Professional Documents
Culture Documents
Time Scedule
Time Scedule
( TIME SCHEDULE)
KEGIATAN : PENANGANAN JALAN KABUPATEN/KOTA
SUB KEGIATAN : REKONSTRUKSI JALAN
PEKERJAAN : PENANGANAN LONG SEGMENT REKONTRUKSI/PENINGKATAN KAPASITAS STRUKTUR JALAN ANJANI - SURALAGA
NOMOR KONTRAK : 908/68/KPA/PU-BM/DAK-Anjani/2024
TANGGAL KONTRAK : 24 JANUARI 2024
NOMOR SPMK : 908/100/KPA/PU-BM/DAK-Anjani/2024
TANGGAL SPMK : 31 JANUARI 2024
NOMOR ADDENDUM 01 :
TANGGAL ADDENDUM 01 :
WAKTU PELAKSANAAN : 210 HARI KALENDER
KONTRAKTOR : PT.ANINDITA KONTRUKSI JAYA
NILAI KONTRAK : Rp. 4.562.374.000,00
NILAI ADDENDUM 01 : Rp. 4.882.322.000,00
3b APD
SKh-1.1.22.(3b1) Topi pelindung (Safety helmet) Buah 50,000.00 10.00 500,000.00 0.011 0.001 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014
SKh-1.1.22.(3b2) Pelindung mata (Goggles, Spectacles) Buah 120,000.00 2.00 240,000.00 0.005 0.001 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
SKh-1.1.22.(3b7) Sarung tangan (Safety gloves) Pasang 35,000.00 2.00 70,000.00 0.002 0.000 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
SKh-1.1.22.(3b8) Sepatu keselamatan (Safety shoes, rubber safety shoes and toe cap) Pasang 210,000.00 6.00 1,260,000.00 0.029 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
SKh-1.1.22.(3b11) Rompi keselamatan (Safety vest) Buah 45,000.00 10.00 450,000.00 0.010 0.001 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
7 Rambu dan Perlengkapan Lalu Lintas yang diperlukan atau manajemen lalu lintas
SKh-1.1.22.(7a) Rambu petunjuk Buah 200,000.00 2.00 400,000.00 0.009 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
SKh-1.1.22.(7b) Rambu larangan Buah 200,000.00 2.00 400,000.00 0.009 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
DIVISI 7. STRUKTUR
7.1 (8) Beton , fc’15 Mpa M3 1,252,042.41 888.56 1,112,519,812.00 25.293 12.647 12.647
7.9.(1) Pasangan Batu M3 781,339.83 299.76 234,217,635.23 5.325 0.887 0.887 0.887 0.887 0.887 0.887
LALU KURNIA DARMAWAN,ST APRIAN HADI, ST. MUHAMMAD ZIELFAN SURAHMAYADI, ST. ZAHRATUL HAQIQAH, ST. I KOMANG ADHI MULYAWAN
NIP.19830717 200901 1 009 NIP : NIP. 19790423 201001 1 003 NIP : 19920527 202012 1 000 Site Engineer Direktur