1. INTRODUCTION OF SYSTEM
•The project development is not an easy job.Every aspect of the ‘software design’
project should be well analyzed and data should be in a verystructured manner.
Duplicity of the data should beavoided, to the point and descriptive fields should
betaken. I have put my best efforts to computerize
the process of Academic System and other relevantdetails for ready reference to the be
st of myinformation about this. It is a very comprehensiveand complicated job, which
involves many persons;whatever I have analyzed is detailed portion of
recordentries.The main outcome is shown through the help of different reports.
Various reports that are made in the project are:-

List of products

List of Pizza detail


2.MAINTENANCE
The goal of the system development project is to producesoftware which is easy to
maintain because during the life of software the maintenance cost generally exceed
the developmentcost one possible reason of exceeding cost is that the
developer frequently develop the software, install it, and than hand it over to different
set of people called maintainers. But the
maintainer usually don’t even belong to the organization that developsoftware so first
of all we have to give proper training to staff about the system and teach them how to
handle it, operate it andwhat to do in saturation when it is not performing well or
thedelivery of the system.once the system has been settled down and been
runningfor some years then responsibility handed to the trainedmaintainer during
maintenance the system analyst has to check that weather system performed
according to the started
objectiveor not during maintenance we have to keep eyes on thefunctioning of new
system like addition of record, showing and payment entry etc, and check whether it is
performing wellaccording to required specified.
3. SCOPE OF SYSTEM
First Access is obviously a database application. Databaseallows you to collect any type of
information for storage andlater searching and retrieval.Access excels at being able to
collect information.
Throughthe use of either a datasheet view or a custom form. Thedatasheet view provides a
spreadsheet similar to MicrosoftExcel. You can create custom forms that can look like all
other Windows applications and use these together and retrieveinformation.You can also cr
eate custom reports for printing andexporting the information stored in
the database.Second Access is desktop database. This means Access isdesigned to be used
on a desktop computer. You can place anAccess file on a network server and share the
database withother user on the network. It is not however a true client server database the
Access is a fire stored on hard drive, not a runningapplication.
.

First Access is obviously a database application. Databaseallows you to collect any type of
information for storage andlater searching and retrieval.Access excels at being able to
collect information.
Throughthe use of either a datasheet view or a custom form. Thedatasheet view provides
a spreadsheet similar to MicrosoftExcel. You can create custom forms that can look like all
other Windows applications and use these together and retrieveinformation.You can also c
reate custom reports for printing andexporting the information stored in
the database.Second Access is desktop database. This means Access isdesigned to be used
on a desktop computer. You can place anAccess file on a network server and share the
database withother user on the network. It is not however a true client server database
the Access is a fire stored on hard drive, not a runningapplication.
4. OBJECTIVES
..The Project management is the application of planningorganizing and control conc
epts to critical one-of
a kind projects. Management projects require top managementcommitment,
active- Participation and long –range plan. Thefundamental objective of a project
work is to demonstrate howtedious manual work using the computer capabilities
can easilydo.The main objective of my project is that it shows the critical jobs in the
object schedule, explains the relationships
between jobs, and generates reports and schedules as needed.Specifically, it does
the following:-
1.Determine the jobs that require quick and secureProcess to compile
the computerized booking.
2. Determines the jobs, which save time that can beDelayed without it..
3. Maintains a schedule in sequence is preferred.
.
5. Keeps track of important deadlines and significant aspectsthroughout
the project.
6. Investigates trade offs between work cost and time.
7. Changes the aspects of a job and immediately shows theimpact
performance on the overall project.
..AR Digrampizza shope management…
SYSTEM TESTING
This is phase, which comes after coding in which we are restingthe overall system. First it test the module separately and finally
thesystem as whole. Each module and program is tested first and thanthrough the interface to the other subsystems the
complete system istested this is the most important face as the system analyst has to getuser certification for the accuracy of the
system of the acceptancetesting by the user. The user representative, the system analyst,
thestandards groups, the external system auditor or any other combination should carry out such a testing test data is normally p
repared by the user to check for all possible combinations of correctdata as well as the wrong data which should be trapped by
the systemand reported as an error. The various level used in testing are unittesting, integration testing and system testing .

In unit testing:
different modules are tested against thespecification produced during design for the module like testing Add,Show module
whether these modules adding and then show the recordcorrectly or not. This phase is essentially for verification of
code produced during the coding phase and to test the internal logic of themodules.


Integration testing:
in this many unit testing modules arecombined into subsystem, which are then tested the goal here is to seeif the modules are
integrated properly or not like after adding recordsshow perfectly showing the added record and perform the other task like
transaction and installment payment etc. on the record added

In system and acceptance testing:
the entire system is tested thereference document for this process is the requirement document andthe goal is to see if the
software meets its requirement. The followingformat given below is dummy data. In which total amount are
15129,this is the correct format. In case if we add record of the samecompany again, it will give an error message that company
is already present would like to add for the same company or not