DOCUMENT NUMBER, REV & TITLE: 2419-68223AC-X003-001 Rev.C ,MANUFACTURING PROCEDURE SPECIFICATION Last Review status: Rev.B
SR.
SEC. COMPANY COMMENTS VENDOR / CONTRACTOR RESPONSE REMARKS
NO
1 of 1
SAUDI ARABIAN OIL COMPANY
LONG TERM AGREEMENT (LTA) FOR OFFSHORE FACILITIES
SAUDI ARAMCO CONTRACT NO.
6600038261 (OOK) & 6600038262 (IK)
UNDER BI-12-22000
ARAMCO: N/A
MANUFACTURING PROCEDURE
REV:.C
NPCC: 2419-68223AC-X003-001 SPECIFICATION
ARAMCO: N/A
MANUFACTURING PROCEDURE
REV:.C
NPCC: 2419-68223AC-X003-001 SPECIFICATION
REV.
DATE PAGE NO. DESCRIPTION
NO
A 23-NOV-22 - Issued for Review / Comments
B 09-DEC-22 - Issued for Review / Comments
C 15-12-2022 - Issued for Review / Comments
SAUDI ARABIAN OIL COMPANY
LONG TERM AGREEMENT (LTA) FOR OFFSHORE FACILITIES
SAUDI ARAMCO CONTRACT NO.
6600038261 (OOK) & 6600038262 (IK)
UNDER BI-12-22000
ARAMCO: N/A
MANUFACTURING PROCEDURE
REV:.C
NPCC: 2419-68223AC-X003-001 SPECIFICATION
Table of Contents
TABLE OF CONTENTS
1.0 Purpose
2.0 Scope
3.0 Definitions
4.0 Reference
5.0 Responsibility
6.0 Procedures
8.0 Distribution
14.12.2022
Prepared by QCE
14.12.2022
Approved by AGMQHSE
TITLE : MANUFACTURING PROCEDURE Doc.Nr. : EX-MFD-002
SPECIFICATION -- Bollards ”. Rev.Nr. : 2
Project : Saudi Aramco (LTA) for offshore Facilities,
CRPO 87,14 Jackets in Manifa field , ARAMCO Contract Rev. dt. : 14.12.2022
6600038261(OOK) & 6600038262 (IK) under BI-12-22000. Page Nr. : 2 of 6
1.0 PURPOSE :
The purpose of this documented information is to ensure that manufacture of two types of
Bollards.
2.0 SCOPE :
Following bollards shall be manufactured using casting technique for Saudi Aramco (LTA) for
offshore Facilities, CRPO 87,14 Jackets in Manifa field , ARAMCO Contract 6600038261(OOK) &
6600038262 (IK) under BI-12-22000.
Sl.
Product Size Qty Properties ITP Ref. Drawing Reference
Nr.
3.0 DEFINITIONS :
Abbreviations used :
AGMQHSE - Assistant General Manager Quality Health Safety & Environment.
AGM-RW - Asst.General Manager – Rubber Works
APM - Assistant Production Manager
PE - Production Engineer
QF - Quality Format
WI - Work Instructions
SS / SSK - Stores Supervisor / Senior Store Keeper
PC - Production Coordinator
CK - Compound Keeper
TRE - ToolRoom Engineer
Doc.Nr. : EX-MFD-002
TITLE : MANUFACTURING PROCEDURE
SPECIFICATION -- Bollards ”. Rev.Nr. : 2
Project : Saudi Aramco (LTA) for offshore Facilities, Rev. dt. : 14.12.2022
CRPO 87,14 Jackets in Manifa field , ARAMCO Contract Page Nr. : 3 of 6
6600038261(OOK) & 6600038262 (IK) under BI-12-22000.
4.0 REFERENCES :
5.0 RESPONSIBILITY :
AGMRW, APM, PE, Supervisor, foreman, QCI/QCE are responsible for implementing this
documented information.
6.0 PROCEDURE :
6.1 Details from material specification ,2419-2022/68223 are taken into account in the Sale order /
work order received, Supervisor/Foreman to prepare the Production card, QF-RW-001, ensuring
that all the relevant information about the product,moulds, etc. are transferred to the Production
Card. White copy of the production card to remain with PE /supervisor and yellow copy shall be
handed over to the foreman, before starting the production. Foreman shall forward the production
card to the operators.
TITLE : MANUFACTURING PROCEDURE Doc.Nr. : EX-MFD-002
SPECIFICATION -- Bollards ”. Rev.Nr. : 2
Project : Saudi Aramco (LTA) for offshore Facilities,
CRPO 87,14 Jackets in Manifa field , ARAMCO Rev. dt. : 14.12.2022
Contract 6600038261(OOK) & 6600038262 (IK) Page Nr. : 4 of 6
under BI-12-22000.
6.2 Supervisor/Foreman shall raise all materials requisition. All material requisitions, after getting
the approval from PE/Supervisor, shall be handed over to the Stores which shall arrange the
issue of requested materials, depending on the stock/availability or arrange for the
procurement of the same, if required.
6.3 Based on the Sale Order, Supervisor/Foreman shall workout the requirement & forward the
requisition for Purchase department, if any.
6.4 Supervisor/Foreman shall verify the availability of the mould/die specified in the Sale order
with mould caretaker If the mould is available it is arranged for the production.
Supervisor/Foreman shall receive the mould and check the dimensions and for damages
/defects. If any, the same is to be rectified from tool room.
6.5 Factors influencing working environment inturn product quality such as noise,
temperature, humidity, lighting / weather are maintained / actions taken wherever
required.
6.6 After production is completed by the following methods the compounds unconsumed, if any
shall be returned to CK.
6.7 The steel for the casting shall be made from open hearth, electric duplex, acid Bessemer,
basic oxygen (L.D.) or a combination of these processes. Casting will be in accordance
with ASTM A781.
6.8 The casting shall be made under strictly controlled condition to ensure chemical
composition, soundness, and uniformity, correct grain size to develop shock resistance
properties and to avoid any blow-holes.
6.9 Bollards shall be heat treated at suitable temperature to ensure mechanical properties as
specified.
6.11.1 Grit blast areas to be rubber lined to Sa 2.5. The surface amplitude shall be in the range of 75
to 100 microns Clean the blasted areas to remove all dust and foreign particles by using dry
compressed air. Inspection to be done in accordance with SOP-Q-016. Presence of visible oil
or grease, if any, prior to blasting shall be removed by detergent washing and subsequent
water cleaning.
Responsibility : Operator / Foreman / QC
Doc.Nr. : EX-MFD-002
TITLE : MANUFACTURING PROCEDURE
SPECIFICATION -- Bollards ”. Rev.Nr. : 2
Project : Saudi Aramco (LTA) for offshore Facilities, Rev. dt. : 14.12.2022
CRPO 87,14 Jackets in Manifa field , ARAMCO Page Nr. : 5 of 6
Contract 6600038261(OOK) & 6600038262 (IK)
under BI-12-22000.
6.11.2 Paint coating system shall be as per APCS-19C and specification shall be as per
SAES-H-101V, SAES-H-001 and SAES-H-004
Apply APCS-19C ,Hempadur Multi-Strength GF 35870, Glass Flake Reinforced Polyester/
Epoxy - 750µ m min.
Responsibility : Operator
Item: 1) Bollard 1372 X 425 X 406 mm ( 54 " X 16¾ " X 16 ") : 29 Sets.
2) Bollard 762 X 286 X 229 mm ( 30 " X 11¼ " X 9 ") : 77 Sets
Unit of Testing
Tests Specified Value Remarks
Measure Standards
Chemical Composition
Carbon (C),max % 0.3 -
Mechanical Properties
Elongation,min % 24 -
Sl. Drawing
Product Size Qty ITP Ref. ITP Stage /
Nr. Reference
Serial No.
2419-
1372 X 425 X 406 mm ( 29 2419-68223AC-
1.0 Bollard 40 68223AC-
54 " X 16¾ " X 16 ") pcs X002-001
M001-001
2419-
762 X 286 X 229 mm ( 30 77 2419-68223AC-
2.0 Bollard 40 68223AC-
" X 11¼ " X 9 ") pcs X002-001
M001-001
3.0 CRPO colour code (GREY)
4 .0 Marking as per 2-SAMSS-005 with additional information of,
4.1 Client :
4.2.Project : SA-BI-12-22000-CRPO-87-MANIFA JKTS-NPCC-2419.
4.3. 9COM Number:
4.4 .Material Specification:
4.5.Mfr.Name ,Logo and Heat No :
4.6 PO Nr. and Project Nr. :
4.7. BOM item No & Piece No.:
6.15 The health and safety requirements for manufactuiring of Fenders shall be compliance with
Operational control procedure
1. Hazard Analysis & Environment Aspact & Impact Assessment ( SOP-OCM-029)
2. Emergency Preparedness & Respopnse ( SOP-OCM-031 )
3. Personnel Protective Equipment ( SOP-OCM-037 )
4. Blasting Operation ( SOP-OCM-041 )
5. Chemical Handling ( SOP-OCM-043 )
6. Crane Handling ( SOP-OCM-044 )
7. Forklift Operations ( SOP-OCM-045 )
8. Manual Handling(SOP- OCM-047)
7.0 DOCUMENTED INFORMATION :
7.1 QF-RW-001 - Rubber works Production card
7.2 QF-ORF-003 - Work order
7.3 QF-MLD-002 – Mould drawing
7.4 QF-MLD-001 – Production Card for Mould making.
7.5 QC-QC-034 – Daily Log sheet
7.6 QF-QC-031 - Work stop order
7.7 QF-OHS-007 – Risk Assessment moulding operation.
8.0 DISTRIBUTION :
AGMRW
PE
APM
TRE
Supervisor / Foreman
QCI