CM Pi 0381 TR 0437

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

‫ و‬FEED ,‫ﻃﺮاﺣﯽ ﭘﺎﯾﮫ‬,‫اﻧﺠﺎم ﺧﺪﻣﺎت ﻣﻄﺎﻟﻌﺎت ﻣﻔﮭﻮﻣﯽ‬

‫ ﻃﺮح ﺗﻮﺳﻌﮫ ﻣﯿﺎدﯾﻦ ﮔﺎزی ﮔﺮدان‬EPC ‫ﺗﮭﯿﮫ اﺳﻨﺎد ﻣﻨﺎﻗﺼﮫ‬


‫و ﺧﺎرﺗﻨﮓ‬
Contract No.:
COMMENT & REPLY SHEET
Comment Sheet No. : CM-PI-0381 Transmittal No. : PI-0437 PAGE: 1 OF 2

EORG No.: 60097 Transmittal Date : 1402/07/26 Discipline: PI

Item Revision Comment Clarification


Document Number Description
No. No. Status Status

1 10181-BD-KHT-01-PI-LYT-0001 KHARTANG WELL HEADS PRELIMINARY PIPING PLAN 01 AP

2 10181-BD-KHT-02-PI-LYT-0002 KHARTANG MANIFOLD PRELIMINARY PIPING PLAN 01 AP

3 10181-BD-GDN-01-PI-LYT-0004 GARDAN WELL HEADS PRELIMINARY PIPING PLAN 01 AP

4 10181-BD-GDN-02-PI-LYT-0005 GARDAN MANIFOLD PRELIMINARY PIPING PLAN 01 AP

5 10181-BD-KGS-03-PI-LYT-0007 KGS PRELIMINARY PIPING PLAN 01 AP

Comment Status :
CM – Comment as noted Clarification Status :
AC-Minor Comment, Accepted C – Comment be implemented immediately
IN-Information Only H - Hold By Consultant
AP-Approved O – Open. Need action
RJ-Reject
H-Hold By Client
Prepared By: Checked By: Confirmed By: Comment Date: Replied By: Confirmed By : Reply Date:

M.Ahmadi D.AZIMI S.KHADEMI

1402-07-26
‫ و‬FEED ,‫ﻃﺮاﺣﯽ ﭘﺎﯾﮫ‬,‫اﻧﺠﺎم ﺧﺪﻣﺎت ﻣﻄﺎﻟﻌﺎت ﻣﻔﮭﻮﻣﯽ‬
‫ ﻃﺮح ﺗﻮﺳﻌﮫ ﻣﯿﺎدﯾﻦ ﮔﺎزی ﮔﺮدان‬EPC ‫ﺗﮭﯿﮫ اﺳﻨﺎد ﻣﻨﺎﻗﺼﮫ‬
‫و ﺧﺎرﺗﻨﮓ‬
Contract No.:
COMMENT & REPLY SHEET
Comment Sheet No. : CM-PI-0381 Transmittal No. : PI-0437 PAGE: 2 OF 2

EORG No.: 60097 Transmittal Date : 1402/07/26 Discipline: PI

Item
Clarifications Comments Comments
No.