PT.

PUTRA MERADA BERSINAR


MINE CONTRACTOR & CIVIL CONSTRUCTION
JL. Lintas Lakey, Desa Merada, Kec. Hu’u, Kab. Dompu – NTB
Email : ptputrameradabersinarpmb@gmail.com
Contact : +62 82147004748

MIX DESIGN CONCRETE K-250

PROJECT : WATER TANK FOUNDATION


LOCATION : SITE DANAKAKILA PT. STM

QUALITY : K-250 (21.7 MPa)


SLUMP : (12+2) cm
WC RATIO : 0.8

COMPOTITION
FOR 1 M3 MIX DESIGN
• Semen = 384 Kg
• Pasir = 692 Kg
• Kerikil = 1039 Kg
• Air = 215 Liter

PACKING
UP 50 KG SEMEN
• Semen = 50 Kg
• Pasir = 90.104 Kg = 3.6 Ember
• Kerikil = 136.71 Kg = 4 Ember
• Air = 28 Kg = 1 Ember + 7 Liter
Total = 304.8 Kg

Note :
1. 1 Ember 20 Kg Berat Kerikil = 35 Kg
2. 1 Ember 20 Kg Berat Pasir = 25 Kg
3. 1 Ember 20 Kg Berat Air = 21 Kg
4. Bobot Isi Pasir = 1.400 Kg/m3
5. Bobot Isi Kerikil = 1.350 Kg/m3
6. Bukling Faktor Pasir = 20%