Mid-Hongu Khola B Hydropower Project

Sub Project: Design, Supply, Installation, Testing and Commissioning of 132 kV Transmission line.

Rate for Tower foundations works


S.N Rate from Subcontractor Unit Unit Rate Remarks
1 Excavation for Normal Dry Soil (NDS) Cum
2 Excavation for Dry Fissures Rocks(DFR) Cum
3 Excavation for Hard Rock (HR) Cum
4 Backfilling of excavated soil Cum
5 PCC in foundations (1:3:6) Cum
6 RCC Concrete M20 Cum
7 Formworks Sqm
8 Reinforcement all complete Kgs.
Transportation of Concrete Materials manually from
nearby road to tower locations all complete , Cum Cum/KM
9 per Kilimeters
Transportation of reinforcement bars from nearby
10 road to tower locations Kgs.
Transportation of Stubs (tower legs) from store to
11 tower locations (each leg 80 Kgs. Approx) Nos.
Rock anchoring for HR for 25mm dia bars (each bars
12 1.5 meters depth) R-m