Check List for Irrigation Works

Project Name Celebration Plaza Al Shamka


Employer Department of Municipalities and Transport, Abu Dhabi City Municipality.
Contractor Basatin Landscaping
Checklist Title: Check List for Irrigation Works Checklist No. BAS-OTK-SHM-ICL-0011; Rev.00
Works Location: Related ITP # BAS-OTK-SHM-ITP-0011; Rev.00
Related Drawing(s) Related MS # BAS-OTK-SHM-MS-0011; Rev.00
Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA

1 Proposed approved shop / Survey drawing

2 Check availability of PTW/ NOC from concerned authorities

Check all existing utilities clearance / NOC/ PTW from respective


2.1
concerns.
Check inverts elevation with utility contractor for services
3
connections.
Check the services connections are properly connected. Check
3.1
that unions are installed downstream of valves
Ensure that open ends of the pipes and flanges and valves shall be
3.2
closed, when work is in progress
Pipe Pressure test are done for main pipe line
3.3
(10 bar @ 8 hour)
Detectable Warning Tape already placed as per approved MIR and
3.4
inspected

3.5 Flushing test is done after completion of system test

3.6 Operational test for the whole irrigation network system is done

3.7 Compaction shall be 95% MDD in every layer of Backfilling

Remarks: