22 - ITP For BMS
22 - ITP For BMS
(TBA)
Intial Submission
Project Specifications and Proj. Specification Sections: 259000 , PM, QCM and Approved MES
1.2 Method Statements Submittal of MES prior to start H H H
Standards,Approved Shop drawings IFC/RIBA-04 , and Standards Technical Submittal
work
Initial Submission
Contract Documents and Project Project Contract, PQP and QA System PM, CM and Approved Pre-
1.3 Subcontractors of BMS Submittals of PQD prior to start H H H
Specifications (Acceptance Criteria) QCM Qualifications
work
2.0 - MATERIAL & DELIVERY INSPECTION
1. As per
Check all materials or devices
Approved MES, Approved MAR, Proj. manufacturer's
Delivery /Recieving,Storage and used for installation are PM, CM and
2.01 Visual Inspection Specification, Section 25 90 00 and Each delivery H H S written
Handling new,undamaged and have QC
Approved Drawings instructions. 2.0
approved MAR
MES
MAR,Delivery
All materials shall be as per Approved MES, Approved MAR, Proj. notes and
MIR & Visual PM, CM and
2.02 Materials for BMS System project specifications /standards Specification, Section 25 90 00 and Each delivery H H H relevant
Inspection QC
and Shall have Approved MAR. Approved Drawings certificate &
Approved MAR
3.0 - EXECUTION
(TBA)
Every section of
Project Specifications and Project Specifications 25 90 00 and PM, CM and
3.3 Identification marking / Labelling Visual Inspection completed H H W Checklist
approved Shop Drawings approved Shop Drawings QC
works