Isbl2 10 WW 58323 11201 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FW

FL814

60

<7>
SPL-17

59
>
<8
58 62

SPL-16
>
<6

61
55
57

56
<5>
54

53
50
49
SPL-14
FL811

48 FL810
<4> <3>
CUT LENGTH
52 47 SPL-12
43 CUT PIECE N0 LENGTH SIZE

1 796 10"

2 100 1"
SPL-15 42
3 538 10"
<1>
4 2206 10"

5 1800 10"
44 6 2388 10"

51 45 7 6000 10"

8 100 1"
FL813
<2>

FL812

46 SPL-13
LEGEND
FL809
SHOP WELD

FIELD WELD

SPOOL NO

TJ THREADED JOINT

<#> PIECE NO

FL FLANGE JOINT

SCREWED INSULATED TRACED


1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN 8. FOR PAINTING AND COATING, REFER TO JOINT PIPE PIPE
MILIMETER. AQUA-000-EXE-TOYO-58-PIP-SPC-0004.
2. ROOT GAPS FOR BUTT WELDING FITTINGS ARE NOT 9. FOR INSULATION, REFER TO
INCLUDED IN DIMENSION. AQUA-000-EXE-TOYO-58-PIP-SPC-0003.
3. DIMENSION MAY BE SLIGHTLY DIFFERENT FROM ACTUAL 10. CONSTRUCTION TO VERIFY DIMENSIONS AT SITE
DIMENSIONS BY 1 MM OR 2 MM DUE TO COMPUTER PRIOR TO FABRICATION AND INSTALLATION.
ROUND-OFF CALCULATION. 11. HIDDEN LINE REPRESENTS EXISTING OR RE-USED. BUTT SOCKET
4. PLANT BASE ELEVATION WELD WELD PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION
ELEVATIONS ARE REFERRED FROM HIGH POINT OF AND COMMISSIONING (EPCC) FOR WASTE WATER TREATMENT PLANT (WWTP)
PAVING (HPP) WHICH IS TAKEN AS EL. 0MM. IMPROVEMENT AT PETRONAS CHEMICALS FERTILISER KEDAH SDN BHD (AQUA)
5. FOR PIPE SUPPORT STANDARD, REFER TO
AQUA-000-EXE-TOYO-58-PIP-SPC-0002.
6. ALL PIPE SUPPORT MUST BE VERIFY AND SUIT
AT SITE PRIOR FOR FABRICATION AND INSTALLATION.
7. FOR INSTRUMENT DETAILS, REFER TO INSTRUMENT
HOOK-UP DRAWING.