Power Crete ARO - Procedure
Power Crete ARO - Procedure
Power Crete ARO - Procedure
(foto) (foto)
The temperature of the surface shall be minimum 3°C above dew point
during application. Check the dew point on a regular base. Use a
calibrated and approved dew point meter.
≥50mm
≥50mm
≥50mm
±70mm
≥50%
≥60mm
≥50mm
≥50%
UV-LIGHT
Fold the POWERCRETE ARO-UV tight over the top side of the pipe
and apply another layer of POWERCRETE ARO-UV with the same
procedure.
Apply Tension Tape criss-cross over the top side of the pipe until all the
POWERCRETE ARO-UV has been covered and continue by means of
spiral wrap on the straight pipe section.
2 layers 1 layer
Bore-head
Note: Simplified representation of the application, Please check PDS, SDS, Scope of work for detailed product- and application descriptions.