SNAG LIST OF AURUS

MOTHER’S ROOM
1.T.V UNIT
2.SEWING MACHINE TABLE
3.WALL PANELLING
4.WARDROBE DRAWERS AND PALLA
5.MDF ORDER PENDING
6.BED SIDE TABLE
7.DRESSING TABLE
8.IRON TABLE IN WARDROBE
9.WINDOW MARBLE CLADDING
10.WARDROBE PENDING OF ROOM

MOTHER’S BATHROOM
1.WATERPROOFING
2.DOOR FRAME AND PALLA
3.FALSE CEILLING
4.FLOOR AND WALL TILING
5.SHOWER AREA TRAPDOOR
KID’S ROOM
1.WARDROBE PALLA AND DRAWERS
2.BED AND SIDE TABLE
3.DOOR FRAME AND PALLA
4.A.C TRAPDOOR
5.MDF ORDER PENDING
6.DRESSING PUFFY WITH DRAWERS
7.WINDOW MARBLE CLADDING
8.CEILLING WORK IN PROGRESS

KID’S BATHROOM
1.WATERPROOFING
2.DOOR FRAME AND PALLA
3.FLOOR AND WALL TILING
4.FALSE CEILLING
5.SHOWER AREA TRAPDOOR
GUEST ROOM
1..WARDROBE DRAWERS & DOOR(GLASS)
2.DRESSING TABLE
3.T.V UNIT
4.BED & SIDE TABLE
5.MDF ORDER PENDING

GUEST BATHROOM
1.WATERPROOFING
2.FALSE CEILLING
3.DOOR FRAME & PALLA
4.FLOOR & WALL TILING
5.A.C TRAPDOOR
6.SHOWER AREA TRAPDOOR

MASTER’S BEDROOM
1.DOOR FRAME AND PALLA
2.T.V UNIT MARBLE
3.BED & SIDE TABLE
4.FALSE CEILLING MOLDING PENDING
5.T.V UNIT DRAWERS AND MDF

BOX ROOM
1.FLOOR MARBLE
2.WARDROBE
3.DRESSING TABLE
4.A.C TRAP DOOR
5.FALSE CEILLING

MASTER’S BATHROOM
1.FLOOR & WALL TILING
2.FALSE CEILLING
3.SHOWER AREA TRAP DOOR
4.WATERPROOFING

POWDER WASHROOM
1.DOOR FRAME AND PALLA
2.WATERPROOFING
3.FLOOR AND WALL TILING
4.FALSE CEILLING
KITCHEN
1.FLOOR TILING
2.FIRE LINE
3.FALSE CEILLING
4.A.C
5.ALL WOODEN PART PENDING

DEN AREA
1.WINDOW MARBLE CLIDDING
2.T.V & A.V UNIT
3.BAR UNIT

1.STUDY AREA FABRICATION WORK PENDING


2.15TH MARBLE FLOORINLAY PENDING
3.15TH FLOOR PASSAGE FALSE CEILLING
4.D.B UNIT
5.15TH FLOOR PASSAGE A.C POSITION DISCUSSION
PENDING
4.STAIRS MARBLE PENDING
5.BALCONY WATERPROOFING AND TILING