INSPECTION & TEST PLAN (ITP) FOR INSTALLATION OF IRRIGATION SYSTEM

DEPARTMENT OF MUNICIPALITIES AND


Employer Project Celebration Plaza Al SHAMKA ITP Ref. No. BAS-OTK-SHM-ITP-0011; Rev.00
TRANSPORT
Engineer OTAK International Discipline Irrigation Works Date 11-08-22
Contractor Basatin Landscaping MS Ref. No. BAS-OTK-SHM-MS-0011; Rev.00
Responsibility
Applicable
Inspection / Test to be carried Frequency of Test / Control Data / Contractor
SN Acceptance Criteria Specification / Inspection Method
out Inspection Forms Engineer Third Party
Standard Subcontractor (if
Main Contractor
applicable)
1 Pre-Construction Activities
Submit to the
1.1 Approval of Method Statement Before Work Approval from Employer Std. Spec.- ADM Submittal form P R R/A N/A
Engineer
Landscape and
Approval of Inspection Test Public Realm by Submit to the
1.2 Before Work Approval from Employer Submittal form P R H N/A
Plan Department of Engineer
Municipalities and Submit to the
1.3 Approval of Materials Before Work Approval from Employer Transport (DMT), Submittal form P R R/A N/A
Engineer
ADM. /
IFC drawings Submit to the
1.4 Approval of Shop Drawings Before Work Approval from Employer Submittal form P R R/A N/A
Engineer
2 Main Activities
Visual inspection of
excavation side
Survey slopes & formation;
2.1 a. Setting Out Every Area Ensure to marked the points and coordinates P W R/A N/A
Data/Checklist Survey check on
preliminary
formation/WIR
Ensure that the depth of the trenched excavated shall Approved
2.2 b. Trenching & Sand bedding Every Area be in accordance with approved drawing and excavation Visual Inspection P W R/A N/A
specification 1. Standard permit/checklist
Specification- ADM
c. Installation of HDPE / uPVC As per Method Statement, MIR, Shop drawing & Landscape and MIR / Visual Inspection /
2.3 Every Area P W R/A N/A
Pipes & Fittings Specification Public Realm by WIR/checklist WIR

As per Method Statement, MIR, Shop drawing & Department of MIR / Visual Inspection /
2.4 d. Installation of Valve assembly Every Area Municipalities and P W R/A N/A
Specification WIR/checklist WIR
Transport (DMT),
As per Method Statement, MIR, Shop drawing & Abu Dhabi City Visual Inspection /
2.5 e. Flushing of pipe lines Every Area Municipality. / WIR/checklist P W R/A N/A
Specification WIR

As per Method Statement, MIR, Shop drawing & 2. IFC drawings, Visual Inspection /
2.6 f. Installation of Bubblers Every Area WIR/checklist P W R/A N/A
Specification details WIR

As per Method Statement, MIR, Shop drawing & 3. Project Visual Inspection /
2.6 f. Installation of Irrigation heads Every Area WIR/checklist P W R/A N/A
Specification Specifications- WIR
Section-8
g. Installation of Irrigation As per Method Statement, MIR, Shop drawing & MIR/WIR/checkli Visual Inspection /
2.7 Every Area P W R/A N/A
Control System Specification st WIR

As per Method Statement, MIR, Shop drawing & Visual Inspection /


2.8 h. Concrete works Every Area WIR/checklist P W R/A N/A
Specification WIR

As per Method Statement, MIR, Shop drawing & Visual Inspection /


2.9 i. Concrete pads Every Area WIR/checklist P W R/A N/A
Specification WIR

Page 1 of 2
INSPECTION & TEST PLAN (ITP) FOR INSTALLATION OF IRRIGATION SYSTEM

DEPARTMENT OF MUNICIPALITIES AND


Employer Project Celebration Plaza Al SHAMKA ITP Ref. No. BAS-OTK-SHM-ITP-0011; Rev.00
TRANSPORT
Engineer OTAK International Discipline Irrigation Works Date 11-08-22
Contractor Basatin Landscaping MS Ref. No. BAS-OTK-SHM-MS-0011; Rev.00
Responsibility
Applicable
Inspection / Test to be carried Frequency of Test / Control Data / Contractor
SN Acceptance Criteria Specification / Inspection Method
out Inspection Forms Engineer Third Party
Standard Subcontractor (if
Main Contractor
applicable)
Pre-Construction Activities
3 Testing

Immediately prior to hydrostatic testing, all irrigation


lines shall be thoroughly purged of entrapped air. Main
line piping system may be tested in sections. Lateral
system shall be tested valve by valve, water shall be
discharged from a single out led by manipulation of
Project
j. Purging and Every 500 ln. meter zone control valve and installation of temporary caps. Visual Inspection /
3.1 Specifications- WIR/checklist H H/W R/A N/A
Pressure/Hydrostatic test installed Introduce water into lines to be tested at full operating WIR
Section-8
head, observe water flow at end discharge point until
determination is made, and that the air and residual
debris has been expelled from the line. Confirm with
the consultants request prior to discontinuing inlet
water flow.

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveillance, A: Approval, P: Perform / Execute

0 Issued for Review / Approval QA/QC Engineer Project Manager