New Constructed Railway Jakarta to Bandung High-Speed Railway Project

Cable Concealed Engineering Inspection Certificate


DL-铁程检-18
China Railway Group Limited
Halim to Karawang Interval Jakarta-Bandung High Speed
Unit works Contractor
Electric Power Project Railway Project
Department(CREC)
Halim Communication & signal
Construction Inspection
substation-DK0+950(AT
Place Date
post1)

Cable model:Cu/XLPE/CTS/PVC/DATA/PVC-18/30(36)kV-1×35mm²

Cable use: Primary load through power line from Halim Communication & signal substation to

DK0+950 ( AT post1 ) total length 1530 meters;The inspection results are as

follows:
1. Buried depth laying in the cable trench meets the requirements, and the buried depth of the

cable trench outside the red line is 0.8 meters


2. Soil condition soft soil
3. Protection Laying along the cable trough, wearing SC100 galvanized steel pipe for protection,The

channel is protected by wearing SC100 galvanized steel pipe


4. Protection method under the track steel pipe protection
5. Treatment of joints and bends meet design specifications
6. Start spare amount /
7. End spare amount /
According to the above inspection Meet the requirements of design and inspection standard

TB10757-2018

Decision:

construction
manager
inspection
engineer
New Constructed Railway Jakarta to Bandung High-Speed Railway Project
电缆隐蔽工程检查证
DL-铁程检-18
China Railway Group Limited
Halim to Karawang Interval Jakarta-Bandung High Speed
Unit works Contractor
Electric Power Project Railway Project
Department(CREC)
Halim Communication & signal
工程地点 substation-DK0+950(AT 检查日期
post1)

电缆型号:Cu/XLPE/CTS/PVC/DATA/PVC-18/30(36)kV-1×35mm²

电缆用途: 综合 负荷贯通电力线路 自 Halim Communication & signal substation 至

DK0+950(AT post1) 共长 1540 米;检查结果如下:


1. 埋设深度 电缆槽中敷设满足要求,红线外电缆槽埋深 0.8 米
2. 土质情况 软土
3. 防护情况 沿电缆槽敷设,过路穿 SC100 镀锌钢管防护,过水渠穿 SC100 镀锌钢管防护
4. 穿过轨道下防护方法 钢管防护
5. 接头及弯曲处的处理 满足设计规范
6. 始端备用量 /
7. 终端备用量 /
根据以上检查认为 符合设计及验标 TB10757-2018 的要求

决定:

施工负责人

检查工程师