Joborderform 23004 MCB, M&S, WH

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Document No.

: MGI-2021JOF
Rev: 2

JOB ORDER

Company / Client NAME: Company / Client NUMBER AND EMAIL:


Gerard Gonzales / No Bia, Inc. pcgonzales@maxschicken.com
9163271521
Company / Client ADDRESS:
1215-C Governor's Drive, Brgy. Bancal, Carmona, Cavite

Job Request Description: JOB Order no.:


PLEASE CORRECT THE FOLLOWING LIST FOR GMP AUDITS: (Photos at the Right for Reference)
1. Request for Sandpaper 600&1000 to be given to MCB for them to do Scraping of floor painting; Finish it with Sandpaper 1
2. Pan washing Area Fire Ext transfer of location to left wall of entrance door
3. Protection Boulard or Guarding of Utilities at Oven/Proofer Area
4. Install stainless sheets at oven area floor drains as blinds
5. Scada51 (Inside Warehouse Outbound) re-install Control at the wall (nakalambitin)
6. Replace leaking faucet at chicken cooking line
7. Fix the Electrical Power Supply of the Machines at MCB Prod Area (please see ref. photos)
8. Fix screw blind plates at the floor of MCB Hallway and Production area near Mixers (Plates are just
at the floor not screwed so madali masipa and matanggal sa pwesto
9. Please apply sealant to Open Gap in the wall between Oven Area and Dough Area (Binabahayan ng Ipis)
DATE REQUESTED: May 17, 2023

Requested By: Approved By: Received By:


GCG
( signature over printed name ) ( signature over printed name ) ( signature over printed name )

Job Order Information:

MATERIALS USED: ( details and quantity ) Work Performed:

Recommendation/s:

Completion Date: Work Performed By:

( mm / dd / yyyy ) ( signature over printed name )

Requestor's Approval: Engineering and Maintenance Manager:

( signature over printed name ) ( signature over printed name )

Plant Manager:
( signature over printed name )
NO BIA FOOD MANUFACTURING AND DISTRIBUTION CENTER
POST SERVICE CHECKLIST
Check Item/s YES NO N/A Remarks

Machine is Operational

Machine parts is complete

Tools used was complete after service completion.

Unit/s was cleaned after service completion.

Unit/s was sanitized after service completion.

Work area was cleaned after service completion.


Document No: MGI-2021PSC Rev. 0

NO BIA FOOD MANUFACTURING AND DISTRIBUTION CENTER


POST SERVICE CHECKLIST
Check Item/s YES NO N/A Remarks

Machine is Operational

Machine parts is complete

Tools used was complete after service completion.

Unit/s was cleaned after service completion.

Unit/s was sanitized after service completion.

Work area was cleaned after service completion.


Document No: MGI-2021PSC Rev. 0