INSTALLATION OF HIGH SECURITY (CITADEL) FENCING AT AWOBA JOB HAZARD ANALYSIS TEAM COMPOSITION
DABEL
PREPARED BY REVIEWED BY AUTHORIZED BY CHECKED BY AMADI GEORGE SITE SUPERVISOR ALEX OMORUYI PROJECT MANAGER OLOWU, CHIBUZO HSE SUPPORT IDUME SUNDAY HSE-OFFICER ADEBIYI, ADEWOLE PROJECT ENGINEER
SPDC
REVIEWED BY SUPPORTED BY SOBOWALE, KOYE PRINCIPAL ENGR. NOGI APPROVED BY EZEKWEM, GEORGE HEAD CIVIL TEAM
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba Task: Task: Mobilization to Site A B C D E
S/N Task Steps Hazards/ Hazards Source Threats
1.1.1 Incompetent Driver 1.1.2 Exhaustion of Driver (Fatigue) 1.1.3 Drug/Alcohol Abuse by Driver 1.1.4 Poor Weather Condition (Rain or Nightfall) 1.1.5 Faulty Vehicle 2.1.1 Working with torn PPE 2.1.2 Poor Lifting Pocedure 2.1.3 Horse Play 2.1.4 Poor Supervision Musculo-Skeletal Disorders Man Overboard Drowning Fatality Exceed Injury to Strain Personnel Threshold Acute Back Problems
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday F G H I J
What/Who May Be Harmed
Personnel Materials/ Equipment Asset Reputation
Top Event
Loss of Control
Consequence
Injury to Personnel Loss of Materials/ Tools Fatality.
Inherent Risk
H P4D M A3C M R3C
Control Measures
C1.1.1: Use Certified Equipment C1.1.2: Ensure Driver is Medically Certified
Recovery Measures
R1.1.1: First Aid Treatment
Action Parties
Amadi George C1.1.1, C1.1.5
1 .
Transport Land Materials Transportation from Base to (Vehicle In Jetty Motion; Reckless Drivers & Weather Condition)
HS. Vehicle 2 Load / OffLoad Materials Manual Materials Handling, / Sharp Edges of Tools
Idume Sunday R1.1.2: C1.1.2, C1.1.3, C1.1.3: Reduce Speed if Provide C1.1.4 Rainy & Observe "No Medivac to Night Driving" Rule Retainership Chibinma C1.1.4: Driver Induction Clinic Etegba, before Commencement R1.1.3: R1.1.1, R1.1.2 of Work Activate C1.1.5: Adhere to Idume Sunday Emergency Journey Mgt. Plan R1.1.3 Response
C2.1.1: Provide Appropriate and Adequate PPEs (Hand Gloves, PFD, Coverall) C2.1.2: Follow Approved Lifting Procedure C2.1.3: Avoid Horse Play C2.1.4: Ensure Strict Supervision C2.1.5: Conduct Toolbox Meeting before Work Starts.
Personnel Asset
M P3C
(Lift and Drop Equipment / Material onto HS: Materials, & from Ramp barge Objects at the Jetty) Overhead Work Over Water
Amadi George R2.1.2: C2.1.2, C2.1.3, Provide C2.1.4 Medivac to Retainership Chibinma Clinic Etegba, R2.1.1, R2.1.2 R2.1.3: Activate Idume Sunday Emergency R2.1.3, R2.1.4 Response R2.1.4: Use of Life Buoy, Rescue Stick & Whistle 2
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba Task: Task: Mobilization to Site A
S/ N.
3.
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday F G
Inherent Risk
H P4D Materials/ Equipment
B
Hazards/ Hazards Source
Water Transport (Boating, Tidal Wave / Logs in Waterway, Adverse Weather Condition)
C
Threats
3.1.1 Drug/Alcohol Abuse by Crew
D
Top Event
H
Control Measures
C3.1.1: Alcohol / Drug Policy in place & Communicated C3.1.2: Ensure Crew is Medically Certified C3.1.3: Use Competent Cabin Crew C3.1.4: Reduce Speed if Rainy & Observe "No Night Sailing" Rule C3.1.5: Adhere to Journey Mgt. Plan C3.1.6: Warning Signs / Notices & Use of Barrier Tapes on Edge of Barges. C3.1.7: Provide Effective Means of Communication.
I
Recovery Measures
J
Action Parties
Task Steps
Move Materials, Equipment & Personnel on Waterways to site.
Loss of control (Drifting / 3.1.2 Medically Unfit Sinking of Crew Barge) 3.1.3 Incompetent Crew 3.1.4 Poor Weather Condition (Rain or Nightfall) 3.1.5 Sailing in Unauthorised Routes 3.1.6 Poor Vessel Condition 3.1.7 Lack of Effective Communication
M A3C
Asset
M R3C
R3.1.1: First Amadi Aid Treatment George C3.1.1, C3.1.6, R3.1.2: C3.1.7 Provide Medivac to Idume Retainership Sunday Clinic C3.1.2, C3.1.3, C3.1.4, C3.1.5 R3.1.3: Activate Chibinma Emergency Etegba Response R3.1.1, R3.1.2 R3.1.4: Use of Idume Life Buoy, Sunday Rescue Stick R3.1.3, R3.1.4 & Whistle
Reputation
Water-Borne Operations
Personnel
H P4D, M R3C
C3.2.1 Avoid Horse Play C3.2.2: All workers to be swim certified C3.2.3: Ensure Strict Supervision C3.2.4 Use Appropriate PPE (PFD/Life- Vest, Protective Aprons) C3.2.5:Create Awareness on discontinued use of rain boot C3.2.6:Employ buddy system in personnel deployment
Reputation
R3.2.1: First Idume Aid Treatment Sunday C3.2.1, C3.2.2, R3.2.2: C3.2.4, C3.2.5, Provide Medivac to Amadi Retainership George Clinic C3.2.3, C3.2.6 R3.2.3: Activate Chibinma Emergency Etegba Response R3.2.1,R3.2.2 R3.2.4: Use of Idume Life Buoy & Sunday Rescue Stick R3.2.3, R3.2.4
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba Task: Site Preparation / Excavation Works
A B C D E
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday
F G H I J
Threats
Top Event
Inherent Risk
H P4D
Control Measures
Recovery Measures
R1.1.1: First Aid Treatment
Action Parties
1.1.1 Overgrown Grasses 1.1.2 Inadequate Pest Control 1.1.3 Poor Housekeeping
Exposure to Severe Pain / Dangerous Swelling / Reptiles Bleeding Pest Infestation Respiratory Stress Injury Fatality
C.1.1.1 Fumigation of the Work Area. C1.1.2: Provide appropriate and adequate PPE (Hand Gloves & Protective Apron) C1.1.3: Conduct Tool talk
HS: Animal,
R1.1.2: Provide Amadi George Medivac to C1.1.3, Retainership Chibinma Etegba Clinic R1.1.1, R1.1.2 R1.1.3: Activate Idume Sunday Emergency R1.1.3 Response
1.2.1 Defective Tools 1.2.2 Wrong Use of Tools 1.2.3 Poor Supervision 1.3.1 Unprotected Personnel
Loss of Control.
Personnel Asset
M P3C, A3C,
C1.2.1 Use of Correct Tools C1.2.2: Ensure Adequate Supervision C1.2.3: Conduct Tool Talk
R1.2.2: Provide Amadi George Medivac to C1.2.3, Retainership Chibinma Etegba Clinic R1.2.1, R1.2.2 R1.3.1: First Aid Treatment Idume Sunday C1.3.1, C1.3.2, C1.3.3
Personnel
M P3C,
C1.3.1 Provide Appropriate PPEs (Hand Gloves, Coverall, Nose Masks, Eye Goggle etc) C1.3.2: Use Competent Personnel C1.3.3 Conduct Tool Talk
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Krakrama Task: Site Preparation / Excavation Works
A B C D E
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Odoh Timothy, Nwachi Ogbonna
F G H I J
Threats
Top Event
Inherent Risk
Control Measures
Recovery Measures
Action Parties
Excavate for Flying Particles Fence Post Bases & Ground HS: Excavation Beam Area, Hand Tools
2.1.1 Throwing Out of Sand / Excavated Material from Trench 2.1.2 Poor Supervision
Personnel
C.2.1.1 Shutting of Excavated Wall. C2.1.2: Adhere to Work Method Procedure C2.1.3: Conduct Toolbox Talk C2.2.1 Conduct Toolbox Talk C2.2.2 Use Leather Hand Gloves and Protective Aprons
Asset
Underground Facility
Personnel
R2.1.2: Provide Amadi George Medivac to C2.1.3, C2.1.4 Retainership Chibinma Etegba Clinic R2.1.1, R2.1.2 R2.1.3: Activate Idume Sunday Emergency R2.1.3 Response R2.2.1: First Idume Sunday Aid Treatment C2.2.1, C2.2.2
Asset
Reputatio n
R2.2.2: Provide Amadi George Medivac to C2.2.3 Retainership Chibinma Etegba Clinic C2.2.3: Isolate Facility R2.2.3: Activate R2.2.1, R2.2.2 / Equipment Emergency Idume Sunday Response R2.2.3
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Krakrama
Task: Welding Works (Working Platform & Fabricated Steel Brackets) A S/N. Task Steps B Hazards/ Hazards Source C Threats D Top Event E Consequence
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Odoh Timothy, Nwachi Ogbonna
F What/ Who May Be Harmed G Inherent Risk H Control Measures I Recovery Measures J Action Parties
Wrong Welding Procedure / Sharp Edges (Objects Under Tension) & Voltage in Cable HS: Steel Pipes, Grating, Welding Equipment Water-Borne Operations
1.1.1: Use of Equipment Incompetent Personnel Failure / Loss of 1.1.2: Use of defective Control Tools 1.1.3: Poor Supervision 1.1.4: Flow station Facility Failure
Personnel Asset
C1.1.1: Provide appropriate and adequate PPE (Hand Gloves, Eye Goggle & Fire Retardant Coverall, etc) C1.1.2: Use of Approved Work Method. C1.1.3: Ensure Adequate Supervision
R1.1.1: First Aid Treatment R1.1.2: Provide Medivac to Retainership Clinic R1.1.3: Activate Emergency Response
Idume Sunday
C1.1.1, C1.1.2
Amadi George
C1.1.3, Chibinma Etegba R1.1.1, R1.1.2
Loss of Explosion / Fire Containment (Gas Leakage) Man Overboard (Fall into Water by Personnel) Drowning Personnel
Idume Sunday
R1.1.3 R1.2.1: First Aid Treatment R1.2.2: Provide Medivac to Retainership Clinic R1.2.3: Activate Emergency Response R1.2.4: Use of Life Buoy & Rescue Stick R2.1.1: First Aid Treatment R2.1.2: Provide Medivac to Retainership Clinic R2.1.3: Activate Emergency Response
H P4D, M R3C
C1.2.1: All workers to be swim certified C1.2.2: Ensure Strict Supervision C1.2.3 Use Appropriate PPE (PFD/Life- Vest, Protective Aprons) C1.2.4:Employ buddy system in personnel deployment C2.1.1 Conduct Tool talk C2.1.2: Provide appropriate and adequate PPE C2.1.3: Use of Approved Work Method. C2.1.4: Ensure Adequate Supervision
Idume Sunday
C1.2.1, C1.2.3,
Fatality
Reputation
Amadi George
C1.2.3, C3.2.4 Chibinma Etegba R1.2.1,R1.2.2
Idume Sunday
R1.2.3, R1.2.4
Wrong Welding Procedure / Sharp Edges (Objects Under Tension) & Voltage in Cable
2.1.1: Use of Incompetent Personnel 2.1.2: Use of defective Tools 2.1.3: Poor Supervision
Personnel Asset
Idume Sunday
C2.1.1, C2.1.2
Amadi George
C2.1.3, C2.2.4 Chibinma Etegba R2.1.1, R2.1.2
HS: Steel Bracket, 2.1.4: Flow station Welding Equipment Facility Failure
Idume Sunday
R2.1.3
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba
Task: Installation of +/- 375m Welded Mesh (Citadel) Fence A B C D E
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday
F G H I J
Threats
Top Event
Inherent Risk
M P3C
Control Measures
C1.1.1: Conduct Tool box Talk C1.1.2: Ensure Proper Handling & Lifting Procedure C1.1.3: Use of Correct PPEs (Hand Gloves, Safety Shoes, etc) C1.1.4 Use Competent Personnel C1.2.1 Conduct Tool Talk C1.2.2: Use of Correct Tools C1.2.3: Ensure Adequate Supervision C1.3.1: Harness Belt to be Worn at all times. C1.3.2: Use of Competent Personnel C1.3.3: Check for Stability & Integrity of the Working Platform
Recovery Measures
R1.1.1 First Aid Treatment. R1.1.2: Provide Medivac to Retainership Clinic
Action Parties
Idume Sunday C1.1.1, C1.1.3 Amadi George C1.1.2, C 1.1.4 Chibinma Etegba R1.1.1, R1.1.2
1.1.1 Lifting Exceed Excessive Loads Strain Threshol 1.1.2 Bad d Positioning during Lifting / Loading. 1.1.3 Use of Incompetent Personnel
Asset
1.2.1 Defective Loss of Tools Control. 1.2.2 Wrong Use of Tools 1.2.3 Poor Supervision 1.3.1: Working Fall from with torn PPEs Height 1.3.2: Use of Incompetent 1.3.3: Use of Faulty Working Platform /Ladder
Personnel
M P3C, A3C,
R1.2.1: First Aid Treatment R1.2.2: Provide Medivac to Retainership Clinic R1.3.1: First Aid Treatment R1.3.2: Provide Medivac to Retainership Clinic
Idume Sunday C1.2.1, C1.2.2, Amadi George C1.2.3, Chibinma Etegba R1.2.1, R1.2.2 Idume Sunday C1.3.1, C1.3.2, Amadi George C1.3.3 Chibinma Etegba R1.3.1, R1.3.2 Idume Sunday R1.3.3
Asset
Personnel
Asset
Reputation
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba
Date:14/07/2011
JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday
F G H I J Action Parties
S/N.
1
Task Steps
Construction of Formwork
Threats
1.1.1: Poor House Keeping (Littered Formwork) 1.1.2: Working with torn PPEs 1.1.3: Poor Supervision
Inherent Risk
M P3C M A3C
Control Measures
C1.1.1: Ensure Good House Keeping C1.1.2: Use of Correct PPEs (Hand Gloves, Safety Shoe, Hard Hat, Nose Mask, Eye Goggles) C1.1.3 Close Supervision C2.1.1: Use of Correct PPEs (Hand Gloves, Safety Shoe, Hard Hat, Nose Mask, Eye Goggles) C2.1.2: Use of Competent and Medically Fit Personnel C2.1.3: Ensure Proper Handling & Lifting Procedure
Recovery Measures
R1.1.1: First Aid Treatment
R1.1.2: Provide Amadi George Medivac to C1.1.3 Retainership Clinic Chibinma Etegba R1.1.1, R1.1.2
Laying of Sharp Edges / Reinforceme Objects nt Bars (Cut and Bend Rebar to Size HS: Materials / and Shape) Tools
2.1.1: Working with torn PPEs 2.1.2: Use of Incompetent Personnel 2.1.3: Horse Play
Exposure Injury to of Personnel Personne l to Sharp Edges of Steel Bars. Slip & Fall
Personnel
M P3C
R2.1.2: Provide Amadi George Medivac to C2.1.3 Retainership Clinic Chibinma Etegba R2.1.1, R2.1.2
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba Task: Construction of Formwork /Laying of Reinforcement / Concrete Work
A B C D E
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday
F G H I J Action Parties
S/N.
Task Steps
Threats
Inherent Risk
M P3C
Control Measures
Recovery Measures
R3.1.1 First Aid Teatment R3.1.2: Provide Medivac to Retainership Clinic
3.
Concrete Work (Casting of Concrete for Fence Post Bases & Ground Beam)
3.1.1Cement Usage 3.1.2: Working without appropriate PPEs 3.1.3: Use of Incompetent Personnel 3.1.4: Poor Loading Technique
C3.1.1: Use of Correct PPEs (Hand Gloves, Safety Shoe, Hard Hat, Nose Mask, Eye Goggles) C3.1.2: Use of Competent and Medically Fit Personnel C3.1.3 Close Supervision
Idume Sunday C3.1.1, C3.1.2 Amadi George C3.1.3 Chibinma Etegba R3.1.1, R3.1.2
10
Fresh Concrete
3.2.1: Working with torn PPEs 3.2.2: Use of Incompetent Personnel 3.2.3: Poor Supervision 3.2.4: Improper Lifting Position
Exposure Skin to Wet Irritation Concrete Slip & Fall Loss of Control
Personnel
M P3C
C3.2.1: Use of Correct PPEs (Hand Gloves, Safety Shoe, Nose Mask, etc) C3.2.2: Use of Competent and Medically Fit Personnel C3.2.3: Ensure Proper Handling & Lifting Procedure
Idume Sunday C3.1.1, C3.1.2 Amadi George C3.1.3 Chibinma Etegba R3.1.1, R3.1.2
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba Task: Installation of Citadel Gates
A B C D E
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday
F G H I J Action Parties
S/N.
Task Steps
Threats
Inherent Risk
M P3C
Control Measures
Recovery Measures
R1.1.1 First Aid Treatment. R1.1.2: Provide Medivac to Retainership Clinic
Installation of 1 No. Double Leaf Citadel Gate & 1No Pedestrian Gates.
1.1.1 Lifting Exceed Excessive Loads Strain Threshol 1.1.2 Use of d Incompetent Personnel 1.1.3 Poor Supervision
Asset
C1.1.1: Conduct Tool box Talk C1.1.2: Ensure Proper Handling & Lifting Procedure C1.1.3: Use of Correct PPEs (Hand Gloves, Safety Shoes, etc) C1.1.4 Use Competent Personnel
Idume Sunday C1.1.1, C1.1.3 Amadi George C1.1.2, C 1.1.4 Chibinma Etegba R1.1.1, R1.1.2
11
1.2.1 Defective Loss of Tools Control. 1.2.2 Wrong Use of Tools 1.2.3 Poor Supervision 1.3.1: Working with torn PPEs 1.3.2: Use of Incompetent & Medically Unfit Personnel 1.3.3: Use of Faulty Working Platform/Ladder
Personnel
M P3C, A3C,
Asset
Personnel
C1.2.1 Conduct Tool Talk C1.2.2: Use of Correct Tools C1.2.3: Ensure Adequate Supervision C1.3.1: Harness Belt to be Worn at all times. C1.3.2: Use of Competent and Medically Fit Personnel C1.3.3: Check for Stability & Integrity of the Working
R1.2.1: First Aid Treatment R1.2.2: Provide Medivac to Retainership Clinic R1.3.1: First Aid Treatment R1.3.2: Provide Medivac to Retainership Clinic R1.3.3: Activate Emergency Response
Idume Sunday C1.2.1, C1.2.2, Amadi George C1.2.3, Chibinma Etegba R1.2.1, R1.2.2 Idume Sunday C1.3.1, C1.3.2, Amadi George C1.3.3 Chibinma Etegba R1.3.1, R1.3.2 Idume Sunday R1.3.3
Asset
Reputation
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba Task: Installation of Earth Cables for Earthing of Fence to Earth Station
A B C D E
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday
F G H I J Action Parties
S/N.
1
Task Steps
Excavate Trench
Threats
1.1.1 Throwing Out of Sand / Excavated Material from Trench 1.1.2 Poor Supervision
Inherent Risk
H P4D A4D,
Control Measures
C1.1.1: Conduct Tool Talk C1.1.2: Adhere to Work Method Procedure C1.1.3: Shutting of Excavated Wall C1.1.4: Use Appropriate Warning Signs & Cordon-Off Working
Recovery Measures
R1.1.1: First Aid Treatment R1.1.2: Provide Medivac to Retainership Clinic R1.1.3: Activate Emergency Response
Idume Sunday C1.1.1, C1.1.4 Amadi George C1.1.2, C1.1.3 Chibinma Etegba R1.1.1, R1.1.2 Idume Sunday R1.1.3
Asset
E4D
12
Area.
Body contact
Injury to Personnel
Personnel
L P2C
HS: Cable, Hand Tools 2.1.2:Use of Incompetent Personnel Flying Particles, Bad Weather Condition 3.1.1: Throwing Out of Sand Exposure Injury to to Sand personnel Particles / Shovel Personnel L P2C
C2.1.1 Tool box talk R2.1.1: First Aid Treatment C2.1.2: Use of Correct PPEs R2.1.2: Provide (Leather Hand Medivac to Gloves, Safety Retainership Shoe, etc) Clinic C2.1. Adequate supervision
Idume Sunday C2.1.1, C2.1.2 Amadi George C2.1.3 Chibinma Etegba R2.1.1, R2.1.2
Backfilling
C3.1.1: Conduct Tool Talk C3.1.2: Adhere to Work Method Procedure C3.1.3: Adequate supervision
Idume Sunday C3.1.1, C3.1.2 Amadi George C3.1.3 Chibinma Etegba R3.1.1, R3.1.2
TASK HAZARD ANALYSIS Job/ Activity: Installation of High Security (Citadel) Fencing at Awoba Task: Task: Mobilization to Site A
S/N. Task Steps
Date:14/07/2011 JHA Review Team Composition: Adebiyi Adewole, Ogunkunle Moses, Olowu Chibuzo, Ade Somoye, Agbaru Ikechi, Idume Sunday F G
Inherent Risk
B
Hazards/ Hazards Source
C
Threats
D
Top Event
H
Control Measures
I
Recovery Measures
J
Action Parties
13
Flying Particles
Body Contact
In jury to Personnel
Personnel
L P2C
C1.1.1 Conduct Tool Talk C1.1.2: Use of Correct PPEs (Hand Gloves, Safety Shoe, Nose Mask)
HS:Material
1.1.2: Use of Incompetent Personnel Move Water Transport 2.1..I.Drug/Alcoh Loss of ol Abuse by control Materials, (Boating, Tidal Crew (Drifting / Equipment Wave / Logs in 2.1.2 Medically Sinking & Waterway, of Barge) Unfit Crew Personnel Adverse on Weather 2.1.3 Incompetent Waterways Condition Crew Man from Site Overboar to PH Jetty. 2.1.4 Poor d Weather HS. Boat, Condition (Rain Waterway or Nightfall) 2.1.5 Sailing in Unauthorised Routes 2.1.6 Poor Vessel Condition 2.1.7 Lack of Effective Communication
C1.1.3: Use of Competent and C2.1.1: Alcohol / Drug R2.1.1: First Aid Treatment Policy in place & Communicated R2.1.2: Provide C2.1.2: Ensure Crew is Medically Certified Medivac to Retainership C2.1.3: Provide Clinic appropriate and adequate PPEs (PFD, R2.1.3: Activate Life Vest) Emergency C2.1.4: Reduce Speed Response if Rainy & Observe R2.1.4: Use of "No Night Sailing" Life Buoy, Rule Rescue Stick C2.1.5: Adhere to & Whistle Journey Mgt. Plan C2.1.7: Warning Signs / Notices & Use of Barrier Tapes on Edge of Barges.
R1.1.2: Provide Amadi George Medivac to C1.1.3 Retainership Clinic Chibinma Etegba, R1.1.1, R1.1.2 Amadi George C2.1.1, C2.1.6, C2.1.7 Idume Sunday C2.1.2, C2.1.3, C2.1.4 C2.1.5 Chibinma Etegba, R2.1.1, R2.1.2 Idume Sunday R2.1.3, R2.1.4
14