.
• Operate the machine as per respective standard operating procedure and set the required parameter in
control panel as per product BMR.
• Record the observation in the protocol.
• Record the observations in respective section given in the protocol.
• The Performance of Alu-Alu Blister Machine shall be evaluated for minimum and maximum speed
and temperature.
• Suitable conclusion shall be drawn after completion of Performance Re-Qualification.
• Any deviation observed during qualification shall be recorded in the observed deviation, corrective
action and justification report section.
• Observed deviation shall be reported to the department head and quality head.
• If the observed deviation does not have any major impact on the qualification the final conclusion
shall be provided.
• If the observed deviation has major impact on the qualification, deviation shall be reported to the
manufacturer for the corrective action and qualification activity shall be done.
3.1 Training
The qualification team member shall be trained on the protocol execution of qualification activity and
report compilation.
Model RP MACH-1+
Equipment Location
PRODUCT NAME__________________________________________________
BATCH NO.______________________________________________________
PRODUCT NAME__________________________________________________
BATCH NO.______________________________________________________
Comments:…………………………………………………...….……………………..………………
………………………………………………………………………………………………………
Executed by
Reviewed by
Approved by
Authorized by
JSA VALIDATION SERVICES
BADDI, H.P-BHARAT (INDIA)
7.0 APPENDIX
7.1 ABBREVIATIONS
Kg : Kilogram
END OF DOCUMENT