2 雅万铁程检-18
2 雅万铁程检-18
2 雅万铁程检-18
Cable model:Cu/XLPE/CTS/PVC/DATA/PVC-18/30(36)kV-1×35mm²
Cable use: Primary load through power line from Halim Communication & signal substation to
follows:
1. Buried depth laying in the cable trench meets the requirements, and the buried depth of the
TB10757-2018
Decision:
construction
manager
inspection
engineer
New Constructed Railway Jakarta to Bandung High-Speed Railway Project
电缆隐蔽工程检查证
DL-铁程检-18
China Railway Group Limited
Halim to Karawang Interval Jakarta-Bandung High Speed
Unit works Contractor
Electric Power Project Railway Project
Department(CREC)
Halim Communication & signal
工程地点 substation-DK0+950(AT 检查日期
post1)
电缆型号:Cu/XLPE/CTS/PVC/DATA/PVC-18/30(36)kV-1×35mm²
决定:
施工负责人
检查工程师