Professional Documents
Culture Documents
ROTOTEST Brochure
ROTOTEST Brochure
ROTOTEST Energy
Minimum Preparation Time and Reliable Repeatability
New Paradigm for “Road Load Simulation Testing” is here
MINIMUM INFRASTRUCTURE REQUIREMENTS
Compared with conventional roller-type chassis dynamometer
(CDM) (see figure 1), the ROTOTEST Energy system does not require
a large facility such as an underground pit. With a level floor plan
(e.g. garage) (see figure 2) and power (@400V, 3 phase) being the
main requirements, a full battery of tests can be carried out. The
dramatically lowers cost and provides flexibility.
COST-EFFECTIVE
C
Figure
Fi
Figu
F
Fig
ig re 2
iigu 2:: RO
ROTOTEST
OTOTE
OT
O
OTE
TESST
T
EASY TO SETUP
E
ROTOTEST
R
ROTOTE
TOTE
TE
ESST Energy
ST Ene
nerg
nerg
gy Competitors
Co m
Co mppe
ettittorrs
Se
S
Set
et u
upp tim
time
i e 10
1
10-15
0-1
-15
15 mi
m
minutes
inu
inu
ute
es 3-6
3-
-6 hour
ho
hours
ouurrs
rs
Time
T me
Ti remove
e to re
emo
m ve 10-15
1
10
0-1 minutes
15 mi
m inu
nute
tes
s 30-60
30
0-6 minutes
60 mi
m inu
inu
nutes
te
es Te
Test
estt
Set-up
Set-
Set
Se
ett-
e t up Remove
p/R
Rem
em
e ov
ove
ove
ve
Number
Numb
m err of
of operator(s)
operrat
op ator
tor
or(s)
or((s)
(s 1-2
12
1- 2-4
2-4
2-
Operation
Oper
Op
per
e at
atio
ion ra
ion
io rate
ate per
te p day
err d
e ay
y
ab
bou
out 86%
out
about 86%
86 ab
bou
o t 29%
about 29
299%
% ROTOTEST
ROT TESTT Competitor
ROTO
ROT
RO
OTO
OT Compe
pe
eti
titor
titor 7 hours
hour
ho day
ourrss / d
daay
(assume
(ass
(ass
sum
ume 2h/test,
me 2h
h/t
/tes
te
es
st,
t 77h/days)
h/da
h/ days
days
s)
Please refer to the URL below to view a video on how to set up the ROTOTEST dynamometer.
https://www.toyo.co.jp/mecha/products/detail/ROTOTEST_Energy.html#link99
2
ROTOTEST Hub-Coupled Chassis Dynamometer
Measurement System Real-time Distribution Controller
MODULE FOR VARIOUS TEST REQUIREMENTS
By utilizing a state of the art 4Q control system and
n – speed n – speed
the ROTOTEST Active Inertia technology, the vehicle’s
M - torque M - torque
inertia can be stimulated electronically to replicate true
road conditions. In addition to being able to simulate
different types of driving patterns, each tire can be
modeled using a “magic formula” (see figure 4).
Tire Model Vehicle Data
Constant torque, constant speed
n – speed Sweep
M - torque Road load simulation
Individual torque control, etc.
Figure 4
Fi 4: R
Real-time
l ti T
Torque Di
Distribution
t ib ti
STEERING OPERATION
CRITICAL
C MEASUREMENTS
Figure 5: Steering Controls
Powertrain Direct
Dynamometer
Chassis Coupling
Power consumption
measurement of headlight
(@ 30km/h, low / high beam)
Figure
Figu
gure
gu re 6 Figures 7 & 8
3
ROTOTEST Standard
Model
Figure 10: Torque Distribution in Snow Covered Road Scenario Figure 11: Torque Distribution during Steering
4
ROTOTEST Climate
Model ROTOTEST Hub-Coupled Chassis Dynamometer
5
ROTOTEST NVH
Model
LOW NOISE MODEL FOR NOISE, VIBRATION, AND HARSHNESS (NVH) TEST
Even very low noise levels can negatively impact NVH measurements. Compared with traditional roller type dynamometers,
there is next to no tire noise generated by the ROTOTEST units.
ROTOTEST Energy NVH can be customized by removing blowers for cooling and covered with sound insulation boxes. The
model can also be installed in semi-anechoic chambers.
6
ROTOTEST Hub-Coupled Chassis Dynamometer
SPECIFICATIONS
Each system consists of dynamometers (2WD or 4WD), SCU, and MPU. The SCU is a system control unit, while MPU is the
main power unit of each dynamometer.
GENERAL SPECIFICATIONS
Torque uncertainty < 1% of measured value
Speed uncertainty 0.1 rpm
Repeatability < 0.05%
Inertia 0.6 kg m2 (300 kW unit)
Maximum axle load 3,500 kg
Temperature range +59° to +104° F; +15 to +40 C (except climate
model)
Humidity 10-90%, non-condensing
Altitude < 1,000 m above sea level
Power (SCU) 240 VAC (8A) or 120 VAC (16A) @ single phase
Power (MPU) 400 VAC, 50 / 60 Hz @ 3 phase
Cooling method Air Cooling
STANDARD MODEL
System ROTOTEST Energy 500-250 4WD
Component 1 axle of RE-500 (Dyno), 1 axle of RE-250 (Dyno),
MPU-500×2, MPU-250×2, SCU-4E×1
Power† 2WD 500 kW/400 kW (momentary/continuous)
Power† 4WD (50/50 split) 500 kW/400 kW (momentary/continuous)
Torque 2WD 6,000 Nm/2,550 Nm (momentary/continuous)
Torque 4WD (50/50 split) 5,960 Nm/2,450 Nm (momentary/continuous)
Spee
p
Speed 2WD/4WD 2,700 rpm (maximum hub speed)
Vehicle Speed 2WD/4WD
Vehi 330 km/h (equivalent, wheel dia 650 mm)
CLIM
CLIMATE MODEL
Syst
y
System ROTOTEST Energy 230-CP 4WD
Component
Com 2 axles of RE-230-CP (Dyno), MPU-230CP x 4,
SCU-4E x 1
Pow † 2WD
Power 230 kW/120 kW (momentary/continuous)
Power† 4WD (50/50 split)
Pow 460 kW/240 kW (momentary/continuous)
Torq
q
Torque 2WD 2,800Nm/1,200 Nm (momentary/continuous)
Torq
q
Torque 4WD (50/50 split) 5,600 Nm/2,400 Nm (momentary/continuous)
Spee
p
Speed 2WD/4WD 2,500 rpm (maximum hub speed)
Vehicle
V
Veh i Speed 2WD/4WD 300 km/h (equivalent, wheel dia 650 mm)
Environment
Envi -31° to 105° F (-35° to 40° C) | 10-95% (humidity), (non-condensing)
IP54
NVH MODEL
Syst
y
System ROTOTEST Energy 300-NVH 4WD
Component
Com 2 axles of RE-300-NVH (Dyno), MPU-300 x 4,
SCU-4E x 1
Pow † 2WD
Power 300 kW (5 min‡)
Pow † ‡
Power 4WD (50/50 split) 600 kW (5 min )
Torq
Torque 2WD 2,980 Nm
Torque 4WD (50/50 split) 5,960 Nm
Speed 2WD/4WD 3,000 rpm (maximum hub speed)
Vehicle Speed 2WD/4WD 360 km/h (equivalent, wheel dia 650 mm)
Noise less than 45 dBA
† at 68° F (20° C)
‡ defined as a 5 minute run / 30 minute cool down
7
ABOUT ROTOTEST INTERNATIONAL AB
Founded in January 1988, Rototest was established by a group of engineers with solid experience
in product development in the vehicle industry. After a few years, devoted to intense development
and testing, Rototest pioneered the market by introducing the world’s first hub-coupled
dynamometer. The company is based in Sweden.
Rototest test solutions is today used by many of the world’s renowned industrial companies in
more than 25 countries across North America, Europe, Asia and Africa.
06/26/2018 (SCW)