Hitachi Combine Operation Boom Function Abnormal

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Hitachi EXC/3/2024 Combine operation Boom function abnormal

Valid for

Machine Model : ZX 210 LCH 3F


Machine Serial No : 214051
Engine Model : ISUZU
FGI : 9
Engine Run Hour : 18336hr

Case description

The machine of hydraulic function was slow. All attachment was slow. Machine Name plate
Delivery pressure abnormal. pump flow was abnormal.

Symptom

Boom function was slow .


Combine operation boom function was slow .

Reason
Hour Meter
firstly attachment function slow problem cause of torque control solenoid valve did not work.
Pump 1 & 2 delivery pressure wasn't normal condition cause of the delivery pressure sensor was damaged.
Combine operation boom function slow problem cause of boom flow rate control valve spool spring and arm2 flow rate
control valve spool spring was wrong assembly.

Action

firstly we checked torque control solenoid and max pump 2 flow rate control solenoid .And we found solenoid valve seal was
damaged .So we replactd new one .And we checked 3spools solenoid SC,SF,SI and SG. And then we tested run the machine
.Attachment function slow problem was OK. But boom function was still slow. So we checked boom anti-drift valve and arm
anti-drift valve .At the same time we checked boom flow rate control valve and arm 2 flow rate control valve .We found
wrong assembly boom spool spring and arm2 spool spring .So we installed normal condition .And we tested run the machine
.Boom function slow problem was OK. And combine function abnormal problem was OK.
Damage Parts Damage Parts Machine Photo

Suggestion

Firstly service team should be checked pump 1&2 delivery pressure ,control pressure.

Parts

Part Number Description Quantity


Delivery Pressure sensor 1

Issued by Appreciate to reporter

TECHNICAL DEVELOPMENT DEPARTMENT San Chein Tun