ESTIMATE THE DAILY TOLL REVENUE OF BANDRA WORLI SEA LINK
Assumptions:
Operational time: 24*7
Category of vehicles -, 4 wheelers, heavy vehicles (Truck/buses etc) Monthly passes included and each pass could approx. cost 2000 Assume there are 5 toll gates teach side hence total no of gates = 10 No autos and two wheelers pass by through sea link
Number of vehicles:
Traffic Timing Hours Rate at which a vehicle Total no of vehicles
passes through 1 gate passing by the given time 1 gate 10 gates High 8am -11am 6 1 every 20 sec 1080 10800 6pm – 9pm Medium 10 1 every 30 sec 1200 12000 Low 12am – 8am 8 1 every 60 sec 4800 48000
Total vehicles = 27600
Splitting of vehicles per category
Type of vehicle % of total Number per category NO of vehicles taking