THE PROCURER THE INDEPENDENT CERTIFIRER THE CONTRACTOR THE BUILDING CONTRACTOR

(TBA)

PROJECT QUALITY PLAN: TBC Wave 1 PPP Schools Project


INSPECTION AND TEST PLAN APPENDIX C
SPECIFICATION SECTION 25 90 00, 26 05 53, 26 05 26, 26 05 33 PART 2- ITP DETAILS: Inspection and Test Plan for BMS

Survey, Test or Action Pay Item


Ref. Standard /Specification/Method Frequency of Verification Verification
Item No. Activity Description Method of Acceptance Criteria
Statement and/or Drawing No. Inspection Personnel Document
Inspection SC BC QC ITL Code

1.0 - SUBMITTAL REVIEW


Intial Submission
Submittal Approval of Project Specifications, IFC/RIBA-04 , Proj. Specification, Sections: 25 90 00 , CM, QCM and Approved SD
1.1 Shop Drawing prior to start H H H
Shop drawing and Standards IFC/RIBA-04 , and Standards HSE Submittal
work

Intial Submission
Project Specifications and Proj. Specification Sections: 259000 , PM, QCM and Approved MES
1.2 Method Statements Submittal of MES prior to start H H H
Standards,Approved Shop drawings IFC/RIBA-04 , and Standards Technical Submittal
work

Project Contract - Procurer Requirements Intial Submission


Contract Documents and Project PM, CM and
1.3 Material Approvals Submittal of MAR Teble 1.6 & Project Specifcations prior to start H H H Approved MAR
Specifications QCM
Sections: 25 90 00 work

Initial Submission
Contract Documents and Project Project Contract, PQP and QA System PM, CM and Approved Pre-
1.3 Subcontractors of BMS Submittals of PQD prior to start H H H
Specifications (Acceptance Criteria) QCM Qualifications
work
2.0 - MATERIAL & DELIVERY INSPECTION

1. As per
Check all materials or devices
Approved MES, Approved MAR, Proj. manufacturer's
Delivery /Recieving,Storage and used for installation are PM, CM and
2.01 Visual Inspection Specification, Section 25 90 00 and Each delivery H H S written
Handling new,undamaged and have QC
Approved Drawings instructions. 2.0
approved MAR
MES

MAR,Delivery
All materials shall be as per Approved MES, Approved MAR, Proj. notes and
MIR & Visual PM, CM and
2.02 Materials for BMS System project specifications /standards Specification, Section 25 90 00 and Each delivery H H H relevant
Inspection QC
and Shall have Approved MAR. Approved Drawings certificate &
Approved MAR

3.0 - EXECUTION

Approved MES, Proj. Specification,


Check BMS Field Devices Project Specifications and Every section of
Section 25 90 00 PM, CM and
3.1 (Installation/fixation/Alignment, Visual Inspection approved Shop Drawings and completed H H W Checklist
and Approved Drawings and QC
Level) manufacturers recommendation works
manufacturers recommendation
THE PROCURER THE INDEPENDENT CERTIFIRER THE CONTRACTOR THE BUILDING CONTRACTOR

(TBA)

PROJECT QUALITY PLAN: TBC Wave 1 PPP Schools Project


INSPECTION AND TEST PLAN APPENDIX C
SPECIFICATION SECTION 25 90 00, 26 05 53, 26 05 26, 26 05 33 PART 2- ITP DETAILS: Inspection and Test Plan for BMS
Approved MES, Approved MAR, Proj.
Project Specifications and Every section of
Check BMS Cable connection with Specification, Section 25 90 00 and PM, CM and
3.2 Visual Inspection approved Shop Drawings and completed H H W Checklist
Accessories Approved Drawings and QC
manufacturers recommendation works
manufacturers recommendation

Every section of
Project Specifications and Project Specifications 25 90 00 and PM, CM and
3.3 Identification marking / Labelling Visual Inspection completed H H W Checklist
approved Shop Drawings approved Shop Drawings QC
works

wires/cables pulling &


Approved MES, Approved MAR, Proj.
identification before starting the
Visual Inspection & Specification, Section 25 Every section of
Cable pulling and Continuity test for testing,Project Specifications PM, CM and
3.4 cable pulling WIR 90 00 completed H H H Approved WIR
Control Cable and approved Shop Drawings QC
and Testing WIR and I/O List ,Approved Drawings and works
and manufacturers
manufacturers recommendation
recommendation
wires/cables testing &
identification before starting the Approved MES, Approved MAR, Proj.
termination,Project Specification, Section 25 Every section of
Installation of BMS Field devices and Visual Inspection & PM, CM and
3.4 Specifications,Bms wiring 90 00,Bms wiring diagram completed H H H Approved WIR
their cable termination WIR QC
diagram and approved Shop and I/O List,Approved Drawings and works
Drawings and manufacturers manufacturers recommendation
recommendation
wires/cables testing & Approved MES, Approved MAR, Proj.
identification before starting the Specification, Section 25
termination,Project 90 00 Every section of
Installation of DDC Panels & Cable Visual Inspection & PM, CM and
3.5 Specifications,Bms wiring and Approved Drawings,Bms wiring completed H H H Approved WIR
termination DDC Panels side WIR QC
diagram and approved Shop diagram ,I/O List including works
Drawings and manufacturers Wiring/termination details and
recommendation manufacturers recommendation
LEGEND H-HOLD POINT (Signature Required ot Proceed S- Surveillance (Random attendance, NO Signature) SC- Subcontractor BC-Building Contractor

W - Witness (Attendance Expected, Signature on check sheet) R - Record Review QC-Quality Control ITL: Indpendent Testing Lab

Document Prepared by : Sherif Ragab REVISION No. 0


Document No. TBC-WOP-EPC-GEN-ITP-ELE-00022
Reviewed By Project Director Date: 29-Sep-22