Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

26

16

21 38 1 21
5 6
25

22 25

14 19
4
17 12
37 4 16
27 28
38 20
31
28
7
33
36
12 34 8 37

28 29

23
33
28 25
37
11
30
25
13 32 24

Clipped for erection


10 10 80 to 120
typical
18
80
3 80

CLIPPED
“Drop-in” beam HVAC ducting “Gerber” System 2 END PLATE
CONNECTION
Lateral Support Stiffener
Drop-in segment Int. Stub Ext. Stub

CLIPPED 2-L
Cantilever 35 CONNECTION 9
beam Stub-girder span

Cap
Cantilever segment 15
Plate

BEAM SPLICE

Backing Bar Cap Plate


Pipe
Column
(Post)
Connection Angle
Base Plate

BEAM TO POST WITH


CAP & BASE PLATE
BEAM TO BEAM
FRAMING

You might also like