Sketch+Boq Sul Gro 0020 I B Tolinggula Tengah Isat Raft 3a 70m FD
Sketch+Boq Sul Gro 0020 I B Tolinggula Tengah Isat Raft 3a 70m FD
6.000 3.000 2 9
2 9
DEPAN
BELAKANG
6.000 3.000
3.000 3.000
0.00 0.00
6.000 6.000
K
K 0.00 0.00 0.00
A
I
N
R
A
I
N
6.000 3.000
DEPAN
g) Tinggi Stone Masonry yg dipasang
BELAKANG
6.000 3.000 Panjang Grid
S S
6.000 3.000 Panjang Stone Masonry
0.00 0.00
0.00 0.00
6.000 3.000
S S
6.000 3.000
DEPAN
LS
LDB
LS 12 m Lebar Sewa (Kiri+Kanan)/2 R
PDB 9m Panjang yg Dipagar BRC (Depan) I PDB
LDB 9m Lebar yg Dipagar BRC (Samping) DEPAN
LG 1.2 m Lebar Gate
TPF = 2*(LDB+PDB)-LG
TPF = 34.8 m Total Panjang Fence
TPBWF = 0m Total Panjang Barbed Wire Fence
JTBWF = 4 pcs Jumlah Tiang Barbed Wire Fence
5 Access Road
a Concrete K-175 (t=150mm)
LCAR 0m Lebar Concrete Access Road
PCAR 0m Panjang Concrete Access Road
LuCAR 0 m2 Luas Concrete Access Road
b Gravel (t=50mm)
LGAR 0m Lebar Gravel Access Road
PGAR 0m Panjang Gravel Access Road
LuGAR 0 m2 Luas Gravel Access Road
0 0 0 0 0 0 0 0
6 Tower Foundation
Standard Works
a Excavation (VE) 93.636 m3 =VOL. GALIAN PAD + VOL. GALIAN TIE BEAM JIKA ADA
b Sand Layer (VSL) 5.101 m3 =(L PAD+0.1)*(P PAD+0.1)*TSL*JLH PAD+(L TIE BEAM+0.1)*P TIE BEAM*TSL*JLH TIE BEAM
c Back Fill (VBF) 23.098 m3 =VE-VSL-VLC-(VC-VCDOGL)
d Lean Concrete (VLC) 5.101 m3 =VSL
e Berat baja tulangan 4281.430 kg = BASED ON TOWER FOUNDATION DESIGN
f Concrete K-225 (VC) 62.278 m3 = BASED ON TOWER FOUNDATION DESIGN
8 Shelter Type II 0
a Soil Excavation 0.000 m3
b Sand Layer 50mm 0.000 m3
c Lean Concrete 50mm 0.000 m3
d River Stone Masonry 0.000 m3
e Concrete K-225
- Berat baja tulangan 0.000 kg
- Concrete K-225 0.000 m3
f Wooden Pile 8~10cm 0.000 m
Non Standard
i. Soil Import 0.000 m3 0
k. Stone Masonry 0.000 m3
SST-3A-70M-FD = 16,231.390 kg