<8
22
11 19 CUT LENGTH

3 CUT PIECE N0 LENGTH SIZE

1 692 6"
23 SPL-06
2 144 10"
2
<9>
>
<7 REV:1
3 100 1"
24
SPL-01 4 968 10"
<1>

FL802 5 100 1/2"


FL801
1 FL804 6 100 1/2"

17 7 2255 10"

8 690 10"
18 SPL-04 9 100 1"

10 1432 10"

11 984 10"

LEGEND
SHOP WELD

FIELD WELD
SPOOL GEN REVISION

SPOOL NO CUT PIECE NO -3 SIZE & DWG NAME


1
TJ THREADED JOINT CORRECTIONED 05.09.23 SIVA KARIKALAN.K KARIKALAN.K
GANESH
<#> PIECE NO

FL FLANGE JOINT

SCREWED INSULATED TRACED


1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN
MILIMETER.
8. FOR PAINTING AND COATING, REFER TO
AQUA-000-EXE-TOYO-58-PIP-SPC-0004.
JOINT PIPE PIPE
2. ROOT GAPS FOR BUTT WELDING FITTINGS ARE NOT 9. FOR INSULATION, REFER TO
INCLUDED IN DIMENSION. AQUA-000-EXE-TOYO-58-PIP-SPC-0003.
3. DIMENSION MAY BE SLIGHTLY DIFFERENT FROM ACTUAL 10. CONSTRUCTION TO VERIFY DIMENSIONS AT SITE
DIMENSIONS BY 1 MM OR 2 MM DUE TO COMPUTER PRIOR TO FABRICATION AND INSTALLATION.
ROUND-OFF CALCULATION. 11. HIDDEN LINE REPRESENTS EXISTING OR RE-USED. BUTT SOCKET
4. PLANT BASE ELEVATION WELD WELD PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION
ELEVATIONS ARE REFERRED FROM HIGH POINT OF AND COMMISSIONING (EPCC) FOR WASTE WATER TREATMENT PLANT (WWTP)
PAVING (HPP) WHICH IS TAKEN AS EL. 0MM. IMPROVEMENT AT PETRONAS CHEMICALS FERTILISER KEDAH SDN BHD (AQUA)
5. FOR PIPE SUPPORT STANDARD, REFER TO
AQUA-000-EXE-TOYO-58-PIP-SPC-0002.
6. ALL PIPE SUPPORT MUST BE VERIFY AND SUIT
AT SITE PRIOR FOR FABRICATION AND INSTALLATION. REV:1
7. FOR INSTRUMENT DETAILS, REFER TO INSTRUMENT
HOOK-UP DRAWING.