Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Yazan Mahmoud Al -Tamimi

(Mechanical Engineer), PMP ®


ADM Practicing Engineer ELN No 15468
Musanda Discipline Specialized Engineer (Mechanical)

Curriculum vitae

Mobile (UAE) :+971543343438

Email:YazanTamimi1990@gmail.com
Email:Yaztam@yahoo.com

Date and Place of birth: 18/07/1990 Zarqa - Jordan

Country of residence : UAE -ABUDHABI

Permanent address : Amman – Jordan

Nationality : Jordanian

Marital Status : Married

Career Brief : As Mechanical Engineer, I have a strong knowledge in HVAC system; Chillers,
Air Handling Units and Fan Coil units plus the DX systems talking about their specs , compatibility to the
international standards and applying value engineering to the same , in addition to that I have very well
Background in Plumbing systems including Domestic water supply, Drainage and any related infrastructure
for the same , being in different sites have added to my experience a well Knowledge in executing LPG and
firefighting systems , interference between the Mechanical and Electrical Services have formulated my
MEP Experience to achieve the Project Mep Goals , I am a reliable and devoted team worker, with strong
and sound knowledge in project management "with the ability of handling increasing levels of
responsibility and can manage multiple tasks simultaneously ,I am eager to do practical work, technical
office and management work and I am determined to technically and professionally solve different kinds
of problems and challenges. I have developed my technical and practical professional experience through
working with different Reputed Clients like (Ministry of Presidential Affairs MOPA) , (ABU DHABI General
Services Company Musanda),( ABU DHABI Airport Company ADAC ) ,( ABU DHABI Commercial Engineering
ADCE ), Reputed MN Consultants like ( Jacobs ,Parsons , AIC (Al Torath International Consultant ), ACE
(Alain Consulting Engineers ) .

Skills:

Project Estimation and Cost Control ,Project Management, Project Coordination ,Commissioning,
Team leading , HVAC Design programs (Chvac, Ashrae Duct fitting, duct mate Hap 4.9, Pipe flow
wizard, Elite ) , Shop Drawings Drafting and BIM Programs (AutoCAD MEP , Revit Mep )

Leisure interests: - Reading

Languages: ENGLISH and ARABIC (Spoken and Written


Education:

2012 B.Sc. Mechanical Engineering General Mech. Eng. Al-Blqaa Applied University
GPA : 2.94 out of 4.00 Amman - Jorda
Final Year Project Grade: 4.00

Courses and Seminars:

Date and Issuance


Certificate
Specialization Authority
Technical
2012 (General Literature) JEA ( Jordan)
Writing course
Mastery
OSHA general industry Emergency action planes 2012 (general industry) Technologies
(USA)
Mastery
OSHA general industry , fire prevention
2012 (general industry) Technologies
Plans and fire protection
(USA)
NDT LEVEL- II course 2012( Testing and
IINDE-DMM-KSA
(ULTRASONIC TESTING) commissioning )
NDT LEVEL- II course (LIQUID 2012( Testing and
IINDE-DMM-KSA
PENETRANT TESTING) commissioning )
NDT LEVEL- II course (EDDY 2012( Testing and
IINDE-DMM-KSA
CURRENT TESTING) commissioning )
2013 ( Green
Iso 14001 Environmental
Environmental CIEH-KSA
Management system management)
2015 (Thermal Analysis
Carrier - UTS - AD
(Thermal Modelling) of CARRIER HAP 4.9 and Advanced cooling
- UAE
load Calculation )
Pearl Rating System (PQP Estidama 2015 (Green Building and
UPC-AD-UAE
Training) Sustainability )
Pearl Rating system Auditing and handing over of
2016(Green Building and
( Development of technical service center UPC-AD-UAE
Sustainability )
at mazyad Area part II )
PMI
Project Management Professional PMP 2021

Membership:

2012 Membership of Mech. Eng. Jordan Engineering Association Amman – Jordan

2013 Membership of Mech.Eng. Saudi Engineers Council Dammam– KSA

2014 Young Engineers in Ashrae Committee Ashrae Dubai/UAE

2021 Pmp PMI Id 3002940 PMI USA

2021 Discipline Specialized Engineer (Mechanical) Musanda UAE

2023 Practicing Engineer 15468 ABUDHABI City MUNICIPALITY UAE


Career Summary :

MEP Project Manager : June-2016 – up to now


Lazourdy Contracting and general maintenance
Reporting to the Projects manger Leading 5 engineers and a team of 120 + between Foremen’s, technician and
labors

Responsibilities and duties:

- Facilitating workplace culture to drive team members to excel.


- Estimation works related to the tender stage, cost and giving full quotation to the job.
-Submitting Full Engineering Value Studies Prior to Construction Stage.
- Handling and Heading the Technical meetings with the (clients, Consultants, and the projects management)
related to the Design and Built Stages of the project to produce the final Approved Drawings.
- Preparation of MEP shop drawings, MEP coordination drawings, and design proposals for Mep Discipline.
- Handle all the technical issue related to the Submittal approval and getting.
- Hiring specialized Subcontractors for the certain parts in the contract scope of work.
- Progress monitoring, review and verify subcontractor(s) monthly invoices.
- Procuring and witnessing performance tests for all the long lead highly sophisticated items related to the projects.
- Assure that the project work and quality is up to standard and complying with tender specifications.
- Defining project constraints & key milestones based on the approved master work plan.
- Mange directly and provide technical and engineering support to all the MEP Group at the site.
- Managing changes to the project scope due to site modifications or other factors and updating project time
schedule and project costs (Variations).
- Plans the Execution of all MEP related works and coordinate with Civil Groups
- Giving fully Detailed progress reports to the (clients, Consultants, and the projects management)
- Taking All the necessary Authorities approval (ADDC , ADCD ,ADSSC ,Etisalat )

Mechanical project Engineer June-2015 - May 2016

Lazourdy Contracting and general maintenance


Reporting to the Project manager

Responsibilities and duties:

- Handle all the technical issue related to the Submittal approval


- Designing HVAC system, equipment sizing including chilled water pump, AHU’s, Chillers and network, air handling
units fan coil units and duct sizing.
- Water supply system, including pipe network design and sizing for all the project, designing the plant room
including the water supply pumps and equipment and specifying the pump type depending on the application,
calculating and estimating flow, head and pressure drop required according to the parameters available.
- Fire System, estimating the pipe network design and fire pumps depending on the building type and activity
according to NFPA standards.
- Producing shop drawings and as built for the project.
- Responsible for the day-to-day work execution progress in coordination with the site engineers, supervisors and
foremen to achieve the planned clearance dates, initial and final fixes.
- Preparing RFI “Request for Inspection” for completed works for all mechanical activities
- Project QA/QC activities like (Installation & material inspection requests, Mockup installations, MEP clearances,
Snagging list and rectification and Method statements)
- Assure that the project work and quality is up to standard and complying with tender specifications.
- Supervise the project on site and handle material submittals, and check workmanship quality, based on Daily
bases.
- Taking All the necessary Authorities approval

Mechanical project Engineer. May-2014- June 2015


Safeway Electro mechanics Est
Reporting to Senior Engineer

Responsibilities and duties:

- Estimation works related to the tender stage and giving full quotation to the job
- Estimate project cost and build BOQ’s.
- Handle all the technical issue related to the Submittal approval.
- Doing all the Designing job related to the shop drawing “chilled water pump head calculations, FCU static
- Pressure calculations, FAHU Static pressure calculations, duct sizing, grills and diffusers sizing,”
- Producing shop drawings and as built for the project.
- Assure that the project work and quality is up to standard and complying with tender specifications
- Supervise the project on site and handle material submittals, and check workmanship quality, based on Daily
bases.

Mechanical Site and cost control Engineer August 2012 – May 2014
Abdullah A.M Al Khodari (Alkhobar-KSA)
Reporting to Senior HVAC Engineer

Projects:

1- Staff Accommodation -Alwathba


A 67 million AED Project with Ministry of Presidential Affairs (MOPA ) As Client And ALAin
Consulting Engineers (ACE ) AS Consultant in which 12 Different staff Accommodation Buildings with
2 large Kitchen and Laundry
2- SHEIKH SULTAN MOSQUEAT SWEIHAN

A 26 Million Project with Ministry of Presidential Affairs ( MOPA ) As Client and Pioneer
Engineering Consultancy AS Consultant

3- Kids Palalce Nursery At Emirates Place Hotel :

A 25 Million Project with Ministry of Presidential Affairs ( MOPA ) As Developer and Mandarin
Oriental The hotel Group As Client , KEO as a consultant

4-Refurbishment of North and south Fire Station at ARFF in ALAIN international Air port
A total of 15 million AED of Design and Built project with AbuDhabi Airport Company (ADAC) As
client and JACOBS As CMA ( Consultant ) in which a complete refurbishment for 2 occupied fire stations
to be made a 4 chillers system complete with pump and plant room arrangement were made , new
domestic water firefighting and Fire alarm system were fixed

5- Complete Fit out works of Terminal 3 Business park complex


4.4 million AED fit out works with Abudahbi Airport company (ADAC) as client and Kling Consults as
Consultant in which Full Chilled water networks installed full Firefighting network (sprinklers and
FM 200 system ) , BMS, light control system Executed in 2 months Duration .
6- Refurbishment Work for Family Development Foundation
A Project with Family Development Foundation as Client and Abudhabi General Service Company
(Musanda) As Project Management in which the a fully ducting network with BMS and VAV controlling
system for 5 story building and a 12 AHU , a c complete Firefighting network with new Pumps and
External water tanks .

7- Development of Technical service Center At Mazyad Area :

A 13 million project with Emirates Transport as Client and AlTorath international Consulting (AIC) in
which package, ducted split and VRF units are used , complete Fire fighting and fire alarm system along
with Domestic water supply system , the project is considered as green friendly Environment Building
with pearl 1 rating system ,

8- Al-Bloshi Residential Building (7 typical floors ,2 basments,Mezzanine and ground floor)-(AlTorath


Consulting Engineers ) – Al Hashim General contracting and maintenance under ADCE supervision
(Complete AC Works )

9- mohamed al amere Residential Building (7 typical floors ,2 basments,Mezzanine and ground floor)
(planners Engineering consultancy and decoration ) – AlShwehat Genral contracting and
maintenance under ADCE supervision

10- Sultan Bakheet Alsuwidi Commercial Tower ( 16 typical Floor ,4 basements , Mezzanine and ground
floor) (AlTorath Consulting Engineers) – Almezin General Contracting under ADCE supervision
(Complete AC Works )
11- Ahmad Juma AL-Hussaini –Private villa –(Eng.Adnan Al-Safarini office ) (Complete AC Works )
12- Amal Al-Jabri –Private villa –( Eng.Adnan Al-Safarini office ) - (Complete AC Works )
11- Hmeed AL-Saadi –Private villa- (Burj Al-Arab Engineering Consultancy)- (Complete AC Works )
12- Ozeer Almhairi-Private villa-( AlTorath Consulting Engineers ) - (Complete AC Works )

References:

To be provided upon Request

You might also like