SI NO ACTIVITY HAZARD/ CAUSE OF CONSEQUEN RISK RISK RISK RECOMMENDED CONTROL MEASURE RISK RISK RISK Responsible
ASPECT HAZARD CE/ EVALU RATIN LEVEL EVALU RATI LEVEL
AND IMPACT ATION G ATION NG
CONDITION
THAT DEVELOP
THE HAZARD
P S P*S (H/M/ P S P*S (H/M
L) /L)
1 Personnel • Unfamiliar • Lack of • Physic 3 3 9 H • Sites induction course to all personnel. 1 3 3 L Logistic FM
Mobilization with the informatio al • TBT regarding the procedure, hazards and risk Engineer
work area n about Injuries to be conducted prior to start of work.
and nature the work • New personnel to be identified and brief ed on
of work procedur the task and responsibilities.
es and • Minimum PPE must be worn at all times and
related specific
hazards • PPE should be provided and use.
2 Survey and • Manual • Improper • Person 3 3 9 H • Site will be inspected thoroughly to ensure a 1 3 3 L Surveyor
setting out Handling handling nel safe working environment. Engineer
works (operation of survey Injury/ • No unauthorized entry. Basic PPE including
of hand instrumen Fatality footwear to be worn full time on site.
tools and ts and • Health • All existing survey pegs will be identified
survey working issues properly and protected site, Use of basic PPE
instrument) in open (helmet, shoes, reflective jacket and glass)
installing area. mandatory.
(pounding • Ignore • HSE Induction, pre-task safety talk.
into the moving • Use vehicle to transport surveying instruments
ground of vehicle for long distance.
survey working • Adopt good manual handling techniques.
markers, near • Survey markers will be driven to the ground with
Dust, painted wooden pegs or steel survey rebar with
• Working rebar caps, flags will be avoided.
near to • Hand and eye protection will be worn while
moving driving the survey markers.
• Use of dust mask and safety glasses.
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
7 Underground • Fire/ • Equipme • Minor/ 4 4 16 E • Ensure all works carried out near by the existing 1 4 4 M CM
utilities Explosion nt's and Major facilities are only after obtaining necessary work Engineer
• Personal Machineri Person permits from the area of authority. Operator
Cut injuries es al • Get the approved drawing along with the
• Head Injury condition Injuries excavation permit prior to dig.
• Loss of • Human • Seriou • Only manual excavation to be done close to the
body parts interferen s injury services (if any), Cable detector to be used
• Damaged ce • Asset frequently to verify the cable existence.
to existing • Other Damag • If any damages occur to any services.
utilities contracto es Immediately stop the work and inform to the
(while rs • Loss of concerned authorities.
excavating) • Reputa • All vehicle and machineries should be fitted with
• Electrocutio Unauthori tion spark arrestors.
n zed work • Delay • All combustible materials should be removed
• Property of from the area.
damage Project • Maintain good housekeeping standards at site.
• Ensure all hazards in the job are communicated
with the site personnel during the daily tool box
talk.
8 Concrete • Slip and trip • Failure of • Minor/ 4 4 16 E • Toolbox talk and training prior to start of activity •
4 1• 4 • M CM
Works fall equipmen Major • Adequate and suitable PPE to be provided Engineer
• Exposure / t Person • Equipment to be inspected prior to use and Supervisor
contact with • Poor al must have a valid Third-Party Certificate
cement maintena Injuries • Safe access and egress to work area to be •
• Concrete nce • Seriou provided
mixer • Lack of s injury • Personnel exposed to noise and vibration must
• Rotating training • Asset be rotated
parts of the and Damag • Work under strict supervision by approved
mixer competen es Competent Person
cy
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
12 Pressure • Hi pressure • Faulty • Minor/ 4 4 16 E • Safety signs and barrication of the testing area 1 4 4 M Irrigation
Testing leak of equipmen Major • Only competent operator shall carry out the Engineer
water t Person pressure testing Supervisor
• Failure of • Failure of al • Pre-task briefing to be conducted prior to the
motor pump Electrical Injuries work
• Gasoline circuit • Seriou • All related PPE to be complied with
• Fire • Poor s injury • Precautions should be taken to ensure people
/explosion maintena • Asset remain out of testing area
nce Damag • Area to be cleared of ignition sources
• Lack of es • After completion of the pressure test, release
training • Loss of the water and disconnect all of the temporary
and Reputa connection and close both ends
informatio tion
n • Delay
of
Project
13 Backfilling • Mechanical • Lack of • Minor/ 4 3 12 H • Activity will be under close supervision at all 1 3 3 L Foreman
work Failure of training Major times Engineer
equipment. • Lack of Person • Drivers /operators to inspect and report any Operator
• Overturning supervisi al defects found in their vehicles and equipment 's Flagman
of vehicles. on Injuries • Unloading area to be leveled and compacted.
• Damage to • Failure to • Seriou • Work area to be cordon off to prevent
existing inspect s injury unauthorized entry.
utilities and • Asset • Banks man / flagman with clean solid yellow or
• Inclement report Damag green high visibility vest and
weather es
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
RISK MATRIX
SEVERITY (CONSEQUENCE)
PROBABILITY
Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5)
Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Frequent (5) 5 10 15 20 25
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk
Project CLIENT CONSULTANT CONTRACTOR
Celebration Plaza-Al
Shamka
YES NO
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk