Ra-30 Asphalt Works

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 01

SI NO ACTIVITY HAZARD/ CAUSE OF CONSEQUEN RISK RISK RISK RECOMMENDED CONTROL MEASURE RISK RISK RISK Responsible
ASPECT HAZARD CE/ EVALU RATIN LEVEL EVALU RATI LEVEL
AND IMPACT ATION G ATION NG
CONDITION
THAT DEVELOP
THE HAZARD
P S P*S (H/M/ P S P*S (H/M
L) /L)
1 Personnel • Unfamiliar with • Lack of • Physical 3 3 9 H • Sites HSEW induction course to all personnel. 1 3 3 A Logistic FM
Mobilization the work area information Injuries • All personnel must be trained according to approved Engineer
and nature of about the work • training matrix .
HSEO
work procedures and • New personnel to be identified and brief ed on the task
• Lack of training related hazards and responsibilities.
• New personnel will not be allowed to work alone.
• All new workers must be distinguished, monitored, and
evaluated every week.
• Minimum PPE must be worn at all times and specific PPE
should be provided and use.
• Bus pick up and drop point to be identified.
2 Preparatory • Unfamiliar with • Unauthorized • Physical 3 3 9 H • Pre-task briefing / Daily activity briefing to be conducted 1 3 3 A Foreman
works the work area personnel on injuries to workforce on the task and hazards using RA. Engineer
and nature of site • Serious • Supervisor ensure all personnel provided with mandatory
HSEO
work • Use of injuries and specific task required PPE.
• Defective or damaged • Work area to be visually inspected for any hazard,
damaged tools & equipment adjacent activity or unusual condition by supervisor.
Equipment • Hazards not • Work area demarcation / isolation and provision of
• Slip, trip & fall identified HSEW signages.
Uneven, untidy of • Personnel not • Supervisor to arrange the placement of tools, materials
ground, slipping inducted and equipment to avoid slips, trips and falls
tripping off • Inadequate • Supervisor to ensure that all tools and equipment have
• Unauthorized supervision been inspected and color coded / tag to ensure that the
entrants to work PMV department inspected them prior to use.
site.

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International ~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• Tools & • Site Engineer to inspect the work area prior to the Task
equipment not for adequate access, material storage isolated work area,
inspected. site hazard assessment completed and adherence to
• No work area project and legal requirements.
demarcation or • Clear pedestrian access must be provided to the public
isolation and residence.
3 Survey and • Manual Handling • Improper • Personnel 3 3 9 H • Site will be inspected thoroughly to ensure a safe 1 3 3 A Surveyor
setting out (operation of handling of Injury/ working environment. Engineer
works hand tools and survey Fatality • No unauthorized entry. Basic PPE including footwear to
survey instruments • Health issues be worn full time on site.
instrument) and working in • All existing survey pegs will be identified properly and
installing open area. protected site, Use of basic PPE (helmet, shoes,
(pounding into • Ignore moving reflective jacket and glass) mandatory.
the ground of vehicle working • HSE Induction, pre-task safety talk.
survey markers, near • Use vehicle to transport surveying instruments for long
Dust, distance.
• Working near to • Adopt good manual handling techniques.
moving vehicle • Survey markers will be driven to the ground with
and machines painted wooden pegs or steel survey rebar with rebar
• Exposure to caps, flags will be avoided.
adverse weather • Hand and eye protection will be worn while driving the
condition. survey markers.
• Crossing the live • Use of dust mask and safety glasses.
road • Regular dust suppression for dust control.
• Standing nearby • Close Supervision.
live road • No working close to moving machines.
• Exclusion zones by provide barricades I cones.
• Post look-out / banksman.
• Adequate rest work interval breaks.
• Stop work in case of heavy wind, move workers to safe
place.
• Cross only on designated or identified crossing area /
pedestrian.

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

4 Transportation • Driving in graded • Not follow safe • Roll over, 4 4 16 E • Trained (defensive driving) driver with valid UAE license. 1 4 4 A Logistic FM
road / sand driving road traffic • Obey traffic rules and regulations Engineer
• Driving in fog and practices and accident, • Seat belt to be worn by driver.
sandstorm, road traffic vehicular • Ensure proper traffic management plan to organize HSEO
• Over speeding rules. fire, stuck up vehicle traffic on site.
• Driver / Operator • Adverse in sand • Flagman should be available to guide the vehicle and
health weather Vehicle driver for reversing and controlling the traffic.
performance condition breakdown • Schedule timing for all de liveries to avoid congestions
• Poor onsite.
maintenance • Use of warning light system (glowstick), Banks’s man /
flag men et c.
• No driving during heavy fog or sandstorm when visibility
is significantly affected.
• Pre-use inspection by driver using daily vehicle checklist.
• Monthly inspection and preventive maintenance.
• Ensure reversing vehicle provided with banks man if
hazards exit (oncoming vehicle traffic nearby workers
etc.
5 Working near • Struck by vehicle • Activity not • Personal 4 4 16 E • TBT conducted before start work. 1 4 4 A Foreman
live traffic • Traffic hazard and supervised injury • Permit to be obtain from traffic department if traffic is Engineer
collision by • Flagman / • Serious going to be obstructed. Flagman
Working close to vehicle which signal man not injury • Proper demarcation / isolation of work area.
motor way lead to health present to • Fatality • Workers will wear high visibility jacket at all times and HSEO
and hazard guide • Asset have a flagman present.
injuries • Incoming traffic damaged • Roads must be crossed using designated points or only
• Working when the traffic flow has stopped i.e red lights interval
without permit • Designate proper bus stop which cannot obstruct the
traffic to load and unload operatives.
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• Unauthorized • Minimum PPE is to be worn – hard hat, safety jacket and


person work on coverall and Safety Shoes.
equipment • Person never to cross the road whilst the traffic is flowing
• Unapproved • Prohibition of using mobile phone during driving
Detour /operating and while working.
• Use only approved routes –shortcuts is not allowed
• Ensure that all project site access is maintained in a neat
and tidy conditioned
• Road derivation should be done according to the ITC
Permit
• All road signages should be placed as per the approved
Detour drawings .
• Specific internal training for road safety shall be
conducted to the drivers and operators
• Assigned trained flagman to control traffic where needed
inside the barriers only
• Dummy flagman should be assigned
• Segregate working area and live traffic by suitable means
as per approved detour drawing (Concrete barriers or
water filling jersey barriers
• Speed limit on site must be followed
• Approved detour permit to be available at site.
6 Working • Employee hit by • Employee in • Personnel 3 3 9 H • Close Supervision for the work activates 1 3 3 A Foreman
adjacent to heavy equipment vicinity to injury • Certified Banks man to be availed for equipment’s for Engineer
Equipment • During the road heavy equipment reversing, HSEO
works equipment • Each equipment must be fitted with reverse alarm
Man-machine • Simultaneous flashing light and fire extinguisher
interface activity • Safety training and toolbox talk to include all active
safety measures and emergency procedure.
• Equipment to be inspected before starting the job
• Labors are not allowed to stay too close to equipment’s
• Specific PPE include high visibility vest must be worn.
• Speed limit on site must be followed .

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• No activity to be authorized within moving equipment


work radius. Stop work must be implemented.

7 Plant and • Struck by moving • Activity not • Personal 4 4 16 E • TBT conducted before start of work 1 4 4 A Foreman
equipment plant and supervised Injury • Activity to be supervised at all times Engineer
movement equipment • Flagman/ signal • Serious • Only certified (UAE driving license) drivers and operators Operator
• Caught in man does not Injury are allowed to use the vehicle and equipment Flagman
between present to • Damage to • Only licensed (UAE registration license) inspected and
HSEO
• Collision guide property tagged vehicle and equipment will be deployed at site
• Turn over operators / • Certified plant and operator with valid TPI certificate
• Failure of load drivers • All drivers and operators with adequate training
• Overloading • Flagman / signal man with third party training to be
• Unsecured load present to control movement of plant and equipment
• Area not and personnel.
isolated from • Load to be tie-in securely
plant and • Area to be cordoned off
equipment • On arrival inspection to be implemented and inspection
operation done by competent person.
• Inspection tag to be fixed for equipment including hired
equipment.
8 Loading and • Manual handling • Use of • Physical 4 4 16 E • Worker should be trained on manual handling procedure 1 4 4 A Logistic FM
offloading of • Unauthorized use defective injuries , working gloves shall be provided to personnel and Site FM
equipment and of equipment’s equipment s • Serious adequate supervision to be provided Engineer
materials • Loading and for loading and injury • TBT shall be conducted on daily basis prior to start of the
HSEO
offloading offloading • Damage to activity
• Incorrect purposes property • Only authorized licensed and 3rd party trained personnel
slinging/ragging • Unauthorized • Vehicles turn shall be allowed to operate equipment for unloading and
technique personnel over materials
• Unstable or inside lifting • Material and • Only third-party certificate equipment shall be used for
unstable ground area equipment the loading and off-loading of materials and equipment
surface fall off from shall be inspected before use
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• Pinch points • Unexpected transport • Loading and offloading area shall be isolated, barricaded
moment of vehicle shall be erected to prevent unauthorized personnel from
load entering
• Equipment • Tag line shall be used to control load during loading and
overloading offloading activity
• Miscommunica • Electronic loads indicator and load chart shall be used at
tion during all times. Weight of material or equipment shall be
work established prior loading and offloading of materials and
equipment.
• Only one rigger (experienced and third party certified)
shall give signal to equipment operator to avoid
miscommunication
• Only experienced and third-party certified rigger shall
perform slinging and rigger technique for all loading and
off-loading activity
• Ground surface must be inspected to ensure sufficient
compaction to operate any lifting equipment. Plan the
travel path and ensure route is clear of obstructions.
• Personnel shall keep their hands and other body pinch
point areas; adequate supervision shall be provided
during the loading and offloading activity
9 Cleaning of • Dust inhalation • Lack of PPE • Physical 3 3 9 H • TBT regarding the procedure hazard and risk to be 1 3 3 L Foreman
granular sub- • Noise • Lack of injuries conducted prior to start the work Engineer
base layer • Blow out of inspection of • Serious • Minimum PPE must be worn at all times and specific PPE HSEO
compress air hose air compressor injuries should be provided and use
• Whiplash and hose • Air compressor and all its components to be inspected
and must be in a good condition prior to use
• Air compressor connection to be fixed with whip check
• Machine and air hose to be checked for defects
• Air to be released before disconnecting the hose and
after finishing the work
• Work under strict supervision by competent person

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• Work area should be barricaded with suitable waring


signages

10 Application of • Inhalation of toxic • Lack of training • Damage to 3 3 9 H • Training to be provided prior to start of work (TBT, 1 3 3 A Foreman
prime coat & substance • Lack of property Manual handling hazards) Engineer
tack coat • Skin irritation supervision • Physical • Minimum PPE must be worn at all time and specific PPE
• Burn • Specific PPE injury Should be provided and use as per MSDS HSEO
• Equipment fire not provided • Serious • Material to be handled, stored, and use as per MSDS
• Lack of injury • Personnel using the chemicals to be briefed about MSDS
inspection of • Equipment to be inspected and in good condition prior to
equipment start of activity
• Lack of • Equipment must have adequate fire extinguisher
firefighting • Work under strict supervision by competent person
equipment • Work area to be barricaded with suitable warning sign

11 Laying of asphalt • Moving plant and • High risk of • Personnel 4 4 16 H • Permit to work from the authority to available at the 1 4 4 A Foreman
equipment operatives injury or work activities Engineer
• Man machine getting strike damage to • Entire working area should be isolated to restrict the
Interface by the moving equipment unauthorized entry HSEO
• Working without plant / • Ensure that prior to start the activity hazards are
supervision equipment’s identified and shall be completed and communicated to
• Faulty • operational the operatives by the concerned site engineers
equipment’s blind spots etc. • Install sign to warn of hazards and barriers to prevent un
• Working area not which may authorized entry to work area
isolated result in • No person is allowed to enter the working area during
• Exposure to hot serious injury equipment are in motion
material, fatality in the • Flagman must be assigned on each corner to control the
• Fumes,/vapor event of an unauthorized entry into the working area
• Dust inhalation incident • All equipment should be good condition and third party
• Poor visibility • vehicle certified
(fog, sand storm) incidents
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International ~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• Only licensed and third party certified operators should


be mobilize on site
• Oil man should spray oil when the requirements is
moving away from the oil man with the concern of
operators only
• The roller and PTR operator should know the oil man is
spraying the wheel each time
• Each equipment must be fitted with reverse alarm,
flashing light and fire extinguisher
• No equipment is allowed to work without audible reverse
alarm and flash beacon lights
• Personnel will wear PPE such as gloves safety footwear,
safety glasses and safety helmets
• Equipment to be inspected before starting the job
• Use of mobile phones / hand free during the operation
and in working area is strictly prohibited
• Operator cabin should be free from curtains or any kind
of obstruction
• Activity should be done under full supervision by
foreman
• Safety training and tool box talk to include all active
safety measures and emergency procedure
• Labour are not allowed to stay too close to equipment
• Good housekeeping measures will be enforced in order
to prevent slips, trips and falls during material handling
• Banks man should be control any equipment during the
reversing of equipment
• Safety awareness should be given to all site employees
related to risk for working near to heavy equipment
• TBT supervision staff for prohibition of sitting close or
underneath to equipment
• PPE including high visibility vest must be worn

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International ~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• All required safety measures must be in place when and


where required such as barricades, warning sign boards,
flashing lights and detours safety measures.

12 Compaction • Struck by moving • Activity not • Damage to 3 3 9 H • Toolbox talks to be conducted daily 1 3 3 A Foreman
plant and supervised property • Only 3rd party certified operators are allowed to operate Engineer
equipment • Flagman / • Personal the equipment.
• Collision signal man not injury • Warning lights (headlight, brake light, indicators and HSEO
present to • Serious rotary light) must be in good working condition.
guide Injury • Only trained and experienced banks-man should be
operators / assigned in the control area.
drivers • Regular awareness training for drivers and operators.
• Inexperienced • Area to be isolated from unauthorized personnel.
operator
• Area not
isolated to
unauthorized
personnel
13 Working with • Vibration • Lack of • Personnel 3 3 9 H • Reduce exposure time, 1 3 3 A Foreman
Machine/ • Noise inspection of Injury • Job Rotation, Engineer
Power tools/ • Unguarded tools tools before • Proper Awareness and Trainings
HSEO
Hand tools • Personal injury use. • Proper compaction machine is recommended along with
due to use the • incompetent competent operator,
incorrect/unsafe operator • Use the correct the tool for the job.
Use of • Use of • Regular inspection of tools.
machineries/ homemade • Protect the sharp edges of tools that are to be stored or
tools tools carried.
• Inadequate • Rotating parts must be guarded.
training, • Renew wooden handles that are split.
instruction & • Keep hammer head tightly wedged on their shafts.
supervision, • Never allow any employee to prepare tool(homemade)
at workplace.
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• Bad condition • All employees should be properly instructed the safe


of hand tools, work procedure of all hand tools.
• Operating • Adequate monitoring shall be implemented to prevent
Procedures. the preparation of homemade tools.
• Use Proper PPE

14 Manual handling • Back injury due to • Lifting loading • Physical 3 3 9 H • Whenever practicable, mechanical lifting aid e.g 1 3 3 A Foreman
manual material beyond the injury • Cranes forklift truck etc. will be used to alleviate the Engineer
handling capacity of the requirement for manual handling.
• Individual individual • Supervision will be assess weight, center of gravity etc. HSEO
capacity • Improper lifting and determine the number of person required to carry
• Inadequate space technique the work safely
• Trip slip & fall • Lack of training • Personnel will be trained in manual handling techniques.
instruction& • Gloves/safety footwear will be worn by personnel
supervision. engendered in manual handling.
• Inadequate • Avoid manual load is lifting if possible. If not then, cheek
lighting below the recognized permissible limits.
condition • Stand as close as possible to the object to be lifted Bend
• Slippery the knees as much as possible
surface • Bend hip keeping head &back as straight to tit the object
or load the object
• Lift gradually using leg and stomach muscles
• Use body weight to tilt the object or load the object
• Avoid twisting and sudden movement to body while
lifting the load.
• Train the staff for good posture, slip resistance shoe with
toe protection.
15 Weather • Dust, Heavy wind, • Heavy wind can • Uneasiness, 3 3 9 H • Awareness training shall be given to all personnel 1 3 3 A Site FM
condition and sandstorms cause eruption breathing • Heat stress training to be conducted to all workers. Engineer
site environment • Heat Stress of dust, sand, & problem, eye • Personnel to avoid working in storm and windy
accumulation injuries, poor condition. HSEO
Working under • Employees visibility, lack • Sprinkle water for dust suppression.
direct sunlight exposed to of stability • Ensure emergency vehicle available at site.
heat during lifting • Personnel to wear dusk mask as and when required
NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

• Dehydration and manual • Provided water cooler and rest shelter as required
• Hot working handling of • Acclimatization for new personnel or personnel coming
environment loads from vacation
• Dress for the conditions lightweight, loose clothing is
best avoid layering clothing underneath coverall
• Sufficient cold drinking water and other supplement for
dehydration will be available on job site.
• Personnel to have a well balance diet avoiding heavy and
fatty foods
• Personnel avoid caffeine and alcohol the night before
and during the day
• Water breaks at least every 20-30 minutes
• Intermittent breaks or rotation of personnel to be
implemented
• Shaded areas will be provided for short breaks
• Work stop during summer break time as mandated by
law
• Engineers and Forman to monitor their team for
symptoms of heat related illness.
• Personnel to stop activity and inform Foreman if he feels
something is wrong with his physical condition
• First aider available on site
• Emergency vehicle will be available on site.
16 Emergency • Inadequate • Lack of • Death / 3 3 12 H • First-aid box and trained first aider onsite. 1 3 3 A Engineer
Preparedness emergency consultation extensive • Emergency response should be in accordance with the HSEW Officer
response and loss project emergency response plan. Construction
arrangements. • Emergency contact number will be posted at site Manager
• Poor Emergency contact numbers are available with the HSE HSEO
communication Plan.
• Communication by mobile
• Emergency rescue drill to be conducted as per approved
HSE Plan.
• Project Emergency no. 050-820-6728

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

17 Site welfare • Inadequate • Lack of • Environment 3 3 9 H • Drinking water / rest shelter shall be arranged near to 1 3 3 A Foreman
facilities maintenance of management al pollution workplace Engineer
maintenance welfare facilities commitment • Health • Portable toilet and periodical cleaning. Admin
towards effects • Site shade, drinking water availability and sealed. Construction
welfare • First-aid box and trained First-aider. Manager
facilities • Mist fan to be provided if required.
• All workers to be provided with water bottle. HSEO
• Comply with covid19 guidelines (social distancing,
number of allowed person posted, sanitation, etc,)
18 Waste • Unhygienic • Waste is • Environment 3 3 9 H • Bins to contain trashes, no food waste / left over onsite. 1 3 3 A Foreman
Management conditions. disposed of in al pollution. Eating only at designated approved area. Engineer
• Lack of identified un- authorized • Health • Food waste, work debris, excess or unwanted material to Logistic FM
area for storage location that effects be removed. Construction
& segregation can cause Outbreak of • Waste segregation and disposal practices. Manager
• Ineffective problem epidemic • Communication of the MSDS.
clearing. Fine • Emergency response for storage of hazardous waste. HSEO
• Un-identifications • Biological waste (medical waste) are not allowed to litter
of hazardous collected and maintained in sealed container and
chemicals. disposed of properly.
• Waste • Minimization of waste generation encourages waste
minimization segregation at source, recycle reuse and/or utilize in an
program is not environmentally friendly manner.
available • Municipality licensed approved waste transporter to be
used.
19 Housekeeping • Tripping hazard • Improper • Slips and 3 3 9 H • Housekeeping on daily basis. 1 3 3 A All
• Fire hazard arrangement of trips • Fire Extinguisher to be provided on site.
materials • Personnel • Skips/ drums to be provided to dispose debris.
Injury • Food waste should be removed from site on daily
basis
• Work area housekeeping before, during and after work.

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

20 COVID19 • Contact with • Lack of Social • Breathing 4 4 16 E • Distribution of COVID-19 information through Daily 1 4 4 A All
covid19 positive distancing and problem, Toolbox talks.
not following • Lost of taste • Hand wash regularly
covid19 • Health • Maintain social distancing
protocols problems • Provision of PPE (face mask)
• Fatality • Covid19 Emergency Plan
• Wear mask at all times
• Display of various COVID -19 Posters and information in
multilingual languages at all NAS Facilities.
• Monitoring of all personnel for signs of fever, dry cough,
headaches, shortness of breath and sore throat.
• Deep cleaning/disinfection programs for all camps, site
offices, warehouses and NAS facilities to be conducted.

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

c.J..-ii-.i.-Jlq uLp. ....LJI oj--Jb ' NOOR AL SAHARA


DEPARTMENT OF MUNICIPALITIES
AND TRANSPORT
'.~

International
~1.!
Basatin 1, ,~,.µuJ~
lu dsop 1ngllC
GENERAL CONTRACTING l,L,C.

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

SEVERITY (CONSEQUENCE)
PROBABILITY
Insignificant (1) Minor (2) Moderate (3) Major (4) Catastrophic (5)
Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Frequent (5) 5 10 15 20 25
absolutely unacceptable high
activity should not proceed in current form
15 - 25 Extreme Risk (E)

unacceptable high
activity should be modify to include remedial planning and action and be
8 – 12 High Risk (H)
subject to detailed HSE assessment

acceptable but must be manage at ALARP


activity can operate subject to management and/or modification
4–6 Moderate Risk (M)

acceptable w/o required further action


no action required unless escalation of risk is possible
1-3 Low Risk (L)

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR
CLIENT CONSULTANT CONTRACTOR SUB-CONTRACTOR

PROJECT TITLE: PORJECT: CELEBRATION PLAZA AL SHAMKA DATE OF ISSUE 18/10/2022


Reference No. NAS--HSE-RA-01
Risk Assessment: Asphalt work REVISION NO. 00

RISK ASSESSOR REVIEWED and APPROVED BY:

NAME : Renato Vince Cruz Jr. DESIGNATION: HSEW Engineer NAME: Yaser S. Diab DESIGNATION: Project Manager

SIGNATURE DATE: 18/10/2022 SIGNATURE DATE: 18/10/2022

NAS GROUP (EPD) E= Extreme Risk, H= High Risk, M = Medium Risk, L = Low Risk, A = Acceptable Risk RVCJR

You might also like